Loading...
DRC Comments THE-CITY_OF COPPELL ..~' . *... r ~ e q .t 1\ 6 . \ e. THE-CITY.OF CITY OF COPPELL ORe REPORT COPPELL .~* r. ...... r ~ e q ..t 1\ 5 . \ fl Proiect ID PD-07-0054 Address 777 Freeport Pkwy Proiect Name PD-229-li, Minyard Addition (ktr Capital) Proiect Tvpe Re-Zoning PD Application Date 6/22/2007 Case Manaaer Marcie Diamond Proiect Description zoning change request from LI (Light Industrial) to PD-229-L1 (Planned Development-229-Light Industrial) to allow the retention of the existing office/warehouse and office buildings and to allow the construction of four office/warehouse buildings, totaling approximately 503,250-square-feet on 79.53 acres of property Agency Building Inspection 1 of 3 Review Date 6/28/2007 Reviewed By Greg Jones Electric Jeff Curry 6/28/2007 Engineering Michael Garza 6/28/2007 Fire Administration Tim Oates 6/27/2007 Parks and Recreation Planning Department John Elias Marcie Diamond 6/26/2007 6/28/2007 Comments 1. Type II-B construction housing a S-1 occupancy has a base area of 17 ,500 s.f. By not maintaining 60 foot yards, building areas will NOT be unlimited. 2. Development on Lot 2 does not appear to be able to be built as drawn unless buildings built with a higher level of fire resistiveness than II-B type of construction .. Contact Jeff Curry at 972-888-1330 to discuss electric service requirements. 1. Show fire hydrants, FDC, and valve locations. 2. Loop the water line. 3. Extend sanitary sewer service to Building "0". 4. Use stamped concrete at entrances. 5. The drainage will be evaluated further during Plan Review. 6. The 6" domestic water meter should be in a vault and 20' x 20' utility easement 7. The detention pond calculations need to be provided. 1. Fire hydrants required at 300' intervals along fire lanes. 2. Show FOC (fire department connection) locations. FDC's must be within 50' of a fire hydrant and on the same side of the fire lane. 3. Provide water as-builts for existing property for reference. Proposed buildings should not use the existing fire pumps. No comments. A. Rectify ALL the discrepancies between the Site Plan, Landscape Plan and Plat, including, but not limited to location of lot lines, driveways, existing and proposed improvements, parking areas, lot numbers, etc. B. Are any monument signs proposed for any of the lots? If so, provide location, design, etc. Site Plan: 1. Rectify the discrepancies within this sheet including lot numbers, etc. 2. Lot 1R: a. Add individual square footages of buildings THE.CITY.OF COPPELL .~...*J. .. f . ~ " q .t I!. 6 \ I; Agency Reviewed By THI!:-CITY.OF CITY OF COPPELL ORe REPORT COPPELL .~*f.' .. f ~ " q ..t <"\ 05 . \ I; Review Date Comments to be retained within this lot, designating office vs. warehouse uses and required parking, and clearly note building(s) to be removed. b. Dimension existing/proposed building setback from Bethel Road R.OW. c. Is a new driveway intended to intersect with Bethel Road? Does not show on Landscape Plan. d. Southeast corner of tract -rectify the discrepancies in location and configuration of parking. e. All new parking must comply with the landscape ordinance, including parking lot islands being provided every 15 spaces, etc. f. Include parking counts on the site plan. g. Is the future expansion to be included on this plan? Is there sufficient parking and landscaping to accommodate it? 3. Lot 2R: a. Add square footage of Buildings A, Band C, on the site plan and in the Tabulations with % of office vs. warehouse. b. Need to screen Building A's loading area from Bethel Road. c. Is the parking to the south of Building B a single or double row? Is there is both landscaping and parking shown. d. Is Building C intended to be rail served? Elevations do not indicate that.. if not, does this rail line need to be abandoned? e. Where is the Lot Line to the east and north of Building C? f. A parking lot island is required every 15 (not 16 ) spaces g. Driveway into Bethel Road - located as shown on the plat or the site plan? h. Verify parking count. 4. Lot 3R a. Is "in-fill"parking proposed north of the building? Access ways must be provided from the existing to the proposed parking areas. b. Firelane must be provided to serve this building. 5. Lot 4R a. Indicate the buildings/improvements to be retained different from those to be removed. b. Clearly indicate the Fire Lanes. Landscape Plans 1. Are any existing trees being retained and/or removed? Provide a Tree Survey. 2. Add dimensions on the lot lines. 3. Until all the discrepancies are addressed, including location of lot lines, existing and proposed improvements, etc. its difficult to review the adequacy of the landscape plan... 4. Do not need to re-submit the 1" = 60" plans THE,CITY OF COPPELL ~"."'_. ~ '* . ? ~ e q .x "'.5 . \ t!> Agency Reviewed By THE.CITY,OF CITY OF COPPELL ORe REPORT COPPELL .