Loading...
DRC Comments THE.CITY.OF THE.CITy.orr COPPELL CITY OF COPPELL ORC REPORT COPPELL '" .. s Proiect 10 Address PD-07-0082 Proiect Name PD-228R-HC, Vista Ridge Retail, Lot 1, Blk A (Bo, Proiect Type Re-Zoning PO Application Date 10/15/2007 Case Manaaer Gary Sleb Proiect Description zoning change request from PD-228-HC (Planned Development-228-Highway Commercial) to PD-228R-HC (Planned Development-228 Revised-Highway Commercial) to attach a Detail Sit~ Plan to allow the development of a 4,400 square foot bank with five drive-thru lanes 1 of 2 Agency Reviewed By Review Date Comments Building Inspection Greg Jones 11/28/2007 1. No Building Inspection comments made since no floor plans or info furnished. Plans will need to comply will all life-safety provisions prior to Building Permit approval. Electric Jeff Curry 11/29/2007 No Comments Received Engineering Michael Garza 11/29/2007 1. Double check detectors should be in the vault not in the buildings. 2. Reconfigure domestic water so that it is not connected to the fire line. Fire Administration Tim Oates 11/29/2007 1. Fire hydrant system shall be installed prior to building construction. 2. Show FDC on Site Plan. 3. Sprinkler riser room is required to have direct exterior access. Door is not shown on the Elevations or Site Plan. Room shall be min. 56 sq. ft. to accommodate all required fire/life safety equipment. 4. Fire lanes shall be installed prior to building construction. Comment on Site Plan states paving as part of overall development by others? At least the fire lane from the Service Road, through this lot, back to Denton Tap must be completed. Parks and Recreation John Elias 11/29/2007 No comments. - T THE.CITY.OF COPPELL 1f~... *: ~r... ... ~ ~ I: q X J'\ 6 . \ & Agency Planning Department Reviewed By Gary Sieb - T THE.CITY.OF CITY OF COPPELL ORC REPORT COPPELL ..~. *: '" ... ~ ~ eXJ'\6 . \&q Review Date Comments 11/29/2007 SITE PLAN 1. Dimension widths of each drive-thru lane. 2. Explain how double stacking drive thru machines on west end function with cars behind.. 3 Look at View Point Bank site (at sw corner of Denton Tap and 121) for example of site planning which meets our development code requirements. 4. Indicate in title block of all exhibits that zoning is PD-228R-HC. 5. Indicate type of "enhanced" pedestrian surfacing that goes around building. 6. Explain how perimeter circulation will be provided.outside lot lines. LANDSCAPE PLAN 1. L. S. plan needs to "pop out" landscape materials- on plan--still difficult to read. 2. Extend Dwarf Wax Myrtle on top of proposed berm in front of drive-thru area. 3. Add at least three overstory trees to L.S. strip north of drive-thru lanes. ELEVATIONS 1. Color board needs to be provided at Dec. 6 meeting if possible. 2. Indicate dimensions of all proposed signage and colors. 3. Re-Iabel all elevation exhibits to be "North", "South", "East", or "West". SIGNAGE 1. Monument sign must be externally lit. 2. Indicate monument sign construction material upon which bank letters are mounted. 3. Total monument sign (including base) can not exceed 40 square feet. 4. Signage on all four sides of building can not exceed 142 total square feet. You have over 155 feet of signage; also the logo on south building elevation is over twice the size allowed. THE.CITY.OF COPPELL 8 Planning Department 255 Parkway Blvd Coppell, Texas 75019 Phone: 972-304-3678 Fax: 972-304-7092 PROJECT: PD-228R-HC, Vista Ridae Retail, Lot 1, Block A (Bank of America) PLANNING DEPARTMENT CONTACT: Gary Sieb DIRECT DIAL: 972-304-3678 FAX COVER SHEET DATE: November 30, 2007 PAGES: (including cover) TO: Josh Griffith/Mike Clark Tom Chapman FAX: 972.490.7099 214.742.6041 Items Transmitted: 1. Agenda for the December 6, 2007 DRC Meeting 2. DRC Comments Remarks: A. Please revise all plans and plat(s) based on staff recommendations. Should the applicant disagree with staff comments, please provide reasons why staff recommendations should not be followed when you attend the December 6, 2007 Development Review Committee (ORe) meeting. B. Each applicant will bring two new sets of revised plans and plat(s) to the December 6, 2007 DRC meeting. Applicants will be asked to show, explain and defend any revision. A representative of the project is required to attend this meeting. C. The applicant will have until noon, December 11, 2007 to submit 12-24' x 36' sets, FOLDED, and three (3) reduced paper copies (8 1/2 X 11) and JPEG, TIF, PDF OR SIMILAR ELECTRONIC FORMA T of each exhibit. Only two sets of revised preliminary engineering and irrigation plans are required. Reductions and electronic copies are not required of the engineering and irrigation plans. If you have any questions or would like additional information, please contact me at 972-304-3678 or e-mail atQsieb@ci.coppell.tx.us T-HE:-CITY.OP' COPPELL ~'" :If *: ... ~ ~ I: x 6 q J'\ 8 . \ Proiect 10 Address Proiect Tvpe Application Date Case Manaaer Proiect Description Agency Building Inspection Electric Engineering Fire Administration PD-07 -0082 THIE.CITY.OP' CITY OF COPPELL ORe REPORT COPPELL ..