CC PH Action Letter 091008
THE.CITY.OF
COPPELL
September 10, 2008
o
Mr. John Howell
1229 Canes Court
Carrollton, TX 75006
RE: Deer Run Addition, Phase II, Lot 1. Block 1. Minor Plat
Dear Mr. Howell:
This letter is to inform you that the Deer Run Addition, Phase II, Lot 1, Block 1, Minor Plat.
to establish a building site and setback lines to allow the construction of a new single-
family home to front on Hawken Drive on property located at 600 Ruby Rood, was
approved by the Coppell City Council (6-0) on Tuesday, September 9, 2008, subject to
the following conditions that need to be met prior to the issuance of a building permit
for the single-family home on this lot:
1. If any trees are to be removed, a Tree Removal Permit will be required, and the
tree survey will need to be brought into compliance with 12-34-2 of the Zoning
Ordinance.
2. Engineering review and approval of the location of new taps and meters for
water and sewer.
3. Drainage will be evaluated during engineering plan review.
4. Engineering review and approval of proposed curb cut on Hawken, and the
removal of the curb cuts on Ruby Road.
This minor plat must be submitted for signatures by City Officials within six months after
approval by the City Council. March 9, 2009, or it shall be deemed null and void and
resubmittal shall be required. It is recommended that this minor plat not be prepared for
filing, including obtaining the franchise utility signatures, until after receiving Engineering
comments on the first review of the civil plans. After City signatures have been procured,
it is the applicant's responsibility to file the document with the Dallas County Plat Records
Department. Please see the enclosed checklist for the requirements for filing.
If you have any questions, please contact the Planning Department at (972) 304-3678.
erely,
~ (ti~p
iredor of Planning
cc: Billy Duckworth, Analytical Surveys, Inc.
Building Inspection
File
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673