Exterior Elevations (2 PGS)k1150�'-8"
V T.O. PARAPET
145'-0"
JOIST BRG.
HIGHEST ACCESSIBLE FLOOR - 36-0" 62
136'-0"
4TH FLOOR
T. 0. SH TG.
125'-0"
3RD FLOOF
T.O. SHTG.
114'-0"
2ND FLOOR
T.O. SHTG.
100'-0"
T.O. SLAB
FRONT ELEVATION
SCALE: 3/32" = 1'-0"
A 116_0'-1"
V T.O. CANOPYI-
jJ4�1_57'-0"
V T.O. PARAPET
as
EFT SIDE ELEVATION
CALE: 3/32" = 1'-0"
LEFT SIDE ELEVATION MATERIALS
TOTAL SURFACE AREA
41448 SQ. FT,
BRICK
11976 SQ. FT.
STONE
21072 SQ. FT.
TOTAL MASONRY
41048 SQ. FT.
PERCENTAGE
97%
160'-8"
T.O. PARAPET
FRONT ELEVATION MATERIALS
TOTAL SURFACE AREA
81652 SQ. FT.
BRICK
41437 SQ. FT.
STONE
21738 SQ. FT.
TOTAL MASONRY
71175 SQ. FT.
PERCENTAGE
83%
SIGN INFORMATION
BUILDING
FRONTAGE
2201_011
LOGO
PERCENTAGE
OF SIGN
ALLOWED
PROVIDED
FRONT SIGN
AREA
110 SQ. FT.
110 SQ. FT.
16%
SIDE SIGN
AREA
55 SQ. FT.
53 SQ. FT.
20%
SIDE SIGN
AREA
55 SQ. FT.
53 SQ. FT.
20%
TOTAL
220 SQ. FT.
216 SQ. FT.
�
EXTERIOR FINISH SCHEDULE
EIFS COLOR 1- _ BRICK/STONE
DRYVIT REFLECTIT ELDORADO STONE
ca!D COLOR TO MATCH - 61 CLIFFSTONE
BENJAMIN MOORS
CAMBRIA
EIFS COLOR 2
DRYVIT COLOR TO
SCK)BRICK COLOR TO
MATCH BENJAMIN
MATCH BENJAMIN
MOORE "POWELL
MOORE "LOG CABIN
BUFF HC -35", 2163-10"
NOTE: SANDPEBBLE FINISH
1. FINISH OF ALL PTAC/VTAC LOUVERS
TO MATCH ALUMINUM WINDOW FINISH,r---- � °--;...-....,.
B2 BRICK COLOR TO
UNLESS NOTED OTHERWISE. MATCH BENJAMIN
2. FINISH OF ALL OTHER LOUVERS TO MOORE "METALLIC
MATCH WALL ON WHICH IT OCCURS. NOTE: GOLD 2163-40"
3. ALL EIFS TO 61: 1 1/2" UNLESS NOTED 3% OF HEIGHT: 1'-6"
OTHERWISE. PARAPET CAP VERTICAL HEIGHT: 1'-6"
4. STORE FRONTS TO BE CLEAR ANODIZED
ALUMINUM.
5. PAINT METAL FASCIA, TRIM AND
COPING TO MATCH ADJACENT WALL
COLOR.
FLAG NOTES
D1 1" EIFS REVEAL, TYPICAL.
ALIGN & COORDINATE REVEALS ALONG ENTIRE FACADE OF BUILDING.
DEIFS V -GROOVE AT COLOR TRANSITION LOCATION.
3D ENTRY CANOPY- BOTTOM OF CANOPY AT 8'-10".
DLOUVERED SUNSHADE. - BOTTOM OF SUNSHADE AT 8'-10".
1 5 > VERTICAL STRIP LIGHT FIXTURE.
DLIGHT COVE.
I rill %I I{ -6v IIIn%A vvI I L.v eIw"r wva.V . .. v...v —v1 vu. -.--rr..r.v
CHANNEL LETTERS - AREA= 89 SQ FT -AREA = 21 SQ FT (<20%) TOTAL SIGN AREA =110 SQ.fT--
- WHITE IN COLOR - RED IN COLOR LETTERS FASTENED WITH 2"J -CLIPS
- WHITE LED ILLUMINATION - RED LED ILLUMINATION
s/� ENLARGED SIGN
3A SCALE: 3/16" = 1'-O"
STONE TO MATCH BUILDING
-_ = -= o - -_- PREFABRICATED METAL GATE
°o - =: =_-- -_ = =__- -ao PIVOTING GATE LATCHES
__ -- FABRICATED FROM 112"0 GALV
~-W VERIFY STEEL RODS
SIDE ELEVATION FRONT ELEVATION PROVIDE 314"0x4 DEEP SLEEVES
IN CONC PAVEMENT FOR LATCHES
TRASH ENCLOSURE
4
SCALE: 3/32" = 1'-O"
V
N
REVISIONS
PLEASE BE ADVISED THAT THIS SET
OF PLANS HAS BEEN PREPARED
FOR BUILDING CODE AND PLAN
REVIEW ONLY. THIS SET OF PLANS
SHOULD BE CONSIDERED
PRELIMINARY AND NOT FOR ANY
BIDDING, FINAL ESTIMATE OR
CONSTRUCTION. THIS SET OF
PLANS SHALL NOT BE DEEMED
FINAL UNTIL ALL APPROVALS HAVE
BEEN OBTAINED FROM ALL CODE
AUTHORITIES HAVING
JURISDICTION. ANY BID
SUBMITTED, BASED ON THIS SET OF
PRELIMINARY PLANS, IS SUBJECT
TO CHANGE AND IS INCOMPLETE.
UA JOB #
w
PROJ. DATE:
12-30-2008
FILE NAME:
14155A200 -A201
DWG. SCALE:
Imo+
CHECKED BY:
-
con
KFZ
H
O
H
�
�
H
W
�
a
�z
a
�
a
PLEASE BE ADVISED THAT THIS SET
OF PLANS HAS BEEN PREPARED
FOR BUILDING CODE AND PLAN
REVIEW ONLY. THIS SET OF PLANS
SHOULD BE CONSIDERED
PRELIMINARY AND NOT FOR ANY
BIDDING, FINAL ESTIMATE OR
CONSTRUCTION. THIS SET OF
PLANS SHALL NOT BE DEEMED
FINAL UNTIL ALL APPROVALS HAVE
BEEN OBTAINED FROM ALL CODE
AUTHORITIES HAVING
JURISDICTION. ANY BID
SUBMITTED, BASED ON THIS SET OF
PRELIMINARY PLANS, IS SUBJECT
TO CHANGE AND IS INCOMPLETE.
SHEET DESCRIPTION
DESCRIPTION
EXTERIOR ELEVATIONS
UA JOB #
08###
PROJ. DATE:
12-30-2008
FILE NAME:
14155A200 -A201
DWG. SCALE:
1:1
CHECKED BY:
-
DRAWN BY:
KFZ
SHEET DESCRIPTION
DESCRIPTION
EXTERIOR ELEVATIONS
,` 150'-8"
T.O. PARAPET
145'-0"
JOIST BRG.
jjk 136,_0"
4TH FLOOR
T.O. SHTG.
125'-0"
3RD FLOOR
T.O. SHTG.
114' -0-
2ND FLOOR
T.O. SHTG.
113'-8 7Z859
T.O. PARAPET
(KITCHEN)
100'-0"
T.O. SLAB
REAR ELEVATION
LE: 3/32" = 1'-0"
DSCA"
160'-8"
T.O. PARAPET
_ -
__
B2
= A200
B2 i ---- ...
ttl�L-.",--L--,--.--,�.::�.--�-,:-;* - ----- - ... ..... Fi.
---- ----
S2----------- --- .......------- _1 ---------------- -- ------------- --------------- .... ..-- ---------- ------------- -------- ------
...... - ------
---------- ---------- 7_
77
---:: - -----------------------------
----------- - rAi -
--- ---- -------
........... ........... ------------------
...'
------------- ... ---
--- --- --------
------------------1--------- -, ---- ---- ----- -----
- II
------------ .... ............ -.-.-.-.--.-.-.-.-.-.- i I. ... --------------- -----
` ���®
--- ----� ---- � - -� .. ... ..----------
..
-
3 ------ ----- ----- --------------------------- -----------------•---------------------------- -----•------------- --
A201 = -------- ------ - ----- ----- ---- -- --- -
-:: - - -- - --------
.... -
:::= -- .:.... Si - - __ . =_ - --
121 —4 ----
...........-•---
T.O. PARAPET � ... ,-_-------:___-: -- - - ----- - - ---------- --....... ............ :_._ _ - - ------ - .. ............. ..
AT CANOPY -
- - - -- -------------------------------------------------- ------------------------------------------- -------------- -- ------
( ) = -- -- ......... . --- ......
z " - - .. ...... ........ .......112-0
.. ...
112 —0 _-
' - ----- --- - -
- ;
T.O. PARAPET --
_.....
.
VESTIBULE : :... .... _
( ) ---- -
6 -.
--
...
- _
:_
_.
- ,
:..., . -
,-
------- ---; _ - --
-
-
B1 B2 B1
RIGHT SIED ELEVATION
2 SCALE: 3/32" = 1'-0"
RIGHT SIDE ELEVATION MATERIALS
TOTAL SURFACE AREA
41459 SQ. FT.
■
461
SIGN NOT TO EXCEED 3 SQ. FT.
r
TOTAL MASONRY
31921 SQ. FT.
PERCENTAGE
! t
REAR ELEVATION MATERIALS
iTOTAL SURFACE AREA
!'
_
0
fV
N
461
SIGN NOT TO EXCEED 3 SQ. FT.
21668 SQ. FT.
TOTAL MASONRY
71134 SQ. FT.
PERCENTAGE
DRAWN BY:
157'-0"
T.O. PARAPET
150'-8"+
T.O. PARAPET
145'-0"
JOIST BRG.
136'-0"
4TH FLOOR
T.O. SHTG.
125'-0" OIL
3RD FLOOR
S2 T.O. SHTG.
114'-0"
2ND FLOOR
T.O. SHTG.
:B1::)OL
113'-8 7/8
T.O. PARAPET
KITCHEN
S1- WHITE METAL PANEL SOFFIT
EXTERIOR FINISH SCHEDULE
EIFS COLOR 1
DRYVIT REFLECTIT
S1 COLOR TO MATCH
BENJAMIN MOORE
"WHITE"
EIFS COLOR 2
S2 DRYVIT COLOR TO
MATCH BENJAMIN
MOORE "POWELL
BUFF HC -35",
NOTE: SANDPEBBLE FINISH
1. FINISH OF ALL PTAG/VTAC LOUVERS
TO MATCH ALUMINUM WINDOW FINISH,
UNLESS NOTED OTHCRWISE.
2. FINISH OF ALL OTHER LOUVERS TO
MATCH WALL ON WHICH IT OCCURS.
3. ALL EIFS TO BE 1 1/2- UNLESS NOTED
OTHERWISE.
4. STORE FRONTS TO HE CLEAR ANODIZED
ALUMINUM.
5. PAINT METAL FASCIA, TRIM AND
COPING TO MATCH ADJACENT WALL
COLOR.
BRICK/STONE
B1 ELDORADO STONE
CLIFFSTONE
CAMBRIA
B2 BRICK COLOR TO
MATCH BENJAMIN
MOORE "LOG CABIN
2163-10"
B2 BRICK COLOR TO
MATCH BENJAMIN
MOORE "METALLIC
NOTE: GOLD 2163-40"
3% OF HEIGHT: 1'-6"
PARAPET CAP VERTICAL HEIGHT: 1'-6"
FLAG NOTES
D1 1" EIFS REVEAL, TYPICAL.
ALIGN & COORDINATE REVEALS ALONG ENTIRE FACADE OF BUILDING.
DEIFS V—GROOVE AT COLOR TRANSITION LOCATION.
DENTRY CANOPY— BOTTOM OF CANOPY AT 8'-10".
> LOUVERED SUNSHADE. — BOTTOM OF SUNSHADE AT 8'-10".
VERTICAL STRIP LIGHT FIXTURE.
DLIGHT COVE.
EXTERIOR PLYWOOD
SHEATHING ON 