Project 10
PD-07-0008
Address 1001 W Sandy Lake Rd
Proiect Name
PD-224-hc Northlake College
Proiect Tvpe Re-Zoning PO
Application Date 2/14/2007
Case Manaaer Marcie Diamond
Proiect Description from C (Commercial), Highway Commercial (HC) and LI (Light Industrial) to PD-224-HC (Planned
Development-224-Highway Commercial) for College and ancillary uses on approximately 37 acres of property and to
attach a Detail Plan for Phase 1 to allow the construction of a 37,OOO-square-foot building on 9 acres of property at the
Agency
Building Inspection
Electric and Gas
Engineering
1 of 3
Review Date
2/22/2007
2/22/2007
2/19/2007
Reviewed By
Greg Jones
Jeff Curry
Ken Griffin
Fire Administration
Tim Oates
2/21/2007
Parks and Recreation
Planning Department
John Elias
Marcie Diamond
2/19/2007
2/20/2007
Comments
1. No comment. No floor plans or info sent.
No Comments Received
Site Plan
1. Is the median opening going to be proposed on
Royal Lane to accommodate northbound traffic on
Royal Lane? If so, you will need to shift your northern
driveway approximately 60 - 90 feet to the south to
align with the existing driveway on the east side of the
road.
Utility Plan
2. Please be advised that even though you are
showing a proposed 10" sewer line to flow to the south
and tie into the existing 8" sewer line may be
inadequate for your development. The City of Coppell
is in the process of obtaining a sewer analysis for this
property analyzing capacity through the existing 8"
sewer line to the north or tying into the existing 8" at
the intersection of Royal Lane and Northpoint Dr. or
running a completely new sewer line that would go to
the intersection of Royal Lane and Northpoint Dr., and
then go east on Northpoint Dr. and tie into an existing
15" sewer line in Cottonwood Creek.
1. FDC appears to be in a parking stall. FDC and Fire
Hydrants are required to be visible and accessible,
minimum of 3ft of clear space around them.
No comments.
Sheet C100 - Site Plan
1. Re-Iabel to "Concept Site Plan"
2. Revise Data Table as follows:
. Existing Zoning: HC/L1/C
· Proposed Zoning: PD-224-HC
. Building Area - add "Phase 1"
.Parking Required:0.281 spaces per campus
population (students + staff) = 166 spaces (per NLC
study)
1 space per day student = 456 spaces (per Coppell
Zoning Ord.)
8 spaces per classroom = 128 spaces (per Coppell
Zoning Ord.)
Parking Provided (Phase 1): 300 spaces
3. Add Zoning districts adjacent to the property
4. Include dimensions of the boundaries of the
THE.CITY.OF
COPPELL
~" .,"','
~ * ..
r ~
e q
.t .-\ I) . \ &
Agency
Revjewed By
THE-CiTY.O,..
CITY OF COPPELL
ORC REPORT
COPPELL
.~~* tJ~...
r;-~~
.t .t 1\ 8 . \" q
Review Date
Comments
property
5. Indicate adjoining streets including curbs,
sidewalks, existing and proposed median
openings, and all street intersections, driveways, within
200 feet of the property.
6. Indicate spacing between driveways within
the subject property and adjacent properties as
required on Page 72 of the Subdivision Ordinance
Sheet C101- Paving Plan
1. Re-Iabel as "Phase 1- Detail Site Plan".
2. Delete General and Keyed Drawing Notes
3. Include Site Date Table with Phase 1 Data -
similar to the Data Table on the Concept Plan
Sheet (including correcting "future phases 46 acres")
4. Add Zoning districts adjacent to the property
5. Include dimensions of the boundaries of the
property
6. Indicate adjoining streets including curbs,
sidewalks, existing and proposed median
openings, and all street intersections, driveways, within
200 feet of the property
7. Indicate spacing between driveways within
the subject property and adjacent properties as
required on Page 72 of the Subdivision Ordinance
8. Include elevations of proposed monument
signs, including elevations showing dimensions,
total square footage, materials, colors, font, and light
source, if any.
9. Show existing and proposed sidewalks
10. Fire Hydrant Layout and curve radii for fire
lanes
Sheet C102 - Utility Plan
If revisions are needed only re-submit two copies
-separate from Site Plan set - if revisions are not
needed - do not re-submit
Sheet C103 - Parking and Traffic
Do not resubmit this sheet - add summary of pertinent
data on rational for parking (i.e. - NLC parking
demand/lTE data, etc.) onto Concept Plan Sheet.
Sheet L201 - Preliminary Landscape Plan
1. There are discrepancies in the size of the
building foot print and the lot area for Phase 1 on
this and the Site Plan sheets..please rectify.
2. Perimeter Landscape - per the Streetscape
Plan, Cedar Elm Trees are recommended
along Sandy Lake Road
3. The Plat Schedule indicates 91 trees are
being proposed, the Data Table indicates 67
trees, the plan indicates 81 trees please rectify the
discrepancies.
4. Dimension the boundaries of the property.
5. Existing and proposed utilities easements
need to be indicated to determine if there are
conflicts with proposed plantings.
THE.CiTY.OF
COPPELL
~~r'c~'*,r.. '.
f . _ 0
e q
x .-\ 5 . \ e"
Agency
Reviewed By
CITY OF COPPELL
ORC REPORT
THE.CITY.OII'
COPPELL
.~.
r ~
e .\' ~ I & q
5 '
Review Date Comments
6. Show proposed and existing sidewalks
7. Dimension perimeter landscape buffer
widths
8. Show location of monument sign, if any.
9. FYI - minimum caliper permitted is 3".
10. General Drawing Notes: delete N. and P.
Sheet L301 - Irrigation Plan
If revisions are needed only re-submit two copies
-separate from Site Plan set - if revisions are not
needed - do not re-submit
Sheets C 105 and C 106
1. Include the proposed building colors and
materials, including manufacturer's
specifications on the elevations.
2. Indicate percentage of masonry materials
3. Submit a color board at the DRC Meeting
· The color board shall indicate the name
of the proposed project and show a sampling of all
proposed materials in the appropriate color and
labeled accordingly
· Color renderings would be helpful.