Loading...
DRC Comments THE.CITY.OF COPPELL ..~..,. el( ~ ~q "'.s . \ Planning Department 255 Parkway Blvd Coppell, Texas 75019 Phone: 972-304-3678 Fax: 972-304-7092 DRC Agenda and Staff Comments PROJECT: PD-238-HC, CaDDell Office Villaae, and ReDiaV' PLANNING DEPARTMENT CONTACT: Marcie Diamond DIRECT DIAL: 972-304-3676 FAX COVER SHEET DATE: December 29,2008 TO: Terry Holmes L. Lynn Kadleck Tabitha (Mike Adams) Items Transmitted: PAGES: S (including cover) FAX: 972-242-2931 v972-509-1861 J/972-245-8705 1. Agenda for the January 2, 2009 DRC Meeting 2. DRe Comments Remarks: A. Please revise all plans and plat(s) based on staff recommendations. Should the applicant disagree with staff comments, please provide reasons why staff recommendations should not be followed when you attend the January 2, 2009 Development Review Committee (DRC) meeting. B. Each applicant will bring two new sets of revised plans and plat(s) to the January 2, 2009 DRC meeting. Applicants will be asked to show, explain and defend any revision. A representative of the project is required to attend this meeting. C. The applicant will have until noon, January 6, 2009 to submit 12-24' x 36' sets, FOLDED, and three (3) reduced paper copies (8 1/2 X 11) and JPEG. TIF. PDF OR SIMILAR ELECTRONIC FORMA T of each exhibit. Only two sets of revised preliminary engineering and irrigation plans are required. reductions and electronic copies are not required of the engineering and irrigation plans. If you have any questions or would like additional information, please contact me at 972-304-3676 or e-mail atmdiamondla>.ci.coooell.tx.us THE CITY.OF THE.CITY.OF CITY OF COPPELL ORC REPORT COPPELL ~.,.,..- Jf. * . ~ . . 0 e . ..t J\ oS . \ & COPPELL ~"- -c-.~* r .t . .... Proiect 10 RP-08-0049 Address 147 E Vista Ridge Blvd Project Name Coppell Office Village, Lot 1, Block A Project Type Replat Application Date 12/16/2008 Case Manager Marcie Diamond Project Description being a replat of the U-Haul Addition, Lot 1, Block 1, to relocate and revise easements to allow the development of an office building Agency Building Inspection Electric Engineering Reviewed By Greg Jones Jeff Curry Michael Garza of Review Date 12/18/2008 12/26/2008 12/23/2008 Fire Administration Tim Oates 12/22/2008 Parks and Recreation Planning Department John Elias Marcie Diamond 12/23/2008 12/22/2008 Comments 1, No comments on replat. No Comments Received 1. Remove "utility easement" from the fire lane. 2. Include a 20' utility easement for the sanitary sewer main. 3. Include a 5' drainage easement on the east side of the property. 1. Entire width of the driveway off SH 121 is required to be dedicated as fire lane. 2. Fire lane indicated on the plat and site plan are not the same. No comments. 1. Remove Variance note from replat - the variance is part of the PO zoning request. 2. Check spelling and typos on existing easements to the east of this property.