Loading...
Letter to Marcie, Plan Revisions, 012308 . O{f.lllI)v, .O!!. 'h. I'lllt, II' n leN' r'I!'h.IE!Orn4ISh.I'r rI ~}!to;;" 1[:oll~~LJtll t;. $ 'o~<J; hr'!;'Nt;lNh~';~I, I: Iii I?'" ~,~~" January 23, 2008 Ms. Marcie Diamond Assistant Director of Planning City of Coppel! RE: PD-223R-C, Chase Bank (Kimbel Addition) Dear Ms. Diamond: This letter is to inform you of the changes that have been made to our site. The building area is now 3,889 S.F., with three drive-thru lanes. We have also added an additional parking space. The building also shifted to the north to provide the additional spaces made on the south end of the property, rather than where the dumpster was originally located. The island landscaped area was reduced for the new parking at the south end. The ADA ramp was shifted north with the building. We have included in our submittal 12 copies of the site plan and elevations. Thank you. Sincerely, Matt Cragun 1601 E. Lamar Blvd, #210 . Arlington, TX 76011 . 817-794-0202 . fax 817-548-8430 . www.odengineering.com FROM POSSIBILITY TO ACTUALITY