Loading...
850531(SUP)-NR 850723 Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 NOTICE OF PUBLIC HEARING BEFORE THE CITY COUNCIL OF THE CITY OF COPPELL The City Council of the City of Coppell will hold a public hearing at 7:30 p.m. on the 23rd day of July, 1985 at the Coppell High School Administration Building on the application of Daybridge Learning Centers, Inc., for approval of a zoning change from "MF-2" Multi-Family to "MF-2" Multi-Family with a Specific Use Permit (SUP) to build a day care center nursery. Location: Southwest corner of Parkway Boulevard and Samuel Boulevard Ail interested citizens of the City and other parties of interest are invited to attend this public hearing and participate in the same. Any citizen of the City or other party of interest may also express his or her opinion concerning the proposed zoning change request by letter addressed to the Coppell Planning and Zoning Commission, City Hall, P.O. Box 478, Coppell, Texas 75019 Date: 6-13-85 Rev. No: 0 DEVELOPMENT IMPACT ANALYSIS Daybridge Day Care Center A. General 1. Development Name and size: Daybridge Day Care Center 2. Owner: 3. Engineer: 4. Current zoning: 5. Current status of development: 6. Location: 7. Proposed density: 8. Annexation or land study required: 9. Issues resolved: 10. Issues to be resolved: 11. Dedications required: B. Impact 1. Traffic: a. Off-site collector streets: b. Off-site arterial streets: 2. Sewer: a. Proposed mains: b. Proposed connections to existing mains: 3. Water: 4. Drainage or Flow: 5. Schools: a. Primary school: b. Middle school: C. Approvals and Fees 1. Fees: Fees Required Item (when required) P~id to date -2~'Preliminary Plat $ 104 ~~. ~- ~,!~',~ 2. Assessments and Pro Rata Charges: a. Item: Summary: b. Item: Summary: 3. Approvals a. Annexation b. Land study: P&Z, City Council c. Zoning: P&Z, City Council d. Preliminary Plat: City Engineer: Planning & Zoning: City Council: e. Final Plat City Manager: City Engineer: Planning & Zoning: City Council f. Construction Plans: City Manager: City EnGineer: g. File approved plat: h. Letter of acceptance: i. Receive as-builts: j. End of warranty period: __