Staff Report
CITY OF COPPELL
PLANNING DEPARTMENT
5T AFF REPORT
CASE NO.: S-l 033R2-SF-12. Manara Academy
P&Z HEARING DATE:
C.C. HEARING DATE:
May 21,2009 (Tabled at the April 16, 2009 meeting)
June 9, 2009
STAFF REP.:
Marcie Diamond, Assistant Director of Planning
LOCATION:
140 S. Heartz Road
SIZE OF AREA:
4.58 acres of property
CURRENT ZONING:
S-l 033R-SF-12 (Special Use Permit-1 033 Revised-Single Family-12)
REQUEST:
Revised for May 21, 2009 meetlngV : A zoning change to S-1 033R2
SF-12 (Special Use Permit-1033 Revision 2-Single Family-12), to
allow a Charter School for Grades K-5th, with a enrollment
capacity of 326, to occupy the Christ Our Savior Lutheran Church
building. The church shall also be permitted to remain as a
secondary use.
APPLICANT:
Sadak Shaik
4070 N. Beltline Road, Suite 110-140
Irving, Texas 75038
214-868-6472
FAX: 214-260-4684
HISTORY:
In 1988, the Final Plat for Christ Our Savior Lutheran Church was
approved by Council. November 1989, SUP-1033 was established
for a church, nursery and school. On July 9, 1998, the Board of
Adjustment approved a temporary (for a period of 24 months)
shade structure over the playground which had padded metal
poles instead of the required brick cladding. The intent was to allow
this shade structure to be relocated to an inner court area when
v Revisions from the original staff report are noted in Bold and strike through as necessary.
ITEM #4
Page 1 of 6
.
the building was expanded. In January 1999, a revised site plan
was approved to allow a building expansion for a sanctuary,
fellowship hall and additional classrooms, essentially doubling the
size of the structure. In September 1999, a Site Plan Amendment
was approved allowing the retention of the shade structure in the
location as initially approved, subject to the support poles being
clad with brick. The poles have yet to comply with this condition.
The property owner Is working toward complying with this condition.
TRANSPORT AlION:
HeartzRoad is a C2U - 2-lane undivided street within 50 ft of R.O.W.
with 37 feet of paving.
SURROUNDING LAND USE & ZONING:
North - undeveloped; SF-12
South - Westbury Manor; PD-166-SF-7
East - Westbury Manor; PD-166-SF-7
West - Braewood West, 2nd Revision; SF-7
COMPREHENSIVE PLAN:
The Comprehensive Plan indicates this area as appropriate for
Public/Institutional uses.
DISCUSSION:
This request is to allow the second public charter school,
authorized by the Texas State Board of Education, in the City of
Coppell. Monaro Academy desires to occupy the Christ Our
Savoir Lutheran Church building at 140 S. Heartz Road. During the
next 12 months, the church and school will co-occupy this
building. After that time, the school will purchase the building
and the church will relocate to a new facility.
Ultimately, Manara Academy's Charter awarded by the State
Board of Education on November 20, 2009 permits classes from
kindergarten through 8th grade with a maximum capacity of 500
students. The first year (current SUP request), only K-5th grades will
be provided with up to 326 students. The Academy proposes to
add a grade level each year over the next 3 years. By year four,
there will be 500 students and 40 employees, including 24
teachers and 16 additional staff members. The hours of operation
will be Monday-Thursday 8:00 a.m. to 3:30 p.m. On Friday, school
will begin at 8:00 a.m. and dismiss at 1 :00 p.m.
While this building has always been an institutional use providing
worship and educational services for the community, given the
ITEM #4
Page 2 of 6
.
change in nature and the intensity of the use, a revision to the
existing SUP is required. Initially, there will be no external physical
changes to the existing structure, except for signage. A forty
square foot attached sign with black individually mounted letters
and color logo not exceeding 20% of the area of the sign will be
over the front entrance facing Heartz Road. The face of the
existing monument sign will be changed to Manara Academy
with a green back ground, sunflower yellow letters and the multi-
color logo.
The site and landscape plans, as initially approved for the church,
will essentially remain unchanged during the first year. There is
sufficient parking to support this school. In the event Monaro
Academy receives approval via a revised SUP, after the initial
year of operation, at full capacity the number of students
projected for Manara Academy is similar to the elementary
schools in Coppell, which range in size from approximately 400 to
535 students. Per staff's request, the applicant has prepared a
detailed Traffic Circulation Plan (original study). The primary goal
is to assure that the traffic generated by this use does negatively
impact the functionality of Heartz Road, and no queuing for this
use to occur on-street. Currently, there is a prohibition of parking
(which by ordinance includes stopping and standing) along the
east side Heartz between Sandy Lake and Park Meadow Way.
The applicant has provided new 24-hour traffic counts for
northbound and southbound Heartz between Sandy Lake and
Westbury Drive. The peak volume is southbound during the a.m.
peak and northbound during the p.m. peak. There is sufficient
capacity on Heartz to support this use with the maximum
enrollment of 500 students. Included on the April 14th Council
Agenda is the authorization of design studies for various street
maintenance projects as funded by the 1/4 cent sales tax. The
Heartz Road improvement is included in this project. The timing of
this construction is not established at this time.
