Loading...
Landscape PlanCertified B Drawing Number: Duke Job Number: .15.11 0 LL 0 r J 0 7 FPNOO8-OO1 I 5 limit of lawair EXISTING 20'X20' UTILITY EASEMENT (VOL. 2002125, PG. 0070) 5' limit of Iawn relpair New dawn, solid sod er udagrass typ. for new R, ids (3) Cedar Elm, 3" cal. (1) ea. per three new islands EXISTING 10' UTILITY EASEMENT r (VOL. 2002125, PG. 0070) I mitit 0 (7) Transplant Live Oak New Lawn, solid sod ermudagrass typ. for new islands 7 LANDSCAPE PLAN 01 SCALE: 1"=40'-0" 20 40 80 By z 4) Transplant Live Oak RECEIVED JUL 2 9 ?O11 PLANNING DEPARTMENT Administrative approval smr landscape architects, inc. 1708 N. Griffin Street Dallas, Texas 75202 Tel 214.871.0083 Fax 214.871.0545 Email smr @smr- ta.com Required (18) trees 30" ht. screen Required 5,170 s.f. (10 (13) trees OPEN SPACE Required 53,461 s.f. (15 (22) trees SUMMARY Total trees required: Total trees provided: Total site area: 1 Lgiir lav /L AIL �r �r ■qpnvin l r Ank Ir el Perimeter Landscape 28,354 s.f. (less drives) Parking Lot: 33,875 s.t. QUANTITY PLANT TYPE (11) EX. LIVE OAK TO BE RELOCATED (9) EX. MEXICAN PLUM TO BE REMOVED 02 EXISTING TREE TRANSPLANT PLAN SCALE: 1" 40' -0" TRANSPLANT NOTES 1. Trees shall have ten (10 inches of rootball width for every one (1") inch caliper of tree. 2. Trees shall have one fourth (1/4) the height of the tree in rootball depth. 3. Trees shall be dug either by hand or by the use of a tree spade. Tree spade shall be a minimum of 60 4. Contractor shall be responsible for maintaining all transplanted trees in the event they are unable to replant them immediately after digging. Contractor shall coordinate with other trades such that digging and replanting can occur simultaneously. 5. In the event transplanted trees have to be held on site, it shall be the responsibility of the Contractor to maintain the trees in a healthy and growing condition. 6. The following list shall be used as guidelines only for holding of trees on site: a. Trees shall be set on grade with the rootball completely covered with compost and mulch. No rootball shall be exposed. b. Trees shall be wired and staked such that they will not blow over. c. Trees shall be watered daily by hand or a temporary drip/trickle irrigation system installed. 7. Replanting trees shall follow the same planting techniques as outlined in the Landscape Specifications, 8. Live Oak to be pruned by 1/4 prior to transplanting. IRRIGATION REPAIR SPECIFICATIONS 1. Contractor shall perform site visit prior to bidding and construction. to review extent of existing irrigation system. 2. Contractor shall be responsible for verifying conditions of existing irrigation system. Contractor shall be responsible for maintaining the integrity of existing irrigation where possible, and if not, repair as needed, including but not limited to irrigation controller. meter, sleeving, etc. LANDSCAPE TABULATIONS PERIMETER LANDSCAPE Requirements: Street Frontage shall contain a 15' landscape buffer with one (1) tree per 50 I.f. and 30" ht. parking lot screen: hedge or berm. Perimeter landscape areas shall contain a 10' landscape buffer along property lines with one (1) tree per 50 I.f. Freeport Parkway: (908 I.f.) 13,620.0 s.f. Provided (18) trees 36' ht. berm West Property Line: (791 I.f.) 7,910.0 s.f. Required Provided (16) trees (19) trees North Property line: (284 I.f.) 2,840.0 s.f. Required Provided (6) trees (6) trees South Property Line: (832 I.f.) 8,320.0 s.f. Required Provided (17) trees (20) trees (11) ornamentals INTERIOR LANDSCAPE Requirements: 10% of gross park ng area to be landscape. One (1) tree per400 s.f. of required landscape area. Provided 5,170 s.f. (10 (13) trees Requirements: 15% of lot not covered by buildings to be landscape open space. One (1) tree per 2500 s.f. of open space. TOTAL LOT AREA (Exclusive of building): 356,404 s.f. Provided 165,587 s.f. (18.4 94,965 s.f. less expansion (70,065 s.f.) (48) trees (92) trees (123) trees (22) ornamental trees 515,628 s.f. Total landscape provided: 196,966 s.f. (38% of total site) EXISTING PLANT LEGEND SYMBOL PLANT TYPE AP Austrian Pine BC Bald Cypress CE Cedar Elm CP Chinese Pistache ERC Eastern Red Cedar ERC2 Eastern Red Cedar LO Live Oak MP Mexican Plum SC Seasonal Color QUANTITY PLANT TYPE Plant identifed with callout box are all existing plants Hal LAWN REPAIR NOTES 1. All lawn areas damaged during construction to be repaired with solid sod and raked free of debris. 