Loading...
Site Plan Views & Berm Section 091914(1) (1) TRUE NORTH PLAN NORTH OSITE PLAN V 1 801 Off DEI 08/06/2013 Omerriman associates architects, inc. 2013 EWS Oil ` ►` ��` 1► 1► �► 1►� 1►� N SQUARE FOOTAGE TABLE ELEVATION MATERIAL SQ. FT. PERCENTAGE NORTH CONCRETE 11,267 S.F. 85.2% STONE 1,464 S.F. 11.1% GLAZING 490 S.F. 3.7% TOTAL NEW SURFACE AREA 13,221 S.F. SOUTH CONCRETE 11,267 S.F. 85.2% STONE 1,464 S.F. 11.1% GLAZING 490 S.F. 3.7% TOTAL NEW SURFACE AREA 13,221 S.F. EASTCONCRETE 20,115 S.F. 89.2% _STONE 1,672 S.F. 7.4% GLAZING 760 S.F. 3.4% TOTAL NEW SURFACE AREA 22,547 S.F. WEST CONCRETE 209115 S.F. 89.2% STONE 11672 S.F. 7.4% GLAZING 760 S.F. 3.4% TOTAL NEW SURFACE AREA 22,547 S.F. HEIGHT OF ROLLING --- TOP OF BERM 513'-0" AVG LEVEL OF FUTURE FREEPORT PARKWAY ALONG LINE OF SIGHT b ------ 500'-0"