Staff Comments 053008
THE.CITY.OF
~~qy~~ oJ'"
COPPELL
Planning Department
255 Parkway Blvd
Coppell, Texas 75019
Phone: 972-304-3678
Fax: 972-304-7092
DRe Agenda and
Staff Comments
PROJECT: Fire Station No.1, Lot 1 Block 1,
Site Plan Amendment
PLANNING DEPARTMENT CONTACT: Matt Steer
DIRECT DIAL: 972-304-3559
DATE: May 30, 2008
FAX COVER SHEET
PAGES: If
(including cover)
i~"'S-
FAX: 972-304-4422 35"1L(
TO: Tim Oates, Deputy Chief/Prevention
Items Transmitted:
1. Agenda for the June 5, 2008 ORC Meeting
2. ORC Comments
Remarks:
A. Please revise all plans and plat(s) based on staff recommendations. Should
the applicant disagree with staff comments, please provide reasons why staff
recommendations should not be followed when you attend the June 5, 2008
Development Review Committee (ORC) meeting.
B. Each applicant will bring two new sets of revised plans and plat(s) to the
June 5, 2008 DRC meeting. Applicants will be asked to show, explain and
defend any revision. A representative of the project is required to attend this
meeting.
C. The applicant will have until noon, June 10, 2008 to submit 12-24' x 36' sets,
FOLDED, and three (3) reduced paper copies (8 1/2 X 11) and JPEG, TIFf
PDF OR SIMILAR ELECTRONIC FORMA T of each exhibit. Only two sets of
revised preliminary engineering and irrigation plans are required. Reductions
and electronic copies are not required of the engineering and irrigation plans.
If you have any questions or would like additional information, please contact me at 972-304-3676 or
e-mail atmsteertCi>.cLcoppell.tx.us
THE'CITY.OF
THE.CITY.OF
COPPELL
~~* ~~1f-
? ;~~o
-t t'\ oS . \ &
CITY OF COPPELL
ORC REPORT
COPPELL
~,...,~.~
~ r *~-" 1f-
? l: ~ . .~ q 0
..t t'\ S . \ &
Proiect 10
SPR-08-0013
Proiect Name
Fire Station No.1, Lot 1 Block 1, Site Plan Amend
Address 520 Southwestern Blvd
Proiect Tvpe Site Plan Amendment (Revision)
Application Date 3/19/2008
Case Manaaer Malt Steer
Proiect Description to allow construction of a 4,900 square foot addition to the existing Fire Station
of 2
Agency Reviewed By Review Date Comments
Building Inspection Greg Jones 5/29/2008 No Comments Received
Electric Jeff curry 5/29/2008 No Comments Received
Engineering Michael Garza 5/29/2008 1. We will work with Fire Department regarding the
utilities.
Fire Administration Tim Oates 5/29/2008 No issues or concerns regarding this site plan
amendment.
Parks and Recreation John Elias 5/27/2008 No comments.
THE.CITY.OF
-- --
COPPELL
~'"""~' !ro..:.~.. (.~r '..-' .
~~ .~~* ~. , .' 1f-
? l:' '.. ~- q 0
.t 1'\ S . \ fl
Agency
Planning Department
Reviewed By
Matt Steer
THE.CiTY.OF
CITY OF COPPELL
ORe REPORT
COPPELL
~~~ * ~~1f-
r ;-~~o
..t 1'\ S . \ ~
Review Date Comments
5/29/2008 Site Plan:
1. Include title block in bottom right corner stating the
following:
a. Site Plan Amendment
b .Fire Station No.1, Lot 1, Block 1
2. Include Applicant contact information to the left of the
title block as follows:
a. Applicant:
b. City of Coppell
c. Chief Richardson, Fire Department
d. 520 Southwestern Blvd.
e. Coppell, Texas 75019
f. Phone: 972-304-3512
g. Fax: 972-304-3514
3. Include dimensions of building, drive width and paving
area.
4. Include legend.
5. Include a Landscape Plan/Tree Survey Sheet (Include
same area as site plan but only include details for the
area from Southwestern to the limits of construction lines).
6. Include evergreen landscaping (Eastern Red Cedars &
Austrian Pines) along Southwestern to screen the view of
the garage doors and include perimeter landscaping
adjacent to proposed building.
7. Show proposed location of existing and proposed fire
hydrants.
8. Include a Site Data Table as follows:
a. Existing Zoning: LI
b. Proposed Use: Vehicle and Miscellaneous Storage
Facility
c. Building Area: 4,900 square feet
d. Building Height: 28' 3 Y.."
e. Required/Provided Parking: N/A
10. Label adjacent properties' zoning information.
11. Refer to attached Site Plan Checklist.
Elevations/Floor Plan:
1. Include horizontal dimensions of garage door and
spacing.
2. Label all materials and colors.
3. Include proposed lighting.
4. Submit a color board at DRC with color elevation.
Memorandum
~R
Date: May 30, 200S
To: Matt Sk'eT
cc:
From: Jeff Curry
Subject: May DRe
PO-229R-Ll Minyard Addition (KTR Capital) - zoning change acceptable, please contact Randy
Bell at 940.497.7530 to confirm locations of signs will not interfere with Oncor Electric Delivery
facilities.
PO-209R2-C, TownOaks Centre - zoning change acceptable, please contact Larry Redick at
972.323.8917 to discuss electric service requirements.
PO-233-R, Coppell Vision Center - zoning change acc813table, please contact Larry Redick at
972.323.8917 to discuss electric service requirements.
CiCPs Addition No.1, Site Plan Amendment - site plan acceptable, please contact Larry Redick at
972.323.8917 to discuss electric service requirements.
GCi's Addition No.1, Lot 1 R, Block 1, Replst - plat acceptable.
Fire Station No.1, Lot Block 1, Site Plan Amendment -- site plan acceptable, please contact LaITY
Redick at 972.323.8917 to discuss electric service requirements.
Freeport Parkway R.O. W. Dedication, Preliminary Plat and Freeport .Park,,,'ay R.O. W.
Oedication, Final Plat - Oncor Electric Delivery will require a minimum 15' public utility easement
adjacent to the R.O.W on both sides of Freeport Parkway. Please contact Jeff Curry at 972.888.1330
to disClL'>S.
CONFIDENTIAL