~* '" ... ~ ~ ~ ..t 1\- oS . \ & q Project Name PD-228R-HC, Vista Ridge Retail, Lot 1, Blk A (Bo, Re-Zoning PO 10/15/2007 Gary Sieb zoning change request from PD-228-HC (Planned Development-228-Highway Commercial) to PD-228R-HC (Planned Development-228 Revised-Highway Commercial) to attach a Detail Site Plan to allow the development of a 4,400 square foot bank with five drive-thru lanes Reviewed By Greg Jones Jeff Curry Michael Garza Tim Oates - T 1 of 2 Review Date 10/24/2007 10/24/2007 10/22/2007 10/25/2007 Comments 1. No Building Inspection comments made since no floor plans or info furnished. No Comments Received 1. The 8" water crossing Denton Tap Rd. is shown in the wrong place. 2. The 12" water on the east side of Denton Tap Rd. has been abandoned. 3. Label the 27" sanitary sewer as Lewisville and show it to tie into the man hole on the North bound lane of Denton Tap Rd. 4. Show the lot lines clearly. 5. Tie the sanitary sewer service to the 12" Coppell Sewer not Lewisville's 27". 6. Double check detectors should be in the vault not in the buildings, unless specifically approved by the Fire Marshal. 7. Approval of the driveway and decellane will be required from TxDOT. Decellane should be constructed with this development. 8. When will the water lines for the future development be constructed? 9. Pro Rata for the 8" water line will be required. Council approved the Pro Rata Agreement on September 11, 2007 which requires a payment of $6298.03 per acre for this site to reimburse the developer who constructed the 8" water line that was offsite to their development. 10. A Property owner's association agreement is required for maintenance of private utilities. 11. No drainage plans have been provided; drainage will be evaluated further during engineering plan review process. 12. Reconfigure domestic water so that it is not connected to the fire line. 13. Sidewalks along Denton Tap should be off of the back of curb. Include the construction of sidewalks along SH 121 service road. 1. Fire hydrant system shall be looped. 2. FDC and fire hydrant shall be on the same side of fire lane, and within 50 feet of each other. 3. Make sure the location of the fire lane on the site plan matches what was platted. THE -;-- C I T Y . 0 F COPPELL .. s Agency Parks and Recreation Planning Department Reviewed By John Elias Gary Sieb - T THE.CITY.OPO CITY OF COPPELL ORC REPORT Review Date 10/22/2007 10/19/2007 COPPELL .~- * ~~... ~ ;-~~ ~ .t J'\ oS . \ & q Comments No comments. NOTE: THIS CASE HAS BEEN WITHDRAWN FROM THE NOVEMBER 15 HEARING SO APPLICANT CAN ADDRESS SEVERAL DEVELOPMENT ISSUES SITE PLAN 1. Are vehicles are going against the flow of traffic when stacked at windows? 2. Dimension widths of all internal circulation lanes. 3. Drive-thru should be screened from street view.--add berms to I.s.area. 4. Consider re-orienting bank and drive-thru windows. 5. Dimension parking spaces and indicate number of spaces. 6. Need dimensions, materials, colors and message proposed for monument sign. 7. What are 4 small structures at west end of drive-thru area? 8. Site Plan shows 5 drive-thru lanes, Elevations show 4. 8. Site Plan ONE preferred to Site Plan TWO. 9 Look at View Point Bank site (at sw corner of Denton Tap and 121) for example of site planning which meets our development code requirements. LANDSCAPE PLAN 1. Minimum ten foot I.s. area with plantings required on east property lines. 2. More clearly define Plant List plant symbols on plan--difficult to read. 3. Label fire lane as 24 feet wide. 4. Correct spelling of "soild" to "solid". 5. Landscape Plan and REVISED Site Plan Two do not match. ELEVATIONS 1. Dimension width, height, and length of building. 2. Reconsider red color of overhang. 3. Color board will be required prior to hearing. 4. Design needs to complement already approved grocery and retail buildings. 5. Indicate dimensions of all proposed signage and colors. THE.CITY.OF COPPELL Planning Department 255 Parkway Blvd Coppell, Texas 75019 Phone: 972-304-3678 Fax: 972-304-7092 PROJECT: PD-228R-HC, Vista Ridae Retail, Lot 1, Block A (Bank of America) PLANNING DEPARTMENT CONTACT: Gary Sieb DIRECT DIAL: 972-304-3678 FAX COVER SHEET DATE: October 26, 2007 PAGES: (including cover) TO: Josh Griffith/Mike Clark Tom Chapman Mick Granlund FAX: 972.490.7099 214.742.6041 972.788.4828 Items Transmitted: 1 . ORC Comments Remarks: Due to the number of inconstancies in the various versions of the site plan and elevations submitted since the required submittal date of October 17th, as well as the technical deficiencies from the development review departments as detailed in the attached DRC Comments, this case will not be scheduled for a P&Z Hearing on November 15th. Please resolve all issues as outlined in the attached and re-submit one set of the site plan, landscape plan and elevations to staff no later than November 19th, the mandatory pre-submission date to be eligible to be placed on the P&Z Agenda for December 20th. If you have any questions or would like additional information, please contact me at 972-304-3678 or e-mail atasieb@cLcoooell.tx.us - .r