DRC Comments PD
THE-CITY-OF
COPPELL
..~.... * .. ..
~. . 0
ex" ,&q
8 -
THE-CITY-OF
CITY OF COPPELL
ORC REPORT
COPPELL
..~~ * ~~..
~ ~~o
e .t 1'\ S . \ e:. q
Proiect 10
Address
PD-O? -0040
Proiect Name
Pd-221r2-hc, Duke Lesley Addition,
Proiect Tvpe Re-Zoning PO
Aoolication Date 5/23/2007
Case Manaaer Gary Sieb
Proiect Description zoning change request from PD-221-HC (Planned Development-221-Highway Commercial) to PD-221R2-HC (Planned
Development-221 Revision 2-Highway Commercial) to attach a Detail Site Plan to allow for the construction of an
18?,535-square-foot, six-story hotel, with 260 rooms and ancillary uses,
1 of 1
Agency Reviewed By Review Date
Building Inspection Greg Jones 5/31/2007
Electric Jeff Curry 5/31/2007
Engineering Michael Garza 5/30/2007
Fire Administration Tim Oates 5/29/2007
Parks and Recreation
Planning Department
John Elias
Gary Sieb
5/30/2007
5/25/2007
Comments
1. No comments on zoning change.
No Comments Received
No comments.
1. Extend fire lane around the building.
2. Relocate fire hydrants adjacent to the building to
the other side of the fire lane.
3. FDC shall be within 50ft of a fire hydrant and on the
same side of the fire lane.
4. Fire hydrant dead-ends not to exceed 150ft.
5. Where is the loading zone? NE corner? Parking in
fire lanes is prohibited.
No comments.
SITE PLAN
1. Insure all landscape islands contain at least 150
square feet of I.s.
2. Parking for restaurants is 1/100 sq. ft. Explain note
regarding restaurant parking.
3. State width of landscaping on west side adjacent to
Point West Blvd.
4. Is 3.5 foot sidewalk wide enough for pedestrian
traffic?
5. Indicate total square footage of hotel in footprint of
building.
LANDSCAPE PLAN
1. Justify 7000 square foot landscape shortage.
2. Explain "mini-landscaped islands" containing Bald
Cypress trees.
ELEVATIONS
1. Indicate size and square footage of signage on
East, West, and South elevations.
2. It appears East and West elevations are reversed.
3. A colored drawing/elevation would be helpful in
explaining this request.
4. Provide color board showing building
materials/colors.
5_ Need detailed drawings of size, location,
construction materials of monument signage.
Memorandum
~R
Date: June 7. 2007
To: Marcie Diall\ond
~c:
From: Jeff Curry
Subject: May ORe
S-1241-C, Fat Daddy's Burger House - zoning change acceptable, please contact Larry Redick at
972.323.8917 to discuss electric service requirements.
Northlllke Woodlllnds Center, Lot 4, Block A, Minor Plat - plat unacceptable, please contact Larry
Redick at 972.323.8917 to discuss electric easement requirements.
PD-228-SF-9, The Chateaus of Coppell- zoning changc acccptable, please contact Jeff Curry at
972.888.1330 to discufls electric service requirements.
Arbor Manor, Preliminary Plat - plat unacceptable, pl~ase eontact Jeff CUTTY at 972.888.1330 to
discuss electric easement requirements.
,PD-2211U-HC, Duke Lesley Addition - zoning change acceptable, please contact Jeff Curry at
972.888,1330 to discuss electric scrvice requirements.
Duke Lesley Addition, Lot 2R Block C, Replat - plat unacceptable, please contact JetI' Curry at
972.888.1330 to discuss eascmcnt requirements.
PD-221R3-HC, Duke Lesley Addition - i',oning change accep(ahle. please contact Jeff Curry at
972.888.1330 to discuss electric Sl;:rvi<.:e requirements.
1lD-222R-LI, Duke Lesley Addition - zoning change acccptable. please contact Jeff Curry at
972.888.1330 to disl;USS electric service requirements.
Duke Lesley Addition, Lot I, Block AI Final Plat - plat unacceptable, please contact Jeff Curry at
972.888.1330 to discuss electric easement requirements.
Bethel Business Park, Lot 1, Block A, Site Plan - site plan acceptable, please contact Jeff Curry at
972.888.1330 to discuss clectric service requirements_
Bethel Business Park Lot 1, Blo.:k A, Minor Plut - plat unacceptable, please contact Jeff Curry at
972.888.1330 to discuss electric easement requirements.
CONFIDENTIAL
~>2'd
260L t.>m: 2L5: 01
t.>0n8882L5
^~3nIl3a J3l3 nXl:WO~j 8~:t.>1 L002-L0-Nnr