DRC Comments
THE.CITY.OF
COPPELL
.,~~.
"}( ~ ~q
.1 Ii . \
Planning Department
255 Parkway Blvd
Coppell, Texas 75019
Phone: 972-304-3678
Fax: 972-304-7092
PROJECT: First Assembly of God Church (L1vina Hope), Site Plan Amendment,
& S-1247-SF-12. T-Mobile (First Assemblv of God Church)
PLANNING DEPARTMENT CONTACT: Gary Sieb
DIRECT DIAL: 972-304-3678
FAX COVER SHEET
DATE: August 1,2008
TO: v-5enise Cardinal
PAGES: 4 (including cover)
FAX: 918-516-0533 q~s~.k\^^
Items Transmitted:
LSMIQ) ~r:!~
1. Agenda for the August 7, 2008 DRC Meeting
2. DRC Comments
Remarks:
A. Please revise all plans and plat(s) based on staff recommendations. Should
the applicant disagree with staff comments, please provide reasons why staff
recommendations should not be followed when you attend the August 7,
2008 Development Review Committee (DRC) meeting.
B. Each applicant will bring two new sets of revised plans and plat(s) to the
August 7, 2008 DRe meeting. Applicants will be asked to show, explain and
defend any revision. A representative of the project is required to attend this
meeting.
C. The applicant will have until noon, August 12, 2008 to submit 12-24' x 36'
sets, FOLDED, and three (3) reduced paper copies (8 1/2 X 11) and JPEG.
TIF. PDF OR SIMILAR ELECTRONIC FORMA T of each exhibit. Only two
sets of revised preliminary engineering and irrigation plans are required.
Reductions and electronic copies are not required of the engineering and
irrigation plans.
If you have any questions or would like additional information, please contact me at 972-304-3676 or
e-mail atQsieb(a)cLcoooell.tx.us
THE.CiTY.OF'
THE.CITY.OF
CITY OF COPPELL
ORC REPORT
COPPELL
..~~. -..
~ ~
e,x/lj.8 . \~q
COPPELL
Proiect ID
SPR-08-0026
Address 200 Heartz Rd
Proiect Name
First Assembly of God Church (Living Hope)
Proiect Type Site Plan Amendment (Revision)
Application Date 7/23/2008
Case Manaaer Gary Sieb
Proiect Description to allow the construction of an approximate 70' high bell tower at the southwest corner of the existing 11,000 sq. ft. exposed
aggregate till wall building,
Agency
Building Inspection
Electric
Reviewed By
Greg Jones
Jeff Curry
1 of 1
Review Date
7/29/2008
7/30/2008
Engineering
Michael Garza
7/31/2008
Fire Administration
Parks and Recreation
Planning Department
Tim Oates
John Elias
Gary Sieb
7/31/2008
7/29/2008
7/24/2008
Comments
1. No comment
Please contact Larry Redick at 972-323-8917 to discuss
electric service requirements.
1. New easements should be dedicated by separate
instrument.
No comments regarding this site plan amendment.
No comments.
1. Moye wrought iron gate from south side to east side of
proposed tower compound on Drawings C-2 and
C-3.
2. Dimension distance from tower foundation center line
to east property line on Drawing C-2.
3. Landscaping removed from compound construction
needs to be replaced elswhere on site. Please show
where and what plant materials are proposed.
4. Dimension distance from west wall of compound to
Heartz Road on Drawing C-2.
5. Explain operation of bell tower, I.e., how often bells
ring, decibel level, any "tune", etc.