Loading...
SP attached to CC Packect 041310Duke CONSTRUCTION 5405 Batt lino Road Suns 300 76240 l 361-6700 I 361-0000 1 1 '7 11 11 j' T 7 1 III 3 .PA 1 E S 2.N INE OF 12' HIG TO BE DEMOLISHED --r LOT 2, BLOCK A DUKE LESLEY ADDITION (IN.ST. NO. 2007.0446909) PART OF TRACT 1 DUKE REALTY LIMITED PARTNERSHIP (INST. NO, 200600301442) (FILED: 08/16/2006) 36.173 ACRES (1,575,695 SF) PROPOSED ZONING "PD- 222R3 -LI" 240 DIVIDEND DRIVE ONE -STORY CONCRETE BUILDING I r‘79 w*rf»buser 15,800 SF VAR WAREHOUSE 11,400 SF 7 .,tra El In L%miR EiI FINISHED GOODS WAREHOUSE 77.200 SF MATERIAL WAREHOUSE 49,200 SF P 2-S.iOb SF 7 JR AREA (51SPLT) 20' ORA AGF f ASF MEN' NV NO 1X)1446909) A I ASE EN' 1 U L I A (INST. NO 200 SLIDING GATE WITH OPTICON KNOX BOX PER CITY OF COPPELL REQUIREMENTS BLACK VINYL CHAIN LINK FENCE (6-0 TALL) TO MATCH HEMISPHERE FENCE STRIPING FOR 46 TRUCK 43 PARKING SPACES (CONCRETE) 061 PARKING SPACES REMOVED WITH TYPICAL SPACES 9' WIDE 6"- HIGH- ONGRETE -CURB CONCRF TE PAVEMENT GRATE INLET TW./ 9 B ME TAI STAIRS SLIDING GATE WITH OPTICON KNOX BOX 6' PER CITY OF COPPELL REQUIREMENTS GUARD HOUSE (T-4" HEIGHT) ON MINIMUM 4" THICK CONCRETE PAD SLIDING GATE 2 COMPACTORS (2 -YARD) METAL PLATFORM ryI =:1 B 21 2' 9 SLIDING GATE WITH OP ICON KNOX BOX PER CITY OF COPPELL REQUIREMENTS 387-10" 7 DICER ELFCEPIC DE VfR 704,n, •9 ,•17 .S ND II'J44E =L:9) WATER EASEMENT (INST. NO 20070446909) T )M 10' 0NC COMPAN (INST N CDNCRE TEL PAVEMENT 10' BUILDING LINE B PARKING SETBACK VOL 98008, PG 11) REPLACE EXISTING CURB EXTEND CONCRETE DRIVE S 00 °29'23" W 111.44' 70'420 WATT .R EASFM) NT (INS'. NC. 20070446909' BENCH MARK LIST S_ 89'5 /'33" E WV 24 SP DIVIDLNID BM/ 1 TOP SECURITY MONUMENT 1MTH ACCESS COVER LOCATED AT THE SOUTHWEST CORNER OF BELTINE ROAD SOUTH LAKESHORE DRIVE. JUST NORTH OF A RECESSED INLET ON THE WEST CURB UNE OF BELTUNE ROAD SOUTH. CITY OF COPPELL GEODETIC CONTROL NETWORK BENCHMARK NO. 8. ELEV =517.39 BM 2 3 -1/2" ALUMINUM ALLOY TXDOT DISC STAMPED "D0570022" ON A 5/8" IRON ROD AT THE INTERSECTION OF IH835 AND BELTUNE RD. 300' WEST FROM THE CENTERUNE OF BELTUNE RD. ON THE WEST BOUND ENTRANCE RAMP TO IH835. 