Loading...
FAX DRC Agenda, Comments T H E • C 1 T Y • O F ~ COPPELL ~ ~ ~ 0 ~ x A g . ~ a Q , ~ ~ ~ ~ ~ ~ ~ Planning Department . ~ 255 Parkway Bivd ' Coppell, Texas 75019 Phone: 972-304-3678 Fax: 972-304-7092 PROJECT: PD-240-HC. North Gatewav Center North Gatewav Center Preliminarv Plat. PD-240R-HC North Gatewav Center Lot 5 Block A(Rozas Cafe) C~ North Gatewav Center, lot 5 Block A(Rozas Cafe) Fincl Plat PD-240R2-HC North Gatewav Center, Lot 9, Biock A North Gatewav Center Lot 9 Block A Finai Plat PLANNING DEPARTMENT CONTACT: Matt Steer (5' e D DIRECT DIAL: 972-304-3559 LI FAX COVER SHEET DATE: February 27, 2009 PAGES: (including cover) TO: l~on Harrelson FAX: 817-251-8810 Items Transmitted: 1. Agenda for the March 5, 2009 DRC Meeting 2. DRC Comments Remarks: A. Please revise all plans and plat(s) based on staff recommendations. Should the applicant disagree with staff comments, please provide reasons why staff recommendations should not be followed when you attend the March 5, 2009 Development Review Committee (DRC) meeting. B. Each applicant will bring two new sets of revised plans and plat(s) to the March 5, 2009 DRC meeting. Applicants will be asked to show, explain and defend any revision. A representative of the project is required to attend this meeting. C. The applicant will have until noon, March 10, 2009 to submit 12-24' x 36' sets, FOLDED, and three (3) reduced paper copies (8 1/2 X 11) and JPEG. T/F, PDF OR S/MILAR ELECTRONIC FORMAT of each exhibit. Only two sets of revised preliminary engineering and irrigation plans are required. Reductions and electronic copies are not required of the engineering and irrigation plans. If you have any questions or would like additional information, please contact me at 972-304-3676 or e-mail at msteer .ci.coaoell.tx.us ~_T H E C 1 T Y O F T M 6 • C 1 T Y O ¦ COPPELL CITY OF COPPELL COPPELL ~ ~ ~ DRC REPORT ~r ~ o ~ r o ~ X A b . 1$ 9 ~ X B 4 ~1 S . l Proiect ID PD-09-0009 Proiect Name PD-240-HC, North Gateway Center Address Proiect Tvpe Re-Zoning PD Application Date 2/19/2009 Case Manaaer Matt Steer Proiect Descriotion Zoning change request from HC (Highway Commercial) to PD-240-HC (Planned Development-240-Highway Commercial), to establish a Concept Plan for a 9 lot commercial development on 12.362 acres of property located at the northwest corner of S.H. 121 and Denton Tap Road 1 of 2 Agency Reviewed By Review Date Comments Building Inspection Lee Stone 2/26/2009 1. Grease trap shall be required for each restaurant. Electric Jeff Curry 2/26/2009 No Comments Received. Engineering Michael Garza 2/26/2009 1. A property owner's agreement is required for maintenance of drainage, pavement and water line. 2. Development is responsible for the 4th leg of the traffic signal at the intersection of Highland Drive and Denton Tap. Show the intersection of Highland Dr. and Denton Tap on the plans. 3. A 5' Sidewalk along SH 121 should be placed inside the property line in an easement. Sidewalk should also be installed along Denton Tap Rd. 4. The water line should be a private line. Water services should come off of public water line. 5. Sanitary Sewer line is shown tying into Lewisville's sewer line. Must be rerouted to tie into Coppell's sewer line. 6. Grading and drainage plans will be further evaluated during the engineering plan review. Drainage into TXDOT's system should be coordinated with them. 7. The decel lane should be coordinated with TXDOT. 8. Provide a copy of the Tra~c Impact Analysis. 9. What is the phasing of construction? 10. Overhead utilities along the west side of Denton Tap Rd. should be buried in agreement with Texas New Mexico. Fire Administration Kevin Richardson 2/26/2009 1. Label the fire lane on the plans. 2. All buildings over 5,000 SF will need to be sprinkled. 3. Show FDC's and Fire Hydrants. Parks and Recreation John Elias 2/23/2009 1. Tree Removal Permit required prior to start of construction. 2. Tree Survey is incomplete. Planning Department Matt Steer 2/26l2009 Site Plan: 1. Rename to "North Gateway Center, Lots 1-9, Block A" as we currently have a Gateway Business Park in the City. 2. Correct inconsistencies in the Site Data Table and footnotes. 3. Include a large note in bold that states that this is a Conceptual Plan only and each individual site will be evaluated upon detail plan review. The purpose of the conceptual plan is to establish architectural consistency, monument sign locations, exceptions to the standard monument sign sizes, mutual access, fire lanes and to allow other general PD Conditions across the entire development. 4. Include a PD conditions table. 5. Revise proposed percentages of retail, office and T H c• c i T r• o F T M a. c i r r• o r COPPELL CITY OF COPPELL COPPELL ~~T ~ ~ DRC REPORT ~ ti ~ ~ o r ~ X A g ' ~ g 9 ~ X A 1 g 9 O Agency Reviewed By Review Date Comments b restaurant space within the development to resolve any parking deficiencies. If a shared parking agreement is proposed, submit a draft version. Lot 9 appears to be under parked by 10 spaces and the adjacent Lot 8 is also 7 spaces under parked; therefore, would not be able to compensate for the shortfall. It is possible that Lot 7 could account for Lot 8's deficiency. Lots 2 and 3 are also under parked. 6. The second chart shows landscape areas required and those provided; however, is missing the perimeter landscaping category. Please include. Ensure none of the three landscaping categories (Perimeter, Nonvehicular and Interior) are counted more than once. • 7. Depict each proposed sign location. 8. Revise legend to include fire lane/mutual access easement for the shaded area. 9. Include note within the PD Conditions table that each drive thru will be screened with evergreen landscaping. There are several locations that show inadequate area for this screening. This will need to be addressed at time of Detail PD for each of the respective lots. 10. The rear building on Lot 1 is more appropriate as office use than as retail or restaurant due to the residential adjacency. 11. Depict all existing and proposed easements. Does the 7.5' Utility Easement not extend on this property along the north and west property lines? 12. Include 6' masonry wall details on elevation sheet. Is this proposed to be maintained by a property owners association? 13. Are there trees on the northwest corner and along the west side of Lot 9? 14. Remove overlapping text. 15. Include percentage of each proposed use within the building footprints. 16. Include City and County limits within the vicinity map. Tree Survey: 1. Depict all existing trees. 2. Include all existinc~ and proposed easements. Elevations/Monument Sign Details: 1. Why not use standing seam in place of the brown composition shingle roof. 2. Measure width of sign from edge to edge of cast stone. 3. Check scales. 4. List all materials and colors of stone and sign panels.