Site Plan Views & Berm Section 091914(1) (1)
TRUE NORTH PLAN NORTH
OSITE PLAN V
1 801 Off
DEI
08/06/2013
Omerriman associates architects, inc. 2013
EWS
Oil
` ►` ��`
1► 1► �► 1►� 1►� N
SQUARE FOOTAGE TABLE
ELEVATION MATERIAL SQ. FT. PERCENTAGE
NORTH CONCRETE 11,267 S.F. 85.2%
STONE 1,464 S.F. 11.1%
GLAZING 490 S.F. 3.7%
TOTAL NEW SURFACE AREA 13,221 S.F.
SOUTH CONCRETE 11,267 S.F. 85.2%
STONE 1,464 S.F. 11.1%
GLAZING 490 S.F. 3.7%
TOTAL NEW SURFACE AREA 13,221 S.F.
EASTCONCRETE
20,115 S.F.
89.2%
_STONE
1,672 S.F.
7.4%
GLAZING
760 S.F.
3.4%
TOTAL NEW SURFACE AREA
22,547 S.F.
WEST
CONCRETE
209115 S.F.
89.2%
STONE
11672 S.F.
7.4%
GLAZING
760 S.F.
3.4%
TOTAL NEW SURFACE AREA
22,547 S.F.
HEIGHT OF ROLLING ---
TOP OF BERM
513'-0"
AVG LEVEL OF FUTURE
FREEPORT PARKWAY
ALONG LINE OF SIGHT
b ------ 500'-0"