Loading...
DRC Comments 082908 THE.CITY.OF COPPELL 2f~*~~ e ~ q X A \ \) q Ii . Planning Department 255 Parkway Blvd Cappell, Texas 75019 Phone: 972-304-3678 Fax: 972-304-7092 DRe Agenda and Staff Comments PROJECT: Leslev Retail Addition, Blocks A and B & Dividend R.O.W. Preliminary Plat, Dividend Drive (Lesley Retail Addition), Final Plat PLANNING DEPARTMENT CONTACT: Matt Steer DIRECT DIAL: 972-304-3559 DATE: August 29, 2008 FAX COVER SHEET PAGES: !5 (including cover) lFt:~ TO: C. Jack Evans Pacheco Koch Consulting Engineers FAX: 972-235-9544 Items Transmitted: 1. Agenda for the September 4, 2008 ORC Meeting 2. ORC Comments Remarks: A. Please revise all plans and plat(s) based on staff recommendations. Should the applicant disagree with staff comments, please provide reasons why staff recommendations should not be followed when you attend the September 4, 2008 Development Review Committee (ORC) meeting. B. Each applicant will bring two new sets of revised plans and plat(s) to the September 4, 2008 DRC meeting. Applicants will be asked to show, explain and defend any revision. A representative of the project is required to attend this meeting. C. The applicant will have until noon, September 9, 2008 to submit 12-24' x 36' sets, FOLDED, and three (3) reduced paper copies (8 1/2 X 11) and JPEG, TIF, PDF OR SIMILAR ELECTRONIC FORMA T of each exhibit. Only two sets of revised preliminary engineering and irrigation plans are required. Reductions and electronic copies are not required of the engineering and irrigation plans. If you have any questions or would like additional information, please contact me at 972-304-3559 or e-mail atmsteer@cLcoppell.tx.us T H E C I T Y o F THE C I T Y o F CITY OF COPPELL ORC REPORT COPPELL .~~*~~"f.. f ;~~:-~ .t 1'\ .) \ ~ Proiect ID PP.08.0038 Address 9 parcels Proiect Name Lesley Retail Addition. Blocks A and B & Dividend Proiect Type Preliminary Plat Application Date 8/19/2008 Case ManaQer Matt Steer Proiect Description to establish property boundaries and the alignment of Dividend Drive on 28.142 acres Agency Building Inspection Electric Reviewed By Greg Jones Jeff Curry of Review Date 8/27/2008 8/28/2008 Engineering M.Garza 8/28/2008 Fire Administration Parks and Recreation Planning Department Tim Oates John Elias Matt Steer 8/28/2008 8/25/2008 8/27/2008 Comments 1. No platting comments Please contact Jeff Curry at 972-888-1330 to discuss easement requirements. 1. When Lots on Block A and B are developed, they will be responsible for the sidewalks. 2. The median should be changed to be a raised median. 3. Utility, drainage and easements will be evaluated when more information is available on the development of the site. 4. Is a decellane going to be provided? 5. A sidewalk! utility easement may need to be required along Belt Line Rd. 1. This road must be named EAST Dividend Drive 1. No comment. 1, Remove signature blocks. 2. Include "in the city of Dallas" after "Zoned PD.7 41 ". 3. Include all existing right-of-way and label "to be abandoned" if that is the intention". 4. Increase line width of property lines and fade out other line types and delete topo information. Pacheco Koch Consulting Engineers September 9, 2008 PK No.: 2768B-08.203 Mr. Matt Steer THE CITY OF COPPELL Planning Department 255 Parkway Boulevard Coppell, Texas 75019 ~~ Re: LESLEY RETAIL ADDITION Blocks A B and East Dividend Drive PRELIMINARY PLAT Project ID #: PP-08-0038 Coppell, Texas This letter is to notify you that the enclosed Construction Plans have been revised in accordance with your August 29, 2008 Review Memorandum. The following items have been addressed as per the referenced review: Electric · Please contact Jeff Curry at 972-888-130 to discuss easement requirements. Response: 10' Utility estimates added per On cor's request. Engineering . When Lots on Block A and B are developed, they will be responsible for the sidewalks. Response: The developer has been advised that as the lots develop they will be responsible for sidewalks. · The median should be changed to be a raised median. Response: The median has been revised according to City of Coppell Standards. . Utility, drainage and easements will be evaluated when more information is available on the development of the site. Response: Noted. · Is a decellane going to be provided? Response: The developer does not intend to provide a deceleration lane at this time. . A sidewalk/utility easement may need to be required along BeltLine Rd. Response: 10' Utility Easement added along Beltline Rd. 8350 North Central Expressway SUite 1000 Dallas, Texas 75206 972 2353031 Fax 972 2359544 www pkce com Mr. Matt Steer September 9, 2008 Page 2 Fire Administration · This road must be named EAST Dividend Drive. Response: Name has been revised to East Dividend Drive. Planning Department · Remove signature blocks. Response: The signature blocks have been removed. · Include "in the city of Dallas" after "Zoned OD-741". Response: Notes: "in the city of Dallas" and in the City of Irving have been added. · Include all existing right-of-way and label "to be abandoned" if that is the intention. Response: Per the DRC meeting it is difficult to determine the status of the right - of- way shown on the DCAD map. PK recommends a "Quit Claim" document be used to abandon any right - of - way that may exist. · Increase line width of property lines and fade out other line types and delete topo information. Response: The line widths have been adjusted according to comment. Existing contours have been removed as requested. If you have any questions or need any additional information, please call at your earliest convenience. Sincerely, bLK)P- Brian A. Jaffe BAJ/anw 2768-213