2. Adjust damaged areas to achieve positive drainage away from buildings. Provide uniform rounding at top and bottom of slopes and other breaks in grade. Correct irregularities and areas where water may stand. 3. All areas to be repaired must be planted by hand to cover area completely. insure edges of sod are touching. Top dress joints by hand with compost to fill voids. 4. Roll repaired areas to achieve a smooth, even surface, free from unnatural undulations. LANDSCAPE NOTES 1. Contractor shall verify all existing and proposed site elements and notify Architect of any discrepancies. Survey data of existing conditions was supplied by others. 2. Contractor shall locate all existing underground utilities and notify Architect of any conflicts. Contractor shall exercise caution when working in the vicinity of underground utilities. 3. Contractor is responsible for obtaining all required landscape and irrigation permits. 4. Contractor to provide a minimum 2% slope away from all structures. 5. All planting beds and lawn areas to be separated by steel edging. No steel to be installed adjacent to sidewalks or curbs. 6. All landscape areas to be 100% irrigated with an underground automatic irrigation system and shall include rain and freeze sensors. 7. All lawn areas to be Solid Sod Bermudagrass, unless otherwise noted on the drawings. DEMOLITION NOTES 1 Provide demolition, salvage and protection of existing structures, surfaces and trees as shown on the drawings. 2. Before submitting proposal, visit and examine site to determine actual nature and scope of demolition and salvage work. Claims for extra compensation on account of additional labor materials or equipment required for difficulties encountered in demolition and salvage will not be recognized. 3. Prior to demo, disconnect and cap off utilities and service lines not required for new construction in accordance with requirements of governing authorities ordinances and regulations. 4. Erect necessary barricades, storing and protective measures as required. 5. Materials and debris resulting from demolition operations become the property of the Contractor. Please remove from site. 6. Remove pavements, and structures to the depths of their sub structure. 7. Leave construction area clean and ready to use by other trades. 8. Remove pavement sub -base to the depth of the base materials. 9. Do not remove or damage trees unless noted to be removed or transplanted.. 10. Prior to beginning demolition, Contractor shall provide coverings for existing site elements remaining to prevent damage. Any site elements scheduled to remain which are damaged by the Contractor's activities shall be required at the Contractor's expense. SOLID SOD NOTES 1. Fine grade areas to achieve final contours indicated. Leave areas to receive topsoil 3" below final desired grade in planting areas and 1" below final grade in turf areas. 2. Adjust contours to achieve positive drainage away from buildings. Provide uniform rounding at top and bottom of slopes and other breaks in grade. Correct irregularities and areas where water may stand. 3. All lawn areas to receive solid sod shall be left in a maximum of 1" below final finish grade. Contractor to coordinate operations with on -site Construction Manager. 4. Contractor to coordinate with on -site Construction Manager for availability of existing topsoil. 5. Plant sod by hand to cover indicated area completely. Insure edges of sod are touching. Top dress joints by hand with topsoil to fill voids. 6. Roll grass areas to achieve a smooth, even surface, free from unnatural undulations. 7. Water sod thoroughly as sod operation progresses. 8. Contractor shall maintain all lawn areas until final acceptance. This shall include, but not limited to: mowing, watering, weeding, cultivating, cleaning and replacing dead or bare areas to keep plants in a vigorous, healthy condition. 9. Contractor shall guarantee establishment of an acceptable turf area and shall provide replacement from local supply if necessary. 10. If installation occurs between September 1 and March 1, all sod areas to be over seeded with Winter Ryegrass, at a rate of (4) pounds per one thousand (1000) square feet. Duke REALTY CORPORATION 5495 Belt Line Road Suite 360 Dallas, TX 75254 Phone: (972) 361 -6700 Fax: (972) 361 -6800 Z i A/E Job Number: 2052-02.051 RText (RText)