5' SOUTH OF THE EDGE OF PAVEMENT OF THE RAMP. BETWEEN THE WEST BOUND RAMP AND WEST BOUND IH 835. ELEV =535.53 BM/ 50 BM/ 51 BM/ 52 CUT ON THE EAST SIDE OF A WATER VAULT ON THE WEST SIDE OF BELTUNE ROAD SOUTH, ±2,660' NORTH OF THE WEST BOUND I.H. 835 SERVICE ROAD. ELEV =525.42 CUT ON THE WEST SIDE OF A UGHT STANDARD IN THE CENTER OF BELTUNE ROAD SOUTH. ±1,535 NORTH OF THE WEST BOUND I.H. 835 SERVICE ROAD. ELEV.-530.72 CUT ON CURB INLET IN THE CENTER OF BELTUNE ROAD SOUTH. ±90' SOUTH OF THE WEST BOUND I.H. 835 SERVICE ROAD. ELEV =533.71 4I SRAC S CONCRETE PAVEMENT DNCRE TE PAVEMENT 1,019.79' 0 DNCRE ,1 PAN ME N1 IIINIIINII' IIIIIIIIIIIII VIIIIINNII 3 PW ,E 1C' ONCDR ELECTRIC NI EVERY COMPANY EASEMENT ;INS' NO 200204 AT&T TELL. VAUI' W /MARKER 12 SP'C:S 96.36' BRICK -AU' STONE W CDNCRE TT PAVTMF N' NOTES: 1. INSURE ALL PLANTING MATERIALS ARE IN HEALTHY AND GROWING CONDITION. REPLACE THOSE THAT ARE NOT ALIVE. OWNER; DUKE REALTY, L.P. 14241 NORTH DALLAS PARKWAY, SUITE 1000 DALLAS, TEXAS 75254 PHONE: (972) 361 -6700 ENGINEER; PACHECO KOCH CONSULTING ENGINEERS, INC. 8350 NORTH CENTRAL EXPRESSWAY, SUITE 1000 DALLAS, TEXAS 75206 PHONE: (972) 235 -3031 FAX: (972) 235 -9544 1_0 3, BLOC A DUKE LESLEY ADDITION P RT OF TRAC DUKE REAL LIMITED P (INST. 4- 200 (fit -tD: 08/1V .879 ACRE ,407 10 BUII DING SETBACK PER 0 061NG) CbN TRAC TC COORDINATE MPH OWNER ON SIGN S 27'53'59" 59.99' _r CDNCRE TF PAVEMENT TOR TE ICH ON SIGN TO UTILITY EASEMENT (INS T NO 200700 13' TP &L EASEMENT (VOL 85056, PG 3358) P%' W/G ,PP A /GuY VERIZO6 EASEMENT (INST NO 20070400538) 3 /4-N�O O$ P UV 4 .1 PP 5' VERIr U* F (INS*. NO 2008 BRICK PAVE STONE 75 EIRL WNE UTILITY EAS. ENT (INST_ NO 700 0342309) TO. 301 E AStM1NE (INST NO 700200 94+79) Sf AC S PROPOSED PROPOSED 15' UTILITY EASEMENT 30' BUILDING SETBACK N 89 °25'40" E 170.75' BOLLARD ELECTRIC METER POWER POLE UGHT STANDARD WATER METER WATER VALVE IRRIGATION CONTROL VALVE FIRE HYDRANT CLEANOUT MANHOLE TRAFFIC SIGNAL CONTROL TRAFFIC SIGNAL POLE LOT 1, BLOCK B OPPELL BUSINESS CENTER II (VOL 98008, PG. 11) TPAL EASEMENT (VOL 65056, PG. 7358) 1 TNERS 1442) 60' DRA.NAGE EASEMENT (VOL. 98008. P, 11) CB =S 72'36'35" W CD= 180.57' TEE ak FP !1011 IRS (C.M.) SACK BUILDING TO BUILDING LINE PARKING SE 1BACK (VOL. 98008. PG. I ZONED "PD- 221 -HC" PROPOSED wO/ GRADING ARIAS E DRAINAGE EASEMENT PART OF TRACT 1 DUKE REALTY UNITED PARTNERSHIP (INST. NO. 200600301442) PARKING SPACES PROVIDED REVISIONS TO EXISTING SITE PLAN 20' UNDERGROUND EASEMENT (VOL_ 98008. 