SP ADM APP 09171350.00' N 550 174" E
5'XE; F-
UTILITY --
NEW
PAVING
STARTS
HERE
NEW
•TREE
WELL
-------- ---
NO ST F
IFING TO 5E
EXISTING
ISLAND
L
DON
= IN REAR
PAR
JNr, AREA
r-----------
COVERED
LANDING RAMP BACK
SLOPE 112 PORCH
D
I,561 SQ. FT. SINGLE
STORY BUILDING
LOT -3R
5LOCK-C,
11 IREFEF'To G'VL
Ng'
FOR ALL GRAD Nr,
IAND SLAB 4 PAVING HEIGHTS. I
COVERED
PORCH
W
(L
Qo
50.00' 5 a,5012-l" W
-NEW PAVING
51TE FLAN
5GALE: I" = 10'
NEW
TREE WELL
GAS
ELEC
Iw
HOUSTON ST
51TE DT,4 TABLE LOT -3R BLK -G
EXISTING ZONING - rF-)-250 -H
PROPOSED ZONING - f=>D-2508e-H
f=ROp05EjD USE- OFFICE OR RETAIL
AREA OF pROPO&F-D USE- 0,101 AGRE5
BUILDING AREA:
A/C SPACE - 1,39150. FT.
FRONT FORCH -112 50. FT.
BACK PORCH - E,4 5Q. FT.
TOTAL BUILDING FOOTAGE 5Q. FT.
FLOOR AREA RATIO -155 -f 5F. / 43915F. =.3F;,
BUILDING HEIGHTS Ci O MAIN RIDGE OF 51,111-F-)IN60: 20'-(o 3/4"
REQUIRED PARKINS -1 05 / 300 = 5 SPACES
FROVIF-)EF-) PARKINS - SHARED PARKING + 3 5FAGE5
PROPOSED LOT COVERAGE - 35%
OWNER
MAIN ST. COPPELL LP.
4956 NORTH O"CONNOR ROAD
IRVING, TEXAS 75062
P: (214) 215-9400
ARCHITECT
BILL PECK
WILLIAM PECK AND ASSOCIATES, INC.
105 WEST MAIN ST.
LEWISVILLE, TX 750x7
P: (972) 221-1424
LANDSCAPE ARCHITECT
CAROL FELDMAN
FELDMAN DESIGN STUDIOS
P.O. BOX 832346
RICHARDSON, TEXAS 75083
T: (972) 980-1730
CIVIL ENGINEER
MIKE GLENN
GLENN ENGINEERING
105 DECKER COURT, SUITE 910
IRVING, TEXAS 75062
P: (972) 717-5151
F: (972) 717-2176
STRUCTURAL ENGINEER
HENKEL ENGINEERING, INC.
TERRY J. HENKLE
1203 CRESTSIDE DIVE SUITE 280
COPPELL, TEXAS 1,5019
972-745-3039
VICINITY PLAN
900000"
N.T.S.
LEGEND
EXISTING CITY LIGHT
POLE
411 1
141 OF
Administrative Approval,
BY-1 39 - 17. 13
Date
5'XE; F-
UTILITY --
NEW
PAVING
STARTS
HERE
NEW
•TREE
WELL
-------- ---
EXISTING
ISLAND
I,561 SQ. FT. SINGLE
STORY BUILDING
LOT -3R
5LOCK-C,
11 IREFEF'To G'VL
Ng'
FOR ALL GRAD Nr,
IAND SLAB 4 PAVING HEIGHTS. I
COVERED
PORCH
W
(L
Qo
50.00' 5 a,5012-l" W
-NEW PAVING
51TE FLAN
5GALE: I" = 10'
NEW
TREE WELL
GAS
ELEC
Iw
HOUSTON ST
51TE DT,4 TABLE LOT -3R BLK -G
EXISTING ZONING - rF-)-250 -H
PROPOSED ZONING - f=>D-2508e-H
f=ROp05EjD USE- OFFICE OR RETAIL
AREA OF pROPO&F-D USE- 0,101 AGRE5
BUILDING AREA:
A/C SPACE - 1,39150. FT.
FRONT FORCH -112 50. FT.
BACK PORCH - E,4 5Q. FT.
TOTAL BUILDING FOOTAGE 5Q. FT.
FLOOR AREA RATIO -155 -f 5F. / 43915F. =.3F;,
BUILDING HEIGHTS Ci O MAIN RIDGE OF 51,111-F-)IN60: 20'-(o 3/4"
REQUIRED PARKINS -1 05 / 300 = 5 SPACES
FROVIF-)EF-) PARKINS - SHARED PARKING + 3 5FAGE5
PROPOSED LOT COVERAGE - 35%
OWNER
MAIN ST. COPPELL LP.
4956 NORTH O"CONNOR ROAD
IRVING, TEXAS 75062
P: (214) 215-9400
ARCHITECT
BILL PECK
WILLIAM PECK AND ASSOCIATES, INC.
105 WEST MAIN ST.
LEWISVILLE, TX 750x7
P: (972) 221-1424
LANDSCAPE ARCHITECT
CAROL FELDMAN
FELDMAN DESIGN STUDIOS
P.O. BOX 832346
RICHARDSON, TEXAS 75083
T: (972) 980-1730
CIVIL ENGINEER
MIKE GLENN
GLENN ENGINEERING
105 DECKER COURT, SUITE 910
IRVING, TEXAS 75062
P: (972) 717-5151
F: (972) 717-2176
STRUCTURAL ENGINEER
HENKEL ENGINEERING, INC.