~'" . ? ~ e q ..t .." S . \ e. Review Date Comments Elevations: 1. Building A - indicates parking along west property line, but no access to the building. Consider adding entry features/ articulation to this fayade given the visibility from Bethel Road and to provide functionality to this parking area. 2. Building B- a. consider adding architectural feature/entry at the northwest corner of the building. b. Re-Iabel rear elevation to (west) elevation. 3. Building C - if railroad spur is to be used then would access to the building from this fayade be necessary? 4. Indicate proposed sign areas. 5. Provide a Color Board at the ORC Meeting. JC JON E S & CAR T E R INC. ENGINEERS.PLANNERS.SURVEYORS 3030 LBJ Freeway, Suite 910 Dallas, Texas 75234-7747 TEL 972 488 3880 FAX 972 488 3882 July 10, 2007 AUSTIN DALLAS HOUSTON TH E WOODLAN DS Ms. Marcie Diamond City of Coppell 255 Parkway Boulevard Coppel, TX 75019 -----------. '~1 '39 HU, >..... <00 7.;;.')?~ ":J~ .&. '!l C"y' -,: i, I ;,a 111 ~ -...! 'M .... ':) Revised ~ \ P&Z <0 A) ,- . Re: Minyard Addition Replat and Rezoning Dear Ms. Diamond: We received the City of Coppell DRC comments regarding the referenced project and have made the appropriate revisions and corrections. The following are our responses to the comments made on the replat, site plan, landscape plan and preliminary engineering exhibits: Re-Zoning PD Building Inspection 1. Type II-B construction housing a S-l occupancy has a base area of 17,500 s.f. By not maintaining 60 foot yards, buildings areas will NOT be unlimited. - We revised the layout to provide 60 foot yards everywhere. 2. Development on Lot 2 does not appear to be able to be built as drawn unless buildings built with a higher level of fire resistiveness than II-B type of construction. - We revised the layout to provide 60 foot yards everywhere. Electric 1. Contact Jeff Curry at 972-888-1330 to discus electric service requirements. - We have contacted Jeff Curry and will work with his department to determine the scope of the electrical system. Engineering 1. Show fire hydrants, FDC, and valve locations. - We now indicate locations for valves, FH's and fire department connections. 2. Loop the water line. - We have looped the waterline back to the existing onsite system near the south end of the development. We understand that the system may have to change in the final design to meet the City's requirements. 3. Extend sanitary sewer service to Building "D". - We now show a sere service connecting to Building "D". 4. Use stamped concrete at entrances. - We now show to use stamped concrete at all entrances to be constructed or reconstructed. 5. 5. The drainage will be evaluated further during Plan Review. - We understand that all utilities and drainage will need to be approved in the final Plan Review process. 6. The 6" domestic water meter should be in a vault and 20' x 20' utility easement. - We added an easement to be around the requested vault. 7. The detention pond calculations need to be provided. - The detention pond calculations are now provided on the Preliminary Drainage Plan. Smart Engineering. Smart Solutions.™ www.jonescarter.com J ~ JON E S & CAR T E R INC. . ~ ENGINEERS. PLANNERS. SURVEYORS Fire Administration 1. Fire hydrants required at 300' intervals along fire lanes. - Fire hydrants were added along fire lanes to have 300 foot maximum spacing. 2. Show FDC (fire department connection) locations. FDC's must be within 50' of a fire hydrant and on the same side of the fire lane. - FDC 's were added to each new building and fire hydrants moved or added to be within 50 feet of the FDC. 3. Provide water as-builts for existing property for reference. Proposed buildings should not use the existing fire pumps. - We are providing the water as-builts under a separate cover to Tim Oates. We will work with his department and the engineering staff to provide a design to meet their requests. Planning Department A.Rectify ALL the discrepancies between the Site Plan, Landscape Plan and Plat, including, but not limited to location of lot lines, driveways, existing and proposed improvements, parking areas, lot numbers, etc. - We have coordinated the plans of each of the design team and now all show common layouts, lot lines, etc. B.Are any monument signs proposed for any of the lots? If so, provide location, design, etc. - We now show monument signs at three locations on the Site Plan. Site Plan 1. Rectify the discrepancies within this sheet including lot numbers, etc. - This was done. 2. Lot lR: a. Add individual square footages of buildings 0 be retained within this lot, designating office vs. warehouse uses and required parking, and clearly note building(s) to be removed. - We added the individual square footages and indicate the building to be removed with a cross hatch pattern. Dimension existing/proposed building setback from Bethel Road. - This was done. Is a new driveway intended to intersect with Bethel Road? Does not show on Landscape Plan. - There are to be 2 new driveways onto Bethel Road. All