Loading...
Memo - Alexander Flood Study Page 1 of 1 Marcie Diamond - Alexander Flood Study From: To: Ken Griffin Clay Phillips; David Dodd; David Ritter; Gary Sieb; Jim Witt; Marcie Diamond 3/27/2008 3: 18 PM Alexander Flood Study Michael Garza; Rhonda Adloo Date: Subject: CC: I received the official revision to the floodplain map today from FEMA. It is dated 3/24/2008 and becomes effective 4/24/2008. It generally conforms to what was submitted by Nathan Maier - the consultant for Mr. Hawkins. I reviewed the information received against the plat that was submitted and the only change to the plat caused by the FEMA revision is that the minimum finish floor elevation for Lot 11 needs to be changed from 493.7 to 495. At this time, Mr. Hawkins should be able to submit the final plat with the revised floodplain for P&Z approval on April 17, 2008. This is being conveyed to Mr. Hawkins with the DRC comments that will be sent out tomorrow. Ken Griffin file://C:\Documents and Settings\mdiamond\Local Settings\Temp\XPgrpwise\47EBBADF... 3/28/2008