Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Elevations
^"'ED METAL LOUVER PAINT COLOR SELECTION: COLOR 1: SHERWIN WILLIAMS - SW 7044 Amazing Gray (Metal Canopy) COLOR 2: SHERWIN WILLIAMS - SW 7036 Accessible Beige (Wall Panels) MATERIALS SELECTION: MODULAR MASONRY: ARRISCRAFT STONE - MONTECITO SMOOTH, RS1158, 4 X 12 X 24 NOMINAL MODULAR BRICK: HANSON BRICK COMPANY - V240 VELOUR MODULAR STONE: QUALITY STONE QUARRY, FIELD HOUSE BLEND, 4 -10 X RANDOM LENGTH. ALUMINUM FRAMES: CLEAR ANODIZED [Ell 2' -0" L 2' -0" �1" 5' -10" �, 2' -0" �, 2' -0" �, � 1 ALUMINUM LOGO SIGN. 9" PIN MOUNT ALUMINUM ADDRESS NUMERALS. PAINTED METAL TUBE 5 COURSE MODULAR MASONRY UNIT STACKED BOND AUSTIN STONE TO MATCH BUILDING. ELEVATION 08 TWO SIDED MONUMENT SIGN Scale: 1/4" = V -0" 15 EAST ELEVATION Scale: 1/16" = 1' -0" ALUMINUM STOP PAINTS TILTWALL TEXTUE PAINTED OVE PAINTED S -ED CONCRETE VALL PANELS WITH URED TOPCOAT jk T.O. _.PARAPET 136' - -0" FED OVERHEAD DOOR FED STEEL CANOPY 10 NORTH ELEVATION Scale: 1/16" = 1' -0" �SIGNAGE AREA 200 S.F. MAX 06 SOUTH ELEVATION Scale: 1/16" = 1' -0" IINUM CURTAINWALL IE AND BRICK :ER FED CONCRETE VALL PANELS WITH URED TOPCOAT FED OVERHEAD DOOR A B.O. CANOPY X114' -2" F.F.E. 100' -0" dh T.O. PARAPET IJ 136' -0" 2ND FINISH FLR 115-0" B.O. CANOPY 114' -2" F.F.E. 100' -0" T.O. PARAPET 136' -0" FED STEEL CANOPY 2ND FINISH FLR 115' -0" B.O. CANOPY 114' -2" "`\GE AREA 200 S.F. MAX 03 WEST ELEVATION Scale: 1/16" = 1' -0" 'ED CONCRETE JALL PANELS WITH URED TOPCOAT IE AND BRICK .ER JLAR MASONRY UNIT IINUM CURTAINWALL FED STEEL CANOPY jh T.O. PARAPET 136' -0" 2ND FINISH FLR 115' -0" rj B.O. CANOPY 114' -2" F.F.E. 100' -0" y "ro . o T FLE-7-1 t( L� 1-- W J U • Cn 0 W rr (1) L U L U L CU 9660 Audelia Road Suite 123 -66 Dallas, Texas 75238 214.261.9060 (n O c� � U � � � U 0 C: CZ � o � U D O LO I*- X 0 CL cL 0 U oft 4) .> L 0 i 0 V w 00 EVISED �f I_ my OF COPPELL ILAIIIINING & ZONING DEPARTME" SHEET CONTENTS: BUILDING ELEVATIONS DATE: November 6, 2012 SHEET: A7000 © COPYRIGHT 2012 AZIMUTH: ARCHITECTURE, INC. 18013 1 10.15.12 DRC Submittal 2 11.01.12 DRC Meeting 3 11.06.12 P &Z Submittal 4 5 6 7 8 9 EVISED �f I_ my OF COPPELL ILAIIIINING & ZONING DEPARTME" SHEET CONTENTS: BUILDING ELEVATIONS DATE: November 6, 2012 SHEET: A7000 © COPYRIGHT 2012 AZIMUTH: ARCHITECTURE, INC.