Loading...
DRC Comments THE.CITY.OF COPPELL .,~~. "}( ~ ~q .1 Ii . \ Planning Department 255 Parkway Blvd Coppell, Texas 75019 Phone: 972-304-3678 Fax: 972-304-7092 PROJECT: First Assembly of God Church (L1vina Hope), Site Plan Amendment, & S-1247-SF-12. T-Mobile (First Assemblv of God Church) PLANNING DEPARTMENT CONTACT: Gary Sieb DIRECT DIAL: 972-304-3678 FAX COVER SHEET DATE: August 1,2008 TO: v-5enise Cardinal PAGES: 4 (including cover) FAX: 918-516-0533 q~s~.k\^^ Items Transmitted: LSMIQ) ~r:!~ 1. Agenda for the August 7, 2008 DRC Meeting 2. DRC Comments Remarks: A. Please revise all plans and plat(s) based on staff recommendations. Should the applicant disagree with staff comments, please provide reasons why staff recommendations should not be followed when you attend the August 7, 2008 Development Review Committee (DRC) meeting. B. Each applicant will bring two new sets of revised plans and plat(s) to the August 7, 2008 DRe meeting. Applicants will be asked to show, explain and defend any revision. A representative of the project is required to attend this meeting. C. The applicant will have until noon, August 12, 2008 to submit 12-24' x 36' sets, FOLDED, and three (3) reduced paper copies (8 1/2 X 11) and JPEG. TIF. PDF OR SIMILAR ELECTRONIC FORMA T of each exhibit. Only two sets of revised preliminary engineering and irrigation plans are required. Reductions and electronic copies are not required of the engineering and irrigation plans. If you have any questions or would like additional information, please contact me at 972-304-3676 or e-mail atQsieb(a)cLcoooell.tx.us THE.CiTY.OF' THE.CITY.OF CITY OF COPPELL ORC REPORT COPPELL ..~~. -.. ~ ~ e,x/lj.8 . \~q COPPELL Proiect ID SPR-08-0026 Address 200 Heartz Rd Proiect Name First Assembly of God Church (Living Hope) Proiect Type Site Plan Amendment (Revision) Application Date 7/23/2008 Case Manaaer Gary Sieb Proiect Description to allow the construction of an approximate 70' high bell tower at the southwest corner of the existing 11,000 sq. ft. exposed aggregate till wall building, Agency Building Inspection Electric Reviewed By Greg Jones Jeff Curry 1 of 1 Review Date 7/29/2008 7/30/2008 Engineering Michael Garza 7/31/2008 Fire Administration Parks and Recreation Planning Department Tim Oates John Elias Gary Sieb 7/31/2008 7/29/2008 7/24/2008 Comments 1. No comment Please contact Larry Redick at 972-323-8917 to discuss electric service requirements. 1. New easements should be dedicated by separate instrument. No comments regarding this site plan amendment. No comments. 1. Moye wrought iron gate from south side to east side of proposed tower compound on Drawings C-2 and C-3. 2. Dimension distance from tower foundation center line to east property line on Drawing C-2. 3. Landscaping removed from compound construction needs to be replaced elswhere on site. Please show where and what plant materials are proposed. 4. Dimension distance from west wall of compound to Heartz Road on Drawing C-2. 5. Explain operation of bell tower, I.e., how often bells ring, decibel level, any "tune", etc.