Memo - Alexander Flood Study
Page 1 of 1
Marcie Diamond - Alexander Flood Study
From:
To:
Ken Griffin
Clay Phillips; David Dodd; David Ritter; Gary Sieb; Jim Witt; Marcie
Diamond
3/27/2008 3: 18 PM
Alexander Flood Study
Michael Garza; Rhonda Adloo
Date:
Subject:
CC:
I received the official revision to the floodplain map today from FEMA. It is dated 3/24/2008 and
becomes effective 4/24/2008. It generally conforms to what was submitted by Nathan Maier - the
consultant for Mr. Hawkins. I reviewed the information received against the plat that was submitted
and the only change to the plat caused by the FEMA revision is that the minimum finish floor elevation
for Lot 11 needs to be changed from 493.7 to 495.
At this time, Mr. Hawkins should be able to submit the final plat with the revised floodplain for P&Z
approval on April 17, 2008. This is being conveyed to Mr. Hawkins with the DRC comments that will
be sent out tomorrow.
Ken Griffin
file://C:\Documents and Settings\mdiamond\Local Settings\Temp\XPgrpwise\47EBBADF... 3/28/2008