Loading...
DRC Comments THE.CiTY.OP' THE.CiTy.orr COPPELL lIf~* ... ~ ~ e.tJ'\s . \&q CITY OF COPPELL ORC REPORT COPPELL ..~*... ~ ~ ~ .t J'\ 05 . \ & q Proiect 10 Address PD-07 -0090 134 N Macarthur Blvd Proiect Name PD-223R-C, Chase Bank (Kimbel Addition) Proiect Tvpe Application Date Case Manaaer Project Description Re-Zoning PD 12/18/2007 Marcie Diamond zoning change request from PD-223-C (Planned Development-223-Commercial) to PD-223R-C (Planned Development-223 Revised-Commercial) to attach a Detail Site Plan to allow the development of a 3,848-square-foot bank with four drive-thru lanes Agency Building Inspection Electric Engineering Reviewed By Greg Jones Jeff Curry Mike Garza 1 of 2 Review Date 1/31/2008 12/26/2007 1/30/2008 Fire Administration Tim Oates 1/30/2008 Parks and Recreation Planning Department John Elias Marcie Diamond 12/26/2007 1/28/2008 Comments No Comments. No Comments Received 1. Install stamped concrete in drive approach off of Village Parkway. 2. If lime stabilization is not going to be used for the paving, a waiver request must be submitted by the engineer along with the geotechnical report. 3. The retaining wall is in conflict with the sanitary sewer on the east side of the project. The engineered retaining wall design will need to be submitted to Engineering Department during the plan review process. 4. It appears that a full set of construction plans was submitted with the DRC information. These plans should not be considered submission for engineering approval. Plans for review should not be submitted until approval from Planning and/or City Council is granted. 1. Fire Department Connection (FOC) is shown on Site Plan and Water Plan in the wrong location. FDC is required to be detached from building, within 50' of a fire hydrant and on the same side of the fire lane (in the landscape island next to the fire hydrant). No comments. Site Plan: 1. General Notes: Delete #1 and #2 Revise note #4 to delete dumpster and trash compactors as they are not included in this site plan. Revise note #5 to read: All building and monument signage shall be approved with THIS site plan approval. 2. Add a note to the multi-tenant sign at the southern driveway - not part of this request. 3. The number of parking spaces has been increased from 25 in the PD to 29. 4. QUESTION FOR ENGINEERING: - will the 18' driveway work south of the building? Will it need to be designated by signage and striping as a one-way operation? 5. Include elevations of the proposed retaining wall, including materials, colors, hieght, etc. THE.CITY.OF COPPELL ..~*". .. ~ ~ e .t "5 . I & q Agency THE-CITY.Of/' CITY OF COPPELL ORe REPORT COPPELL ..~'" ... ~ ~ e .t . I & q ~ 8 . Reviewed By Review Date Comments 6. Explain the "LBJ" at northern driveway Landscape Plan: 1. Include scale, north arrow and dimensions of the property on the Landscape Plan. 2. Resolve the discrepancies between the symbol used for the 3-Gal Dwarf Burford Holly on the Plant Table and the Plan. 3. Need a property owners agreement for the maintenance of off-site landscaping - Along the southern property line it appears that the landscaped area is not included in the calculations for this tract, but the proposed three trees are. It is reasonable to assume that these trees will not be accommodated within the 3' wide buffer area provided for landscaping along this property line. 4. Resolve the discrepancies number and size of trees provided as indicated in the Plant Material List and Requirement Table: Landscape Requirement Table indicates 9 - 4" caliper trees and 12 - 3" caliper trees = 21 trees (72 total caliper inches) Plant Table indicates 10-3" caliper trees and 12 - 4" caliper trees = 22 trees (78 total caliper inches) Landscape Calculation Exhibit: 1. Add dimensions and square footages of the various areas to verify that these areas comply or exceed the requirements of PD-223-C. Elevations: 1. The aluminum storefront windows on the previously submitted elevations were separated by brick columns, and softened by awnings. Both these architectural elements have been eliminated with this submission. It is recommended that these features be re-instated. 2. Monument sign - need to specify color and materials of the face of the sign. THE.CiTY.OF COPPELL .~*~..,. ex ~ ~q ^ Ii . \ Planning Department 255 Parkway Blvd Coppell, Texas 75019 Phone: 972-304-3678 Fax: 972-304-7092 DRe Agenda and Staff Comments PROJECT: PD-223R-C Chase Bank PLANNING DEPARTMENT CONTACT: Marcie Diamond DIRECT DIAL: 972-304-3676 FAX COVER SHEET DATE: February 1, 2008 PAGES: cj (including cover) TO: Mathew Cragun, O'Donald Engineering Alen Hinkley FAX: 817-548-8 972-991-75 Items Transmitted: 1 . Agenda for the February 7, 2008 DRC Meeting 2. DRC Comments Remarks: A. Please revise all plans and plat(s) based on staff recommendations. Should the applicant disagree with staff comments, please provide reasons why staff recommendations should not be followed when you attend the February 7, 2008 Development Review Committee (DRC) meeting. B. Each applicant will bring two new sets of revised plans and plat(s) to the February 7, 2008 DRC meeting. Applicants will be asked to show, explain and defend any revision. A representative of the project is required to attend this meeting. C. The applicant will have until noon, February 12, 2008 to submit 12-24' x 36' sets, FOLDED, and three (3) reduced paper copies (8% X 11) and JPEG. TIF. PDF OR SIMILAR ELECTRONIC FORMA T of each exhibit. Only two sets of revised preliminary engineering and irrigation plans are required. Reductions and electronic copies are not required of the engineering and irrigation plans. If you have any questions or would like additional information, please contact me at 972-304-3676 or e-mail atmdiamondra>.cLcoooell.tx.us