exhibits reflect this now. Southeast comer of tract - rectify the discrepancies in location and configuration of parking. - This was done. All new parking must comply with the landscape ordinance, including parking lot islands. - This was done. Parking islands were added to have no more than 15 consecutive parking spaces in new parking areas. Include parking counts on the site plan. - Parking counts now are displayed on the plan and in the summary text. Is the future expansion to be included on this plan? Is there sufficient parking and landscaping to accommodate it? - The expansion is now indicated. There is enough parking provided to accommodate it. b. c. d. e. f. g. 3. Lot 2R: a. b. c. Add square footage of Buildings A, B, and C on the site plan and in the tabulations with % of office vs. warehouse. - The individual square footages of each building was added including the breakdown of the type of use. Need to screen Building A's loading area from Bethel Road. - A screening wall was added to screen Building A 's loading area as requested. Is the parking to the south of Building B a single or double row? There is both landscaping parking shown. It is a double row of parking- the landscaping patterning was removed from the Landscape Plan. JC JONES&CARTER,'NC ENGINEERS. PLANNERS. SURVEYORS e. f g. h. 4. Lot 3R: a. b. 5. Lot 4R: a. b. Replat Electric d. Is Building C intended to be rail served. Elevations do not indicate that. If not, does this rail line need to be abandoned? - We intend to make rail service available for Building C for now. The rails are to remain. Where is the lot line to the east and north of Building C. - This discrepancy was rectified. A parking island is required every 15 (not 16) spaces. The maximum spacing is now 15 spaces. Driveway to Bethel Road - located as shown on the plat or the site plan? To be as shown on the plat. This has been rectified on all exhibits. VerifY parking count. - The parking count was verified and updated Is "in-fill" parking proposed north of the building? Access must be provided from the existing to the proposed parking areas. - There is to be NO "in-jill" parking north of the building. Firelane must be provided to serve this building. - A firelane now serves this building. Indicate the buildingslimprovements to be retained different from those to be removed. - Cross hatching has been added to delineate between improvements being removed and those that are staying. Clearly indicate the Fire Lanes. - The fire lanes are now shaded for clarification. 1. Contact Jeff Curry at 972-888-1330 to discus electric service requirements. - We have contacted Jeff Curry and will work with his department to determine the scope of the electrical system Engineering 2. If storm drain system is private, no drainage easement is required. - Storm sewers are to be private-therefore easements were removed. 3. Provide 20' x 20' utility easement for 6" domestic water on the north side. - This was added. 4. A property owner's association document is needed for maintenance of water, sanitary sewer and drainage. This document will be provided in the near future. Fire Administration 1. First driveway of Bethel, west of Freeport needs to be reconfigured. The "8" is too tight for fire apparatus and vehicles that will service the property. - We have designed that driveway for WB-50 access. We will provide exhibits with turning templates to Tim Oates under separate cover. Planning 2. Remove existing improvements from replat. - Existing improvements were removed from the replat. 3. Correct the numbering ofthe lots. All lot numbering is now consistent. 4. Indicate all required fire lanes (and spell fire lane correctly) - All required fire lanes are now shown with the correct spelling. 5. Do the existing railway easements need to be abandoned? - No, they have been abandoned already. The rails on the site are private. JC JONES&CARTERINC ENGINEERS. PLANNERS. SURVEYORS 6. In the title block, include "Being a Replat of Lots 1 and 2 of the Minyard Addition" - This was added to the title block of the replat. 7. Correct the name of the property owner in the Owner's Certificate. - The owners name was corrected and is consistent throughout. 8. Correct the name of the plat in the City Secretary signature plat. - This was done. 9. Need to add franchise utility signature blocks as follows: .... - This franchise utility signature block was added. 10. Add the Flood Plain Administrator's signature block as follows: .... - The Flood Plain Administrator's signature block was added. We've included twelve (12) full size sets ofreplats, site plans and landscape plans as well as two sets of the preliminary engineering exhibits, a CD ofPDF files Please call or email me if you have any questions or additional comments. Sincerely, ~~ <<d~~JJ Steve B. Heniford, P.E. - U- Proj ect Manager SBHldsa P:\PROJECTS\D224 KTR Capital\002 \General\Letters\plan response 07.10.07.doc Enclosures