TERRY J. HENKLE
1203 CRESTSIDE DIVE SUITE 280
COPPELL, TEXAS 1,5019
972-745-3039
VICINITY PLAN
900000"
N.T.S.
LEGEND
EXISTING CITY LIGHT
POLE
411 1
141 OF
Administrative Approval,
BY-1 39 - 17. 13
Date
PLANT LISTS
PLANTING PLAN 0 81 16,
Scale: 1/8" = 1' lummumm6mmond
Jurisdiction of Project
REGULATORY AUTHORITIES:
CITY OF COPPELL PLANNING & ZONING
255 PARKWAY BLVD.
PO BOX 9478
COPPELL, TX 75019
972 304 -7092
TEXAS DEPARTMENT OF LICENSING AND REGULATION
ELIMINATION OF ARCHITECTURAL BARRIERS
E.O. THOMPSON STATE OFFICE BUILDING
920 COLORADO
AUSTIN, TEXAS 78701
(512) 463 -3211
(512) 475 -2886 (FAX)
Landscaping Reuirements
CITY OF COPPELL LANDSCAPE REQUIREMENTS
ARTICLE 34. LANDSCAPE REGULATIONS
SEC. 12 -34 -8 MIN REQUIREMENTS FOR OF), STREET PARKING AN VEHICULAR
USE AREAS
A. PROJECT IS EXEMPT BY MEETING EXEMPTION La. RESTRICTED ACCESS
SEC. 12 -34 -9 LANDSCAPING REQUIREMENTS FOR NON - VEHICULAR OPEN SPACE.
A. FEATURE LANDSCAPING
COTTAGE #9 - TOTAL LOT AREA MINUS BUILDING = 2822 SF
COTTAGE #9 FL REQUIRED - 423 SF PROVIDED - 424 SF
B. 15% OF FEATURE LANDSCAPING; IN FRONT YARD - PROVIDED
C. 2 TREES PER COTTAGE UNIT REQUIRED
2 TREES PER COTTAGE UNIT PROVIDED
D. NO EXISTING TREES ON SITE.
Irrigation Requirements
UNDERGROUND AUTOMATIC SPRINKLING SYSTEM PROVIDED.
SYSTEM DESIGNED AND INSTALLED ACCORDING TO TCEQ LAWS AND
REGULATIONS PROVIDING FOR 100% COVERAGE ON ALL LANDSCAPE AND TURF.
THE SYSTEM SHALL INCLUDE A FREEZE -RAIN SENSOR AND RPZ WITH
ENCLOSURE.
Site Location
Professionals Information
ARCHITECT
WILLIAM PECK & ASSOCIATES, INC.
LEWISVILLE, TEXAS
972.221.1424
LANDSCAPE ARCHITECT
CAROL FELDMAN
FELDMAN DESIGN STUDIOS
P.O. BOX 832346
RICHARDSON, TEXAS 75083
972.980.1730
Administrative Approval
By Date
O
Texas
i
Common Name
Botanical Name
O
Native
Sae
Qty
!Notes {
Belinda s Dreain Rose
Rosa spp.
Shrub
12 gal
2
Cedar Elm
LJlrrrtrs crussifrrliu _
Tree
Yes
..
65 gal
1
3" cal
-
Cor. eu sis
Coreopsis lanceolate 'Surr Ray'
_
Perennial
Yes
,1 gal
Edward Gouc.he Abelia
Abeltu grandiflora 'Edward Gouclher'
.._. ........ ....._....... ...
Shrug .....
'No
5 al
2
......... . ..
Fall Aster
=Aster oblongtfolius
Perennial
Yep
I dal
1
Germander
Teueriuin chanruediys
GrouncicoveNo
I gal
42
SL
Guff Muhly grass
Afuhlenbeqhq cu illurir
Gratis
YesS
.................
gal
5
Iris, Bearded
Iris,,errrraraicu
Perennial
No
11 gal 1
�
Iris, .L.A. (Louisiana)
Iris brevicaulis
Perennial
Yes
11 gal w
6
�
I iricipe, Big I3kaie
Lrrro re nzuscari 'Big Blue'
I ........................ .. ........... .
Groundc,ov No
_..
4" pots
232
Live Oak
Quercus virkinianu
Tree
Yes
65 gal
1
3" cal
Marie Daly Rose
Rosa sly).
Polyantha
No
2 gal -
5
Mealy Blue Safe
_..,_ ....
Salvtu farin cea
Perennial
Yes
11 gal
Mexican Pluin
Prunris mexicana
Small tree
. Yep
1 al
1
tier form - g` height
Possumhaw Holly
Ilex cleeidua
Small tree
' Yes
15 gal
1
Tree forn7 A 'min
Powis Castle Artemesia
4rteniissia arboresc:eus Powis Castle'
Perennial
No
I gal
l
Purple Cone Flower
,t~chauaceu purpureca
Perennial
Yes
1 gal
3
Rosemary
Rosinrarinusgffr'cinalis
Perennial
'No
13 gal
4
Salvia greggii 'red'
Salvia greggii
Perennial
IYes
' 1 gal
Savannah Holly
Ilex opaca x attenuata 'Savannah'
Stnall tree
; No
130 gal
l
2" cal. -tree icirin �
Texas Lantana
Lantana urticoides (horrida)-
Perennial
;Yes
? 1 gal
1
Trailing Lantana
#Lantana nionteridensis 'Trailinfz laveadar`
Perennial
No
11 gal
$
PLANT LISTS
PLANTING PLAN 0 81 16,
Scale: 1/8" = 1' lummumm6mmond
Jurisdiction of Project
REGULATORY AUTHORITIES:
CITY OF COPPELL PLANNING & ZONING
255 PARKWAY BLVD.
PO BOX 9478
COPPELL, TX 75019
972 304 -7092
TEXAS DEPARTMENT OF LICENSING AND REGULATION
ELIMINATION OF ARCHITECTURAL BARRIERS
E.O. THOMPSON STATE OFFICE BUILDING
920 COLORADO
AUSTIN, TEXAS 78701
(512) 463 -3211
(512) 475 -2886 (FAX)
Landscaping Reuirements
CITY OF COPPELL LANDSCAPE REQUIREMENTS
ARTICLE 34. LANDSCAPE REGULATIONS
SEC. 12 -34 -8 MIN REQUIREMENTS FOR OF), STREET PARKING AN VEHICULAR
USE AREAS
A. PROJECT IS EXEMPT BY MEETING EXEMPTION La. RESTRICTED ACCESS
SEC. 12 -34 -9 LANDSCAPING REQUIREMENTS FOR NON - VEHICULAR OPEN SPACE.
A. FEATURE LANDSCAPING
COTTAGE #9 - TOTAL LOT AREA MINUS BUILDING = 2822 SF
COTTAGE #9 FL REQUIRED - 423 SF PROVIDED - 424 SF
B. 15% OF FEATURE LANDSCAPING; IN FRONT YARD - PROVIDED
C. 2 TREES PER COTTAGE UNIT REQUIRED
2 TREES PER COTTAGE UNIT PROVIDED
D. NO EXISTING TREES ON SITE.
Irrigation Requirements
UNDERGROUND AUTOMATIC SPRINKLING SYSTEM PROVIDED.
SYSTEM DESIGNED AND INSTALLED ACCORDING TO TCEQ LAWS AND
REGULATIONS PROVIDING FOR 100% COVERAGE ON ALL LANDSCAPE AND TURF.
THE SYSTEM SHALL INCLUDE A FREEZE -RAIN SENSOR AND RPZ WITH
ENCLOSURE.
Site Location
Professionals Information
ARCHITECT
WILLIAM PECK & ASSOCIATES, INC.
LEWISVILLE, TEXAS
972.221.1424
LANDSCAPE ARCHITECT
CAROL FELDMAN
FELDMAN DESIGN STUDIOS
P.O. BOX 832346
RICHARDSON, TEXAS 75083
972.980.1730
Administrative Approval
By Date
W _
Q cV N c1l
Z
O
F- CL
U) Q Q
o °
� m m �
W
H V) Cn
— lL'
IsEeMMes
re
IdWdC FELDMAN
6 �1�t a
080 A
These u. ~ve
been prepay
under the super on
of Carol Feldman,
Registered Landscape
Architect #2080,
Licensed Irrigotor
#L10020245
Z
CL W
CL
UWWW
0 I— cn w
a
0 IL
�V U
SHEET NO.
L1.01
O
O
0
<
t
�O
c
O
o
S
0
4-
- �z
SL
SL
s
W _
Q cV N c1l
Z
O
F- CL
U) Q Q
o °
� m m �
W
H V) Cn
— lL'
IsEeMMes
re
IdWdC FELDMAN
6 �1�t a
080 A
These u. ~ve
been prepay
under the super on
of Carol Feldman,
Registered Landscape
Architect #2080,
Licensed Irrigotor
#L10020245
Z
CL W
CL
UWWW
0 I— cn w
a
0 IL
�V U
SHEET NO.
L1.01
36" 17PpTH pUAL PUPPO5F FOOT ANn
propucT5 U5A MOP L CV -M 3 -20 Op pQL
COIF
STS
C
Tft TKUNK
POOr PALL
N
I
W E
1
� _ 5
ROOT BARRIER DETAIL
1 Scale: 1/2 " =1'
1P STAPLp- T5 36 C 36") POP, A 3" CAL TKO
(51ZP A5 APPPOPFIAS POP TWP 51Z�)
WWW,11FF5TAPLFIN000, OP �OUIVALPNt A5
APPVO\ /Q) 6Y OWNPV.
NM: PI,ACF MK 5TAPI.P5
ON SOUTH ANP NOV 5117 5
Or poor BALL
NOTE: NO IT MOV& Of TIFF
5TAPL�5 F�QUIWV
SHOpT PPONG - 5PCUI�Yf7
INTO TO Poor PALL
i.ONG PPON6 - OUr51M i
POOr 13AU. ANP 5�CUIT I7
INTO UNP15TUn17 501L {
2 TREE STAPLE DETAIL
Scale: 1/2 " =1'
PLANT Sftr3 WITH TOP Of FOOT13A1
LFV�L WITH FX15TING (AM
POVm 5AUCPp WITH
�XI511NG TOP5c
)
PACKPILL WITH ORIGINAL 501L, V�
THOPOUCA LY TO WMOV� Alp PO(
5HEW & OVNAM�N & G�5 FLAWING b�1'AI�
NOT TO 5CAL�
UT FOPF5 AT TOP OF POOr6A-L NM: POP VOOr-C3OUNP PLANT5,
PLANT fWE WITH POOL FLAY LpVEL VF MOVE Top I/ 3 OF 6UPLAP LOO5FN FOOr5 AT OUTPp Pn
WITH PINI5 fl) CAMl ANP ALL WII:I ANP OTHM
NOWPIOPF6MANL MAtFIAL PLANT 5HpUl3 WITH TOP OF
POPM 5AUCpp WITH 4" FOO 13ALL LFVKL WITH
PXI5TING TOp501L 3" 5HwPpN9 MULCH PXISTING 6
POOr 5TAPL�, 5FE PLANVEW 17 f& XI511NG 6m�
PACKPILL WITH ORIGINAL 501L, WAtF
XI511NG 501E
THOPOUGI G Y TOMOVp AV POCKETS I I I -
2X C;OOr BALL WII7M
PFkFNNIAL FLAWNG t2rfAIL
TIME FI AMNG
NOT TO 5C&F
Nor TO 5c&L
' 5HMPPFP MULCH
�XI511NG 6MF
PLANT INT011LL�n
ANTI AM�Nnpn 501L
SECTION 02910 - ROOT BARRIER
PART 1 - GENERAL
A. DESCRIPTION
A. PROVIDE ROOT BARRIER TO PROTECT FUTURE ROOT GROWTH FROM
DAMAGING CONCRETE.
