Loading...
Landscape PlanEXISTING IVE OAK EMAIN (1) CEDAR ELM TO BE TR 'ANSPLANTED TO THIS LO' ATION (3) LIVE WS TO BE TRANSPLANTED TO THIS LOCATIONS (3) EXISITN4 CEDAR ELM T• BE REMAIN r Z: 00 LOT 1R, BLOCK C LAKE 635 BUSINESS PARK OL. 2000167, PG. 425) i J i C56 1 LOT 2R, BLOCK B NORTHLAKE 635 BUSINESS PARK ADDITION (INST. #200600463652) (2) CEDAR ELM TREES TO BE TRANSPLANTED TO THIS LOCATION EXISTING CEDAR ELM TO REMAIN 4' Fl E i L u 7 LOT 1, BLOCK B NORTHLAKE 635 BUSINESS PARK (VOL. 98008, PG. 11) r LANDSCAPE TABULATIONS PERIMETER LANDSCAPE Requirements: 10' Landscape buffer required along all property lines, 15' Landscape buffer required along street frontages. (1) Tree per 50 I.f. of frontage, 30" ht. parking lot screen: hedge or berm. Perimter landscape areas shall contain at least one (1) tree for each Fifty (50) linear feet or fraction thereof of perimeter landscape area. Lakeshore Drive: (693 I.f.) Required (14) Trees East Property Line: (560 I.f.) Required (12) Trees PLANT LIST TREES TYPE CE CM LE LO SHRUBS TYPE NP COMMON NAME Cedar Elm Crepe Myrtle- red Lacebark Elm Live Oak COMMON NAME Needle Point Holly COPPELL NOTES Provided (12) Existing transplanted Trees (4) Proposed Trees Provided (1) Existing Tree (14) Proposed Trees BOTANICAL NAME U/mus Crassifolia Lagerstroemia indica 'Red' U/mus parvifofia Quercus virginiana BOTANICAL NAME Ilex cornuta 'Needle Point' LANDSCAPE NOTES 1. Contractor shall verify all existing and proposed site elements and notify Architect of any discrepancies. Survey data of existing conditions was supplied by others. 2. Contractor shall locate all existing underground utilities and notify Architect of any conflicts. Contractor shall exercise caution when working in the vicinity of underground utilities. 3. Contractor is responsible for obtaining all required landscape and irrigation permits. 4. Contractor to provide a minimum 2% slope away from all structures. 5. All planting beds and lawn areas to be separated by steel edging. No steel to be installed adjacent to sidewalks or curbs. 6. All landscape areas to be 100% irrigated with an underground automatic irrigation system and shall include rain and freeze sensors. 7. All lawn areas to be Solid Sod Bermudagrass, unless otherwise noted on the drawings. MAINTENANCE NOTES 1. The Owner, tenant and their agent, if any, shall be jointly and severally responsible for the maintenance of all landscape. 2. All landscape shall be maintained in a neat and orderly manner at all times. This shall include mowing, edging, pruning, fertilizing, watering, weeding and other such activities common to landscape maintenance. 3. All landscape areas shall be kept free of trash, litter, weeds and other such material or plants not part of this plan. 4. All plant material shall be maintained in a healthy and growing condition as is appropriate for the season of the year. 5. All plant material which dies shall be replaced with plant material of equal or better value. 6. Contractor shall provide separate bid proposal for one year's maintenance to begin after final acceptance. 1. Irrigation controller shall include a surge protection device, freeze detector and rain sensor. Landscape plans shall be signed and sealed by a licensed Landscape Architect. 3. Irrigation plans shall be signed and sealed by a licensed Irrigation Designer. 4. Irrigation meter will require assessment by the City of Coppell Water Utilities. 