0 5 I) TELEPHONE BOX FLOOD UGHT FLAG POLE TRAFFIC SIGN 1/2 -INCH IRON ROD WPPACHECO KOCH" CAP SET CONTROLLING MONUMENT PROPERTY UNE FENCE OVERHEAD UTIUTY UNE 3. BUILDING HEIGHT: 45-0" 6. NUMBER OF EMPLOYEES: PROJECTED TOTAL= TBD 8. ZONING: EXISTING: PD- 22R2 -LI PROPOSED: PD- 222R3 -LI* 10. ZONING: PROPOSED PD- 222R4 -LI* 30 60 120 GRAPHIC SCALE IN FEET (PROJECT LOCATION) SITE DATA INFORMATION PROPOSED USE: GENERAL WAREHOUSE BUILDING (PD- 222R3 -LI) PARKING LOT (PD- 222R4 -LI) 2. BUILDING AREA: SAMSUNG WAREHOUSE= 230,025 OFFICE= 31,000 HEMISPHERES WAREHOUSE= 353,986 S.F. OFFICE= 11,564 S.F. VACANT AREA WAREHOUSE= 125,000 S.F. OFFICE =5,000 S.F. TOTAL WHAREHOUSE= 709,011 S.F. TOTAL OFFICE= 47,564 S.F. TOTAL BUILDING 756,575 S.F. 4. PARKING REQUIRED: WAREHOUSE 709,011/5000 142 SPACES OFFICE 47,564/300 159 SPACES TOTAL 142 159 301 5. PARKING PROVIDED: ORIGINAL PROVIDED ADDED SPACES TOTAL PROVIDED (PD -222R3 TOTAL PROVIDED (PD- 222R4- 7. SITE COVERAGE (PD- 222R3 -LI): TOTAL SITE 1,575,695 S.F. BUILDING 756,575 S.F. PAVEMENT 587,537 S.F. FOOTPRINT S.F. 756,575 S.F. FLOOR TO AREA RATIO 48% BUILDING COVERAGE 48% PAVEMENT COVERAGE 37% 426 SPACES 38 SPACES -LI) 464 SPACES (INCLUDING 22 H.C.) LI) 253 SPACES (39.052 AC.) (17.34 AC.) (13.49 AC.) (17.34 AC.) *PD CONDITIONS: (a) PROVIDED 5.0 ft OF LANDSCAPE BUFFER ALONG EASTERN BOUNDARY IN LIEU OF 10.0 ft. (b) SIGN VARIANCE AS ALLOWED BY ORDINANCE 91500 -A -462. (C)PARKING RATIO AND LANDSCAPE SETBACK AS ALLOWED BY ORDINANCE 91500 -A -462. 9. SITE COVERAGE (PD- 222R4 -LI): TOTAL SITE 125,407 S.F. (2.879 AC.) PAVEMENT 85,648 S.F. 1, 6C I I PAVEMENT COVERAGE 68% MAR 3 1 ?U1U C I C1' NIrJE_. '4 ZON 11. TOTAL COMPACTORS: 4 COMPACTORS (2- YARD) 2 COMPACTORS NORTH, 2 COMPACTORS SOUTH *PD CONDITIONS (a) PROVIDED 7.5 ft. LANDSCAPE BUFFER ALONG WESTERN BOUNDARY IN LIEU OF 1 N 11 -A $ED PACK CB RICHARD ELLIS ARCHITECTS 4121 Commerce St. Ste. 1 Dallas, Texas 75226 P 214.824.7040 F 214.887.0559 03/29/10 W 2 O y Q