Based on preliminary data from the 270 student applications
received by Manara (which represents over 80% of the 1 st year
enrollment cap) the following assumptions provide the base data
for the original traffic circulation study:
· average students per family is 1.5 ;
· Approximately 75% of the vehicles will approach from
the south;
· 30% will ride the bus; and
· Approx 20% of the students will utilize after school
programs.
ITEM #4
Page 3 of 6
.
It is projected that during the 2009-2010 school year, 157 cars can
be expected during the peak drop off time periods. As detailed
in the original Traffic Circulation Plan, the on-site queuing has
been designed to accommodate 40 to 50 cars between the
driveway at Heartz to the drop-off under the porte-cochere.
Assuming that the average drop-off rate 8 to 10 students per
minute, 157 cars could be accommodated on site, with no
spillover onto Heartz Road, The school has also scheduled the
bus drop off to be complete prior to 7:40 a.m., therefore it will
not to conflict with the car traffic.
The dismissal plan includes parent parking and pick-up at
designated dismissal points within the school building. Busses will
depart at 3:50 which is after the peak parent pick-up times..
Finally, it must be noted that this analysis is based on year one
enrollment capacity of 326 students. However, as previously
stated over the next three years, the plan is to expand the school
by one grade level per year, to a maximum of 500 students. The
applicant has prepared understands that a condition of this SUP is
:f:.AGt.-a full Traffic Impact Analysis (TIA) for full build-out. will bo
required prior to the enrollmont exceeding 326 students. This TI/\
will have 1 st year operational data to be based on. Any physical
improvements (additional parking/paving, etc.) that may be
necessitated could be accommodated in year 2 after Manara
Academ'/ purchases the building.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Original recommendation: Staff is recommending APPROVAL of S-1033R2-SF-12,
Manara Academy subject to:
1. A full Traffic Impact Analysis shall be required and necessary site
improvements implemented as needed prior to the enrollment exceeding
326 students .
2. Drafting issues:
a. Correctly indicate the location of the existing trees on the site plan.
b. Correct title block on the Site Plan to indicate Manara Academy
c. Update elevations to illustrate correct attached signage.
REVISED RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Per Planning and Zoning Commission's recommendation on April 16, 2009,
Manara Academy employed Klmely-Horn Associates, Inc. to conduct a Traffic
Impact Analysis and a Traffic Management Plan to address both the on-site and
off-site traffic issues. This study:
· Analyzed 1St year operation at 350 (exceeds the charter mandated
capacity of 326, however, provides a conservative analysis) as well as build
out at 500;
ITEM #4
Page 4 of 6
I
· Studied the traffic generated by this use In relation to the existing capacity
on the affected street system and Intersections; and
· Provided a Traffic Management Plan to guide daily operations of the peak
drop-off and pick up time periods.
The results of this study indicated that there was sufficient capacity on the
surrounding street system to support this use and the Level of Service would not
be negatively affected. They did note however, that for the on-site system to
work, the employees need to be well trained and parents need to be
cooperative.
Also in this packet is the review of the Klmely Horn TIA by Halff Associates on
behalf of the City of Coppell. Halff confirmed that the traffic generated by this
school will allow for the maintenance of the existing Level of Service on the
surrounding street systems and intersections. One concern expressed in Halff's
review is how labor intensive on-site traffic management will be for the
employees of the school and how it requires full cooperation from the parents.
These conditions may only be addressed during the daily operation of the
school.
The other traffic Issue is the need for the physical separation of the parent drop
off loop from the bus loop. Halff has recommended the removal and
reconstruction of the existing hammer-head turn around, located south of the
building, Into a circular driveway to allow one way operation. The design of this
new circular drive will need to be approved by the Fire and Engineering
Departments.
The drafting Issues have been corrected, therefore, Staff Is recommending
APPROVAL of S-1033R2 SF-12 to allow a Charter School for Grades K-5th, with a
enrollment capacity of 326, to occupy the Christ Our Savior Lutheran Church
building. The church shall also be permitted to remain as a secondary use,
subject to the following conditions:
1. Approval of the design of the bus loop by the Fire and Engineering
Departments.
2. A revised SUP will be required in the event that the school remains after
the 2009-2010 school year.
ALTERNATIVES:
1. Recommend approval of the request
2. Recommend disapproval of the request
3. Recommend modification of the request
4. Take under advisement for reconsideration at a later date
ATTACHMENTS:
J. Review memo from Halff Associates, Inc.
ITEM #4
Page 5 of 6
.
2. Traffic Impact Analysis and Traffic Management Plan, prepared by Kimeiy-Horn and
Associates, Inc.
3. "Who is Monaro?"
4. Sign Plan
5. Revised Site Plan
6. Existing Landscape Plan
7. Revised Building Elevations
ITEM #4
Page 6 of 6
.