Power-Telco Site Plan
I I'
ELECTRICAL NOTES
\ FROM POWER PG~E
0J
1. ALL WORK IS TO COMPLY WITH THE LATEST EDITION OF THE NATIONAL
ELECTRIC CODE (N.E.C.) AND ANY LOCAL ORDINANCES, CODES, AND
ALL OTHER ADMINISTRATIVE AUTHORITIES HAVING JURISDICTION. THE
CONTRACTOR SHALL FURNISH AND PAY FOR ALL PERMITS AND RELATED
FEES.
2. ALL EQUIPMENT AND MATERIAL FURNISHED AND INSTALLED UNDER THIS
CONTRACT SHALL BE UNDERWRITERS LABORATORIES (U.L.) LISTED, NEW,
FREE FROM DEFECTS, AND SHALL BE GUARANTEED FOR A PERIOD OF
ONE YEAR FROM DATE OF FINAL ACCEPTANCE BY OWNER OR HIS
REPRESENTATIVE. SHOULD ANY TROUBLE DEVELOP DURING THIS PERIOD
DUE TO FAULTY WORKMANSHIP, MATERIAL OR EQUIPMENT, THE
CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIALS AND LABOR
TO CORRECT THE TROUBLE WITHOUT COST TO THE OWNER.
I
tiQIE;
ALL HARDWARE TO BE
PRO~DED BY GENERAL
CONTRACTOR
120/240V, 1 ph, 3W
3#3/0-2"C~) ELECTRIC SERVICE
NOTE:
CONTRf CTOR SHALL INSTALL NEW
200 A~ P BREAKER AND METER
I, / NEW ELECTRIC METER & DISCCNNECT
0' 200 A/2P
MAIN SERVICE DISCONNEC
22 KA AIC
I ~ 3#3/0, 1 #2G-2"C (THWN- CU)
~ r--120/240 VAC PPC
I
3. ALL WORK SHALL BE EXECUTED IN A WORKMAN LIKE MANNER AND
SHALL PRESENT A NEAT MECHANICAL APPEARANCE WHEN COMPLETED.
CONTRACTOR SHOULD AVOID DAMAGE TO EXISTING UTILITIES WHEREVER
POSSIBLE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING
AND PATCHING RELATED TO ELECTRICAL WORK, AND SHALL RESTORE
ALL EXISTING LANDSCAPING, SPRINKLER SYSTEMS, CONDUITS, WIRING,
PIPING, ETC. DAMAGED BY THE ELECTRICAL WORK TO MATCH EXISTING
CONDITIONS.
4. ELECTRICAL WORK SHALL INCLUDE, BUT NOT BE LIMITED TO, ALL LABOR,
MA TERIALS AND EQUIPMENT REQUIRED TO COMPLETE ELECTRICAL POWER
AND LIGHTING SYSTEMS, TELEPHONE AND COMMUNICATION SYSTEMS,
PANEL BOARDS, CONDUIT, CONTROL WIRING, GROUNDING, ETC. AS
INDICA TED ON ELECTRICAL ORA WINGS AND JOR AS REQUIRED BY
GOVERNING CODES.
200 AMP
MAIN
60A/2P C
60A/2P C
20A/1 P C
15A V1 P C
tiQIE;
G.C. TO PRO~DE CONDUCTORS
FOR THE TRANSFORMER TO THE
METER BASE
2#12, 1 #12G-3/ 4"C
~ GFI REC.
...... TO LIGHT
2#12, 1 #1 ~ G-3j 4"C .....
...... TO B TS
3#6, 1 #6G- 2"C .....
I
I
2"C, W/PULL WIRE
BOND NEUTRAL & GROUND BUS IN MAIN SERVICE DISCONNECT
~ FUTURE BTS
DEMAND LOAD
AMPS
2.38
--
4.42
37.6
37.6
1.0
----~
83.0
0.6
83.6
200
5. PRIOR TO INSTALLING ANY ELECTRICAL WORK, THE CONTRACTOR SHALL
VISIT THE JOB SITE AND VERIFY EXISTING SITE LOCATIONS AND
CONDITIONS AND UTILITY SERVICE REQUIREMENTS OF THE JOB, AND BY
REFERENCE TO ENGINEERING AND EQUIPMENT SUPPLIERS DRAWINGS.