B_ APPROVALS
1. ALL 'APPROVED EQUAL' MATERIALS MUST BE APPROVED BY OWNER.
PART 2 - PRODUCTS
A. MATERIALS
1. ROOT BARRIER
1.1. CENTURY PRODUCTS USA MODEL CR -PE 3 -20 OR EQUIVALENT AS
APPROVED BY OWNER
PART 3 - EXECUTION
1.2, INSTALL ROOT BARRIER 1" BELOW CURB TOP AS PER MANUFACTURES
SPECIFICATIONS. ROOT BARRIER TO BE INSTALLED AT CONCRETE EDGE
NEXT TO ALL PUBLIC STREETS.
END OF SECTION 02910
MAY BE NECESSAR
OVER. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY TREES THAT
NEED STAKING FOR A PERIOD OF ONE YEAR,
5.DO NOT HANDLE ANY TREE BY ITS TRUNK. ANY TREE HANDLED IN SUCH
A MANNER SHOULD BE REJECTED,
F. WARRANTEE
1. UNCONDITIONALLY WARRANT ALL PLANTS FOR A PERIOD OF ONE (1) YEAR
AFTER THE DATE OF INSTALLATION INITIAL ACCEPTANCE. REPLACE
MATERIALS NOT IN VIGOROUS, THRIVING CONDITION AS SOON AS WEATHER
PERMITS AFTER NOTIFICATION BY OWNERS THAT THE PLANTS HAVE DIED
OR ARE OTHER WISE NOT ACCEPTABLE, GUARANTEE REPLACEMENT
PLANTS FOR ONE YEAR, STARTING FROM THE DATE REPLACEMENT IS
MADE.
2.WARRANTY EXCLUDES REPLACEMENT OF PLANTS BECAUSE OF INJURY BY
STORM, NATURAL DROUGHT, DROWNING, HAIL FOR FREEZING, IF
REASONABLE CARE WAS TAKEN TO ADEQUATELY PROTECT THE MATERIAL,
AND IN THE OPINION OF THE OWNER'S REPRESENTATIVE THAT THE
PROBLEM OCCURRED AFTER THE DATE OF INITIAL ACCEPTANCE.
PART 3 - EXECUTION
A. PREPARATION FOR PLANT MATERIAL INSTALLATION
1. EXAMINE THE SUB -GRADE UPON WHICH THE WORK IS TO BE
PERFORMED, VERIFY GRAD[` ELEVATIONS AND VERIFY THAT BEDS HAVE
BEEN LEFT LOW BY OTHER TRADES, OBSERVE THE CONDITIONS UNDER
WHICH THE WORK IS TO BE PERFORMED AND CONFIRM THAT
UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED PRIOR TO
PROCEEDING.
B. TIME OF PLANTING
1. CARE IS TO BE TAKEN SO THAT NO PLANTS SIT IN POTS IN THE
SUMMER HEAT FOR MORE THAN 1 HOUR. IF PLANTING DURING HOT
SEASONS (NOT PREFERRED) PLANTING IS TO BE DONE IN SMALL
SECTIONS WITH STOCKPILED PLANTS TO BE PROTECTED FROM THE
SUMMER HEAT (SHADE AREAS).
C. TREE PLANTING
1. STAKE LOCATIONS FOR TREES PRIOR TO DIGGING HOLES.
2. DIG PITS WITH ROUGH SIDES AND WHICH HAVE TAPERED WALLS, A
MINIMUM OF TWICE THE WIDTH OF THE TREE BALL. A PEDESTAL SHOULD
BE LEFT IN THE CENTER OF THE HOLE AND THE TREE BALL SET UPON
THAT PEDESTAL.
3. SET PLANTS IN THE CENTER OF THE HOLE AND ON THE PEDESTAL,
PLUM AND VERTICAL, AND AT SUCH A DEPTH THAT THE CROWN OF THE
TREE BALL WILL BE LEVEL_ WITH THE SURROUNDING GRADE.
4 PLANTS BE
HE CSURROUND RELATNSHI TO O ORE TH
TO E
PREVIOUS EXISTING GRADE OF SOIL.
5. BACKFILL WITH EXISTING TOPSOIL.
6. INSTALL TREE STAPLES AS PER MANUFACTURE SPECIFICATIONS ON THE
NORTH AND SOUTH SIDES OF ROOT BALL. THE LONGER SIDE OF THE
STAPLE TO BE ANCHORED) OUTSIDE OF THE ROOTBALL AND THE SHORT
SIDE OF THE STAPLE ANCHORED INTO THE ROOT BALL.
7, WATER IMMEDIATELY AFTER PLANTING.
8. COVER ALL TREE BALLS WITH A MINIMUM OF 3 OF SPECIFIED MULCH.
EXTEND MULCH OUT TO THE EDGE OF THE TREE PIT, BUT KEEP AWAY
FROM TRUNKS.
9. ALL EXCAVATED MATERIAL UNACCEPTABLE FOR REUSE SHALL BE
DISPOSED OF OFF SITE, OR AS DIRECTED BY THE OWNER.
D, SHRUBS TALL GRASSES AND PERENNIAL PLANTING.
1 REMOVE
SETTLEMENT, THERE CROWN OF THE BALL WILLSBEHAT THAT
FINISHED
GRADE.
2. GENTLY CUT OUTER ROOTS OF ANY ROOTBALLS THAT HAVE
POT -BOUND PRIOR TO INSTALLATION.
3. COVER PLANTING BEDS WITH A MINIMUM 3 LAYER OF SPECIFIED MULCH.
E. SOD PLANTING
1. LAY SOD IN AN ORDERLY MANNER TO COVER ALL BARE SOIL AREAS.
2. WATER ALL AREAS OF THE SOD UNTIL THOROUGHLY WET.
3. ROLL SOD WITH A SOD ROLLER AFTER 24 HOURS AFTER LAYING AND
WATERING SOD TO OBTAIN A UNIFORM, SMOOTH FINISH.
4. FILL JOINTS WITH COMPOST IF NECESSARY TO FORM A UNIFORM GRASS
LAYER.
5. KEEP SOD ADEQUATELY WATERED UNTIL SOD MAKES A FIRM
CONNECTION TO THE SOIL.
END OF SECTION 02915
COTTAGES #9 & #10 DETAILS
Administrofive Approvel,
By 4-Al- Date
5117./3
SECTION 02915 - LANDSCAPE PLANTING
SECTION 02910 - SOIL PREPARATION
PART 1 - GENERAL
PART 1 - GENERAL
A. DESCRIPTION
A. SPECIAL CONDITIONS
1. COMPLY WITH APPLICABLE FEDERAL, STATE, COUNTY AND LOCAL
1. PROVIDE COMPLETE GRADING AND SOIL PREPARATION, INCLUDING
REGULATIONS GOVERNING LANDSCAPE MATERIALS AND WORK.
AMENDMENTS, AS SPECIFIED HEREIN.
2.EMPLOY ONLY EXPERIENCE PERSONNEL FAMILIAR WITH REQUIRED WORK.
B. EXAMINATION
1. EXAMINE SITE TO VERIFY REQUIRED ROUGH GRADING HAS BEEN COMPLETED
PIROV�IDE ADEQUATE SUPERVISION IOPERIENCEQUALIFIED FORE OF SIMILAR IH
CORRECTLY PRIOR TO BED PREPARATION WORK.
EXAMINE SITE TO VERIFY THAT ALL INVASIVE PLANTS AND THEIR ROOTS
OF TREE, SHRUB AND GRASS MATERIALS. IF
2.
HAV[ BEEN REMOVED PRIOR TO BED REPARATION WORK.
3.DOMNOTXMAKELJBSTITUTIONS
REQUIRED MATERIAL IS NOT OBTAINABLE, SUBMIT PROOF OF
C. APPROVALS
1. ALL 'APPROVED EQUAL' MATERIALS MUST BE APPROVED BY LANDSCAPE
-AVAILABILITY OWNER'S
GENUS, REPRESENTATIV.
US, SPECIESANDEVARIETY OF TREES AND
ARCHITECT.
4.PROVIDEQUAN�(ITY,T
SHRUBS INDICATED AND SCHEDULED FOR LANDSCAPE WORK WHICH
COMPLY WITH APPLICABLE REQUIREMENTS OF ANSI Z60.1 AMERICAN
PART 2 - PRODUCTS
STANDARD FOR NURSERY STOCK , AND ANY APPLICABLE STATE AND
A. MATERIALS
FEDERAL LAWS CONCERNING DISEASE AND INSECT INFESTATION.
1. COMPOST:
1.1. COTTON BUR COMPOST
COMPOST, GARLAND, TX, OR,
B.REFERENCE STANDARDS
1. AMERICAN STANDARD FOR NURSERY STOCK, APPROVED NOV. 6, 1996 BY
1.2. SHALL BE SUPPLIED BY: GREENSENSE
CLEAR FORK MATERIALS, ALEDO, TX, OR APPROVED EQUAL.
AMERICAN NATIONAL STANDARDS INSTITUTE, INC.
OF NORTH CENTRAL TEXAS,
2. FERTILIZERS AND SUPPLEMENTS:
WITH A WATER SOLUBLE SLOW
2.SHINNERS & MAHLER'S, ILLUSTRATED FLORA
BOTANICAL RESEARCH INSTITUTE OF TEXAS (BRIT), FORT WQRTH, TEXAS,
21. A 6 -2 -4 GRANULAR FERTILIZER
RELEASE ORGANIC BASE SUCH AS GREENSENSE, OR SUSTANE. OR
1999
APPROVED EQUAL.
3.HORTUS THIRD, CORNELL UNIVERSITY, 1967.
3. MULCH
SHALL BE SHREDDED HARDWOOD MULCH, SHREDDED CEDAR MULCH,
C.PREPARATION
4.000RDINATION WITH BUILDING AND ENGINEERING PROJECT ACTIVITIES.
REGULAR AND
3.1,
SHREDDED NATIVE MULCH, OR APPROVED EQUAL.
5.COORDINATE THE WORK OF THIS SECTION WITH THAT OF
THE SITE.
EMERGENCY WATER UTILITY ACTIVITIES ON
PART 3 - EXECUTION
PREPARATION FOR SOD INSTALLATION
6.COORDINATION WITH IRRIGATION SYSTEM:
6.1. THE UNDERGROUND IRRIGATION SYSTEM MUST BE INSTALLED PRIOR TO
A. BED PREPARATION AND
COMMENCEMENT OF THE PLANTING OPERATIONS.
1. GENERAL
INSPECT ALL EXISTING CONDITIONS AND OTHER ITEMS OF WORK
6.2, THE IRRIGATION SYSTEM SHALL BE OPERATIONAL AT THE TIME THAT
1.1.
PREVIOUSLY COMPLETED. DO NOT PROCEED UNTIL DEFECTS ARE
PLANTING OPERATIONS COMMENCE.
THE IRRIGATION CONTRACTOR TO PREVENT
CORRECTED.
6.3. COORDINATE WORK WITH
1.2. INSPECT THAT ALL INVASIVE PLANTS AND THEIR ROOTS HAVE BEEN
DAMAGE TO THE IRRIGATION SYSTEM.
PROJECT SHALL BE NURSERY - GROWN,
REMOVED COMPLETELY.
D.ALL PLANT MATERIALS FOR THIS
1.3. ALL AREAS TO BE PREPARED WITH ORGANIC TECHNIQUES ONLY.
INCLUDING TREES,
CONTAINER GROWN PLANTS SHALL HAVE BEEN STEPPED -UP AS
2. SHRUB BEDS:
2.1. BREAK UP AND TILL EXISTING SOIL TO A DEPTH OF 6 INCHES,
1.
NECESSARY TO PREVENT ROOT GIRDLING.
BEEN IN THE CONTAINER FOR A
2.2. ADD A 3 INCH LAYER OF COMPOST TO THE BEDS,
COMPOST TOGETHER TO A TOTAL OVERALL
2.CONTAINER GROWN PLANTS SHALL HAVE
MINIMUM OF SIX (6) MONTHS PRIOR TO DELIVERY TO THE SITE TO ENSURE
MULCH 2.3. TILL EXISTING SOIL AND
DEPTH OF 8 INCHES.
ADEQUATE ROOT DEVELOPMENT.
2.4. RAKE OUT ROCKS AND CLODS AND FINE GRADE THE BEDS TO DRAIN IN
3.THE 'ROOT FLARE' OF ALL TREES AND SHRUBS SHALL NOT BE COVERED
APPROPRIATE DIRECTIONS.
TOP - DRESS BED WITH A 3 INCH LAYER OF MULCH AFTER PLANTING,
WITH SOIL.
E.THE FOLLOWING TREE CARE PROCEDURES SHALL BE ADHERED TO:
2.5.
3. SOD AND SEED AREAS
1. DO NOT MAKE FLUSH CUTS OR LEAVE STUBS WHEN PRUNING. LEAVE
3.1. LIGHTLY CULTIVATE COMPACTED SOIL AND RAKE THE SOIL SMOOTH.
THE BRANCH COLLAR INTACT.
3.2. ADD Y2 INCH COMPOST TO ALL AREAS.
IN APPROPRIATE DIRECTIONS.
2.DO NOT USE ANY TYPE OF PRUNING PAINT ON WOUNDS.
3.DO NOT USE ANY TYPE OF TREE WRAP, EXCEPT, TRUNKS MAY BE
3.3. FINE GRADE TO DRAIN
WRAPPED WITH BURLAP DURING PLANTING OPERATIONS ONLY.
END OF SECTION 02910
4.DO NOT STAKE OR GUY ANY TREES. IN SPECIAL CASES, TREE STAKING
Y TO PRESERVE A TREE THAT CONTINUES TO BLOW
5HEW & OVNAM�N & G�5 FLAWING b�1'AI�
NOT TO 5CAL�
UT FOPF5 AT TOP OF POOr6A-L NM: POP VOOr-C3OUNP PLANT5,
PLANT fWE WITH POOL FLAY LpVEL VF MOVE Top I/ 3 OF 6UPLAP LOO5FN FOOr5 AT OUTPp Pn
WITH PINI5 fl) CAMl ANP ALL WII:I ANP OTHM
NOWPIOPF6MANL MAtFIAL PLANT 5HpUl3 WITH TOP OF
POPM 5AUCpp WITH 4" FOO 13ALL LFVKL WITH
PXI5TING TOp501L 3" 5HwPpN9 MULCH PXISTING 6
POOr 5TAPL�, 5FE PLANVEW 17 f& XI511NG 6m�
PACKPILL WITH ORIGINAL 501L, WAtF
XI511NG 501E
THOPOUGI G Y TOMOVp AV POCKETS I I I -
2X C;OOr BALL WII7M
PFkFNNIAL FLAWNG t2rfAIL
TIME FI AMNG
NOT TO 5C&F
Nor TO 5c&L
' 5HMPPFP MULCH
�XI511NG 6MF
PLANT INT011LL�n
ANTI AM�Nnpn 501L
SECTION 02910 - ROOT BARRIER
PART 1 - GENERAL
A. DESCRIPTION
A. PROVIDE ROOT BARRIER TO PROTECT FUTURE ROOT GROWTH FROM
DAMAGING CONCRETE.
B_ APPROVALS
1. ALL 'APPROVED EQUAL' MATERIALS MUST BE APPROVED BY OWNER.
PART 2 - PRODUCTS
A. MATERIALS
1. ROOT BARRIER
1.1. CENTURY PRODUCTS USA MODEL CR -PE 3 -20 OR EQUIVALENT AS
APPROVED BY OWNER
PART 3 - EXECUTION
1.2, INSTALL ROOT BARRIER 1" BELOW CURB TOP AS PER MANUFACTURES
SPECIFICATIONS. ROOT BARRIER TO BE INSTALLED AT CONCRETE EDGE
NEXT TO ALL PUBLIC STREETS.
END OF SECTION 02910
MAY BE NECESSAR
OVER. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY TREES THAT
NEED STAKING FOR A PERIOD OF ONE YEAR,
5.DO NOT HANDLE ANY TREE BY ITS TRUNK. ANY TREE HANDLED IN SUCH
A MANNER SHOULD BE REJECTED,
F. WARRANTEE
1. UNCONDITIONALLY WARRANT ALL PLANTS FOR A PERIOD OF ONE (1) YEAR
AFTER THE DATE OF INSTALLATION INITIAL ACCEPTANCE. REPLACE
MATERIALS NOT IN VIGOROUS, THRIVING CONDITION AS SOON AS WEATHER
PERMITS AFTER NOTIFICATION BY OWNERS THAT THE PLANTS HAVE DIED
OR ARE OTHER WISE NOT ACCEPTABLE, GUARANTEE REPLACEMENT
PLANTS FOR ONE YEAR, STARTING FROM THE DATE REPLACEMENT IS
MADE.
2.WARRANTY EXCLUDES REPLACEMENT OF PLANTS BECAUSE OF INJURY BY
STORM, NATURAL DROUGHT, DROWNING, HAIL FOR FREEZING, IF
REASONABLE CARE WAS TAKEN TO ADEQUATELY PROTECT THE MATERIAL,
AND IN THE OPINION OF THE OWNER'S REPRESENTATIVE THAT THE
PROBLEM OCCURRED AFTER THE DATE OF INITIAL ACCEPTANCE.
PART 3 - EXECUTION
A. PREPARATION FOR PLANT MATERIAL INSTALLATION
1. EXAMINE THE SUB -GRADE UPON WHICH THE WORK IS TO BE
PERFORMED, VERIFY GRAD[` ELEVATIONS AND VERIFY THAT BEDS HAVE
BEEN LEFT LOW BY OTHER TRADES, OBSERVE THE CONDITIONS UNDER
WHICH THE WORK IS TO BE PERFORMED AND CONFIRM THAT
UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED PRIOR TO
PROCEEDING.
B. TIME OF PLANTING
1. CARE IS TO BE TAKEN SO THAT NO PLANTS SIT IN POTS IN THE
SUMMER HEAT FOR MORE THAN 1 HOUR. IF PLANTING DURING HOT
SEASONS (NOT PREFERRED) PLANTING IS TO BE DONE IN SMALL
SECTIONS WITH STOCKPILED PLANTS TO BE PROTECTED FROM THE
SUMMER HEAT (SHADE AREAS).
C. TREE PLANTING
1. STAKE LOCATIONS FOR TREES PRIOR TO DIGGING HOLES.
2. DIG PITS WITH ROUGH SIDES AND WHICH HAVE TAPERED WALLS, A
MINIMUM OF TWICE THE WIDTH OF THE TREE BALL. A PEDESTAL SHOULD
BE LEFT IN THE CENTER OF THE HOLE AND THE TREE BALL SET UPON
THAT PEDESTAL.
3. SET PLANTS IN THE CENTER OF THE HOLE AND ON THE PEDESTAL,
PLUM AND VERTICAL, AND AT SUCH A DEPTH THAT THE CROWN OF THE
TREE BALL WILL BE LEVEL_ WITH THE SURROUNDING GRADE.
4 PLANTS BE
HE CSURROUND RELATNSHI TO O ORE TH
TO E
PREVIOUS EXISTING GRADE OF SOIL.
5. BACKFILL WITH EXISTING TOPSOIL.
6. INSTALL TREE STAPLES AS PER MANUFACTURE SPECIFICATIONS ON THE
NORTH AND SOUTH SIDES OF ROOT BALL. THE LONGER SIDE OF THE
STAPLE TO BE ANCHORED) OUTSIDE OF THE ROOTBALL AND THE SHORT
SIDE OF THE STAPLE ANCHORED INTO THE ROOT BALL.
7, WATER IMMEDIATELY AFTER PLANTING.
8. COVER ALL TREE BALLS WITH A MINIMUM OF 3 OF SPECIFIED MULCH.
EXTEND MULCH OUT TO THE EDGE OF THE TREE PIT, BUT KEEP AWAY
FROM TRUNKS.
9. ALL EXCAVATED MATERIAL UNACCEPTABLE FOR REUSE SHALL BE
DISPOSED OF OFF SITE, OR AS DIRECTED BY THE OWNER.
D, SHRUBS TALL GRASSES AND PERENNIAL PLANTING.
1 REMOVE
SETTLEMENT, THERE CROWN OF THE BALL WILLSBEHAT THAT
FINISHED
GRADE.
2. GENTLY CUT OUTER ROOTS OF ANY ROOTBALLS THAT HAVE
POT -BOUND PRIOR TO INSTALLATION.
3. COVER PLANTING BEDS WITH A MINIMUM 3 LAYER OF SPECIFIED MULCH.
E. SOD PLANTING
1. LAY SOD IN AN ORDERLY MANNER TO COVER ALL BARE SOIL AREAS.
2. WATER ALL AREAS OF THE SOD UNTIL THOROUGHLY WET.
3. ROLL SOD WITH A SOD ROLLER AFTER 24 HOURS AFTER LAYING AND
WATERING SOD TO OBTAIN A UNIFORM, SMOOTH FINISH.
4. FILL JOINTS WITH COMPOST IF NECESSARY TO FORM A UNIFORM GRASS
LAYER.
5. KEEP SOD ADEQUATELY WATERED UNTIL SOD MAKES A FIRM
CONNECTION TO THE SOIL.
END OF SECTION 02915
COTTAGES #9 & #10 DETAILS
Administrofive Approvel,
By 4-Al- Date
5117./3
MATERIAL5 LEGEND
1) COMPOSITE SHINGLE ROOF
- CERTAINTEED INDEPENDENCE
- DRIFTWOOD
2) STANDINGS SEAM METAL ROOF
-24 GA. CONCEALED FASTENER
GALVALUME METAL ROOF
3) HARDIE STAGGERED EDGE NOTCHED PANEL SIDING
PAINT COLOR - 5W 2802 ROCKWOOD RED
4) 5/4 X SMOOTH HARDIE TRIM
PAINT COLOR: MATCH INTEGRITY WINDOW " STONE WHITE"
5) FASCIA 5OARD
- SMOOTH HARDIE 5/4 X (o TRIM 5OARD
-PAINT COLOR 5W"16-74 PEPPERCORN
(o) STONE
- RIMER ROCK
- OWNER TO APPROVE SAMPLE PRIOR TO ORDERING
MATERIAL
-i) CRAFTSMAN STYLE SQUARE TAPERED COLUMN
SEE SPEC ON SHEET A -101
- PAINT COLOR: MATCH INTEGRITY WINDOW "STONE WHITE"
8) 5RACKET5
- SEE DETAIL ON A -301
- PAINT COLOR: MATCH INTEGRIT'I' WINDOW " STONE WHITE"
9) DODRS
- PAINT COLOR: 5W"16-14 PEPPERCORN
10) AZEK COLUMN WRAP
- PAINT COLOR - MATCH INTEGRITY WINDOW "STONEWHITE"
11) WINDOWS
- INTEGRITY 5Y MARVIN - WOOD / ULTREX
- COLOR: STONE WHITE
12) LAP SIDING
- HARDIE PLANK SMOOTH LAP SIDING
-
125" WIDTH (c," EXPOSURE
- PAINT COLOR: SW 2802 ROCKWOOD RED
13) DENTIL MOLDING
-PAINT COLOR: MATCH INTEGRITY WINDOW " STONE WHITE"
-REF. DETAIL A102 /E
14) HALF ROUND GUTTER W1 ROUND DOWNPOUTS
DOLOR: GALVALUME
15) LATTICE PATTERN TRIM DETAIL
- PAINT COLOR: MATCH INTEGRITY WINDOW "STONE WHITE"
-REF. DETAIL A102 /F
(REF. GENERAL NOTES SHEET A -101 FOR MORE DETAILED
MATERIAL SPECS)
NORTH ELEVATION
SGdI__F• /4" _ _�
1
SOUTH ELEVATION
;..> ) 6--ALE-1/4" = ,_o„
0
WE&T ELEVATION
ldhinistrotiveApproval
6v__ -9 7 v3
pa..,
`y,��•r
W g •-4
y
••,
Of
9/11/13
a p o c m
U 28- LL W
(p C 2 w T= N O w
I-
a min a) c o 3 F nww
$, _c fl-�6a E
�a
�•` O V E O of W�:>
> O U p a p pW,• 0 W ix
� U p ca.E t5 }a), Y E W W (0 W
w CL
C 3 a) 'c: '� O` p o 5 = LU a�
c � W F-
°� v °-v 3.o.1
E—UX=
.w .T 6 3 0 ` 3 wgw0
€Ec�oa'�r Q ~ =w
C oQQ 0) Q.-0 U wmF-Q
°O -a °� 3 m °�O =U
U Of— 0 Ru)ELWF - =Z
L o o.o a)') °�� �OF-
ip 3 fn_C --' p c>inwZ� W
O- O % to a) L
r O W
V O O a)w to �O<Z
oc`ZpQU
Nom
B 0 0 a< 0 E U)zw(n
= 1--:s N < 2 U)
a) > a - a t-
w{- 3 0 E= 8 p cz(j> -Q
EZ o o c m�ZQY
c�
:o 0 3 p o o�dmU
0 " -0 Ow W
.- ca 0E -tea
0 cc a) .0
�) Q '� a) c oZU�SQ
3-Oa
v
0 0 f
a) 42) N d E N N N ,=o ZQ J
m w iE.0 F_ e0
m a
N U= - Na O-O Cn0ww .
0
u� a) •C a)
a-' �.- Z W
_ U
am0 a-
�W�'
�
c Q
0 U) ,n L
?
Ffl -
�O U) E W
d U -
r-__�°0 =Ec>' W
No0oa)ZOtF -�Wd
h�
� � H
� � U
[� O z
� � O
d.
�
N
e4
N
V1 �
W
W
a
REVISIONS
DATE
z
O
F-
Q
w
J
LU
O
ui
F-
X
Lu
ISSUE
DATE:
9/11/13 - FOR PERMIT
Scale: REr-. PLAITS
Drawn:
Job: MAIN STREET COFFELL
COTTAGE 09
Sheet Number:
A -201