5, All landscape areas to be 100% irrigated with an automatic underground irrigation system. INTERIOR LANDSCAPE Requirements: 10% of gross parking area to be landscape (1) tree per 400 s.f. of required landscape area. Parking Lot: 127,050 s.f. Required 12,705 s.f. (10 (32) Trees SUMMARY Total trees required: Total trees existing: Proposed 4" caliper trees: Provided 16,555 s.f. 9,150 s.f. provided in new parking area. 6,070 s.f. of extra space from 03.08.1999 plan 1,335 s.f of extra space from 06.27.2002 plan (41) Trees on site 175 trees 183 trees 18 trees ALL PLANT MATERIAL SHOWN ON THIS PLAN IS EXISTING QTY. SIZE REMARKS 14 3" cal. 6 8' ht. 19 3" cal, 31 3" cal. QTY. SIZE REMARKS container grown, 14' ht., 5' spread min., straight trunk container grown, 8' ht., 5' spread min., 3 -5 trunks container grown, 14' ht., 5' spread min., straight trunk B&B, 14' ht., 5' spread min., straight trunk 295 30" ht. container grown, 30" ht., 24" spread, 24" o.c. GENERAL LAWN NOTES 1. Fine grade areas to achieve final contours indicated on civil plans. 2. Adjust contours to achieve positive drainage away from buildings. Provide uniform rounding at top and bottom of slopes and other breaks in grade. Correct irregularities and areas where water may stand. 3. All lawn areas to receive solid sod shall be left in a maximum of 1" below final finish grade. Contractor to coordinate operations with on -site Construction Manager. Imported topsoil shall be natural, friable soil from the region, known as bottom and soil, free from lumps, clay, toxic substances, roots, debris, vegetation, stones, containing no salt and black to brown in color. All lawn areas to be fine graded, irrigation trenches completely settled, and finish grade approved by the Owner's Construction Manager or Architect prior to installation. 6. All rocks 3/4" diameter and larger, dirt clods, sticks, concrete spoils, etc. shall be removed prior to placing topsoil and any lawn installation 7 Contractor shall provide (2 two inches of imported topsoil on all areas to receive lawn. Provide bid number as an ADD ALTERNATE. SOLID SOD NOTES 1. Fine grade areas to achieve final contours indicated. Leave areas to receive topsoil 3" below final desired grade in planting areas and 1" below final grade in turf areas. 2. Adjust contours to achieve positive drainage away from buildings. Provide uniform rounding at top and bottom of slopes and other breaks in grade. Correct irregularities and areas where water may stand. 3. All lawn areas to receive solid sod shall be left in a maximum of 1" below final finish grade. Contractor to coordinate operations with on -site Construction Manager. 4. Contractor to coordinate with on -site Construction Manager for availability of existing topsoil. 5. Plant sod by hand to cover indicated area completely. Insure edges of sod are touching. Top dress joints by hand with topsoil to fill voids. 6. Roll grass areas to achieve a smooth, even surface, free from unnatural undulations. 7. Water sod thoroughly as sod operation progresses. 8. Contractor shall maintain all lawn areas until final acceptance. This shall include, but not limited to: mowing, watering, weeding, cultivating, cleaning and replacing dead or bare areas to keep plants in a vigorous, healthy condition. 9. Contractor shall guarantee establishment of an acceptable turf area and shall provide replacement from local supply if necessary. 10. If installation occurs between September 1 and March 1, all sod areas to be over seeded with Winter Ryegrass, at a rate of (4) pounds per one thousand (1000) square feet. 06.02.2011 r/ 4 t' COWBOY LAKESHORE W z J CD DALLAS COUNTY MAPSCO 11AJ DES /GN CT VICINITY MAP (NOT TO SCALE) LANDSCAPE PLAN 0 I SCALE: 1" 40' -0" PK FILE: 1568 11.124 20 ct c; 40 AT F- F ,I TO k.2 60)/ 80 LANDSCAPE PLAN LOT 1R1, BLOCK D smr landscape architects, inc. 1708 N. Griffin Street Dallas, Texas 75202 Tel 214.871.0083 Fax 214.871.0545 Lak ?il ,smr @smr -ta. NY NO. DATE REVISION LU J4 Pacheco Koch Consultin g Engineers ineers 8350 N. CENTRAL EXPWY. SUITE 1000 TX REG. ENGINEERING FIRM F -469 V DALLAS, TX 75206 972.235.3031 TX REG. SURVEYING FIRM LS- 100080 -00 COPPELL COMMERCE CENTER NORTHLAKE 635 BUSINESS PARK C /TYOFCOPRELL, DALLAS, COUNTY, TEXAS NO. L12 z Lu 0 LU 0 cc W z z V