SHOULD THERE BE ANY QUESTION OR PROBLEM CONCERNING THE
NECESSARY PROVISIONS TO BE MADE, PROPER DIRECTIONS SHALL BE
OBTAINED BEFORE PROCEEDING WITH ANY WORK.
6. PROVIDE POWER AND TELEPHONE TO SERVICE POINTS PER UTILITY
COMPANY REQUIREMENTS. CONTRACTOR SHALL CONTACT UTILITY
SERVICE PLANNERS AND OBTAIN ALL SERVICE REQUIREMENTS AND
INCLUDE COSTS FOR SUCH IN THEIR BID.
ELECTRIC LOAD SUMMARY
AREA OF SPACE (164) SF SERVICE VOLTAGE 120/240 V 1~
CONNECTED LOAD
DEMAND
FACTOR
KVA
0.57
1.06
9.0
9.0
0.12
AMPS
2.38
4.42
37.6
37.6
1.0
1.0
1.0
1.0
1.0
1.0
KVA
0.57 I
1.06 I
9.0 I
9.0
0.12
19.75
0.14
LIGHTING (175W HPS)
RECEPTACLES (1)
BTS #1
BTS #2
TELCO PANEL
DEMAND LOAD
LIGHTING x 0.25
TOTAL LOAD
---- --~_._---- --- - ---
TOTAL SERVICE CAP.
--- -
7. SERVICE EQUIPMENT SHALL HAVE A SHORT CIRCUIT WITHSTAND RATING
EQUAL TO OR EXCEEDING THE MAXIMUM AVAILABLE FAULT CURRENT AT
THE SUPPLY TERMINAL ON THE UTILITY TRANSFORMER SECONDARY, THE
INSULATION SHALL BE FREE FROM ANY SHORT CIRCUITS AND GROUNDS.
--
8. ALL WIRES SHALL BE STRANDED COPPER WITH THHNjTHWN AND 600
VOLTS INSULATION. ALL GROUND CONDUCTORS TO BE PROPERLY SIZED
COPPER. (STRANDED OR SOLID).
9. IN THE EVENT OF ANY CONFLICT OR INCONSISTENCY BETWEEN ITEMS
SHOWN ON THE PLANS AND JOR SPECIFICATIONS, THE NOTE,
SPEC/FICA TION OR CODE WHICH PRESCRIBES AND ESTABLISHES THE
HIGHEST STANDARD OF PERFORMANCE SHALL PREVAIL.
- - --- -T -- a~_ _0- 0 \-_ 0 -----~-~-- --
0- _ __ _
1/
\
10. SERVICE CONDUITS SHALL HAVE NO MORE THAN (2) -90. BENDS IN
ANY SINGLE RUN. THE CONTRACTOR SHALL PROVIDE PULL BOXES AS
NEEDED WHERE CONDUIT REQUIREMENTS EXCEED THESE CONDITIONS.
PULL WIRES AND CAPS SHALl_ BE PROVIDED AT ALL SPARE CONDUITS
FOR FUTURE USE.
11. ALL ELECTRICAL EQUIPMENT SHALL BE ANCHORED TO WITHSTAND 100
M.P.H. WIND SPEED AND DESIGNED FOR OUTDOOR EXPOSURE.
12. ALL COAX, POWER AND TELEPHONE SYSTEM CONDUITS SHALL HAVE A
MINIMUM 24" SCH. 80 PVC RADIUS SWEEPS TO EQUIPMENT, PULLBOXES,
MONOPOLE, ETC., UNl_ESS OTHERWISE NOTED, OR AS REQUIRED BY
UTILITY COMPANIES.
13. FUSE TYPE SHALL BE BUSSMAN RKI LOW PEAK FUSE (LPU-RK-100).
14. UPON COMPLETION OF THE JOB, THE CONTRACTOR SHALL FURNISH
AS-BUILT DRAWINGS TO THE OWNER.
,
I
I
I
i
:
15. GENERAL GROUNDING CRITERIA 1 ST STEP: GROUND TO EXISTING
BUILDING STRUCTURAL STEEL AND TO THE EXISTING COLD WATER LINE.
(WHERE APPLICABLE) THEN TEST GROUNDING RESISTANCE TO WITHIN 1
TO 5 OHMS OVERA.LL GROUND RESISTANCE. WHERE THE EFFECTIVE
RESISTANCE DOES NOT MEET THIS CRITERIA, PROVIDE SUPPLEMENTAL
GROUNDING AND RE - TEST UNTIL GROUND RESISTANCE FALLS BELOW
THIS LEVEL. SUPPLEMENTAL GROUND MAY CONSIST OF ONE OR MORE
OF THE FOllOWING:
1) COUNTERPOISE,
2) UFER GROUND,
3) GROUND ROD AND JOR GROUND WELL IN EXTREMELY ADVERSE
SOIL CONDITIONS. WHERE THE EXISTING BUILDING STEEL DOES NOT
PROVIDE AN EFFECTIVE GROUND RESISTANCE, THEN THE CONTRACTOR
SHALL PRO~DE A SEPARATE GROUND CONDUCTOR FROM ROOF
MOUNTED BTS EQUIPMENT LOCATIONS EITHER DOWN THROUGH THE
INSIDE OF THE BUILDING OR DOWN THE OUTSIDE OF THE BUILDING,
DEPENDING UPON OWNER PREFERENCE. WHERE THE GROUND CONDUCTOR
FROM THE ROOF MOUNTED EQUIPMENT IS ROUTED IN CONDUIT, THE
CONDUIT SHALL BE EFFECTIVELY GROUNDED TO THE GROUND
CONDUCTOR AT BOTH ENDS OF THE CONDUIT. (MONOPOLE
INSTALLATIONS): FOR INSTALLATIONS WHERE WOODEN STRUCTURES,
TOWERS, CONCRETE SILOS ETC. ARE ENCOUNTERED A SEP ARA TE
DOWNLEAD SHALL BE PROVIDED FROM THE 3 ANTENNAS SEPARATED BY
A MINIMUM OF 12 INCHES FROM THE COAXIAL CABLES. THE GROUND
CONDUCTOR SHALL BE SECURELY FASTENED TO THE EXTERIOR OF
OUTSIDE STRUCTURES WITH NONMETALLIC GROUND STRAPS EVERY 10
FEET. AGAIN, AS FOR TENANT IMPROVEMENT PROJECTS, TEST THE
GROUND RESISTANCE FOR MONOPOLE INSTALLATIONS AND PROCEED PER
THE ABOVE STEPS.
16. CONTRACTOR TO COLOR PHASE CONDUCTORS BLACK (B PHASE), RED
(A PHASE), WHITE (NEUTRAL), AND GREEN (GROUND).
17. CONTRACTOR TO PROVIDE GUTTER TAP.
NEV\ UTILI TY RACK
I W/ PPC UNIT &
~ / 200A METER/DISCONNECT
~ /
(L~/ ~ d ~;d-= ~ V I ~
q ~ / ~" "I~"'~ IP Pi,> P P P P '- P P P P P ) P
IU I I · J T T IT T T 1, T T T T T T
\ A. ___ r~ ~~r--" I
- IJ f-r- - --!- - - -1- - - -- - --
I : / c:::: I FOR POWER FROM POWER POLE TO MET[R
! / -
J I NOTE: G.C.!O PROVIDE CONDUCTORS FF~OM
:..--) -r"--' J I TRANSFORM:.R TO METER BASE.
I
I
I NP
I
I
I
I
I
>
(
I
)
, I
,
I
I
/
/
/
i / I
I I
~~ - - - - - - - - - - - - - - ~
i
//
I
NEW 8' WIDE
U'ILlTY EASEMENT \ ! -0:
_ _ _ _ \_ _ _ J -o~~
P 1- I
T~ I
------~
I
127'-7"
(2) 3"rIJ BURIED SCH.40 PVC CONDUIT
FOR TELCO FROM TELCO PEDESTAL
TO PPC UNIT Wi MULETAPE AND CAP
NP
POWER/TELCO SITE PLAN
SCALE: 1 /8" = l' - 0"
P
T
o
o
I
\J I
I (E)
tt 11' -9"71/ TELCO
\J L "'- Ii PED
~ -~I/ ,
-o~- =P '
I
\J I
---1
I
\J 1
---1
I
\J I
---11
I
\J
---11
I
-0 --l I
I
\J ---1 I
I
\J ---1 I
I
I \J I
---1
I
\J I
---1
I
\J I
---1 I
\J I
---1
(E) UTILITY
POLE
v
y
NEW 5' WIDE
UTILITY EASEMENT ~ -o--l
P
T
P
T
NEW PULL BOX
~
\~
NORTH
f<
(
/
/ --~'<
\
)
/ (
~
1
I
!
<
~
'k
k
(
o
I
<.D
I
/
_\.
I
x
I
--/--
\\
I
l
I
I
~;
: I
~.
I
" I
"' ,
><
:j
~.
I
I
I
I
I
i
I:
I
I
I
I
,
,
V
I
~
//
o
I
I
I
I
o
r-r)
~
I
I
//
/v
I~
~\JG ~ 1 "L ~~
I
>~
/
LU
C-
O
:r:
19
z
I--t
>
I--t
...J
:r:
u
0:=::
:=)
:r:
u
,,~-
OCLOO S'" -',
(". f~ ,.,.
.... .) . .... -j' lj t'i 1/
609 SOUTH KELLY AVENUE, SUITE D
EDMOND, OKLAHOMA 73003
(405) 348-5460 - OFFICE
(405) 341-4625 - FAX
I PROJECT NO:
I DRAWN BY:
l CHECKED BY:
D A 1456 ]
CG/DL/CEC/SZ I
JMG I
11 08/26/08 RE\1SED FINAL - CITY COMMENTS
10 08/11/08 RE\1SED FINAL - CITY COMMENTS
9 08/06/08 RE\1SED FINAL - CITY COMMENTS
8 07/24/08 FINAL REVISED
7 07/14/08 REV. PRELIM CD
6 07/03/08 FINAL ZONING
o~
Q)
0::: U Q) ("')
z: L- 'oo:::t
- LL. N
O:CLO
o r-
CL ::l en >< C"1
o C en
0::: .c I- ex:> LO E
(9 -f5 u)'oy ~ 0
---I (9 en m M ex;> .~
Z C om ~ 'o:::t 0')
- 0 N <0 U
I I- -c -r- C"1 e
----I ~ C 'oo:::t en ,).... a.
-J >.0 ~-
en -IN Qj~ ~
~Rgj~~~~
'-" en en CL LL. ~
08/26/08
-~~"""~,.~.~,~,~ '"
"'\'
~?-- \":- C) r T /:..-:- I ~ \
;- \~ .........~ '1 ' -
.:1" 0'" <.. , \, f"'""\ ". \5' , t
~ · ._,," ~lJ . ~.t
,~ *_ ~./'::'A.r . I'
L _~ r..:. "k .,
- ~Q: . : . · ~ CJ;. . .. . . .. · :.. . · . ~
~ JOJi, MO rTACK~.L GEORGE ~
~ ................iI
" . .. . . lr . n · · · · · · . a: '"
I, ~, ". 91793/ .: t-i./ .:
# "0 . (" ,? ..). ~/--,
t1 A'" .'CENS(.... I _'~'
· '''<.'-n .... It . · .. ~j':-
h \.) \,.'\/ . <'::,--
'f.\ '~.. (iN AL v ~:e'
\\..~ ' ,....~~
o '.:,,~:"<<x,~~
DA1456
LIVING HOPE CHURCH
200 SOUTH HEARTZ ROAD
COPPEll, TEXAS 75019
CITY OF COPPEll
SHEET TITLE
POWER/TELCO SITE PLAN,
POWER ONE LINE DIAGRAM
& ELECTRICAL NOTES
SHEET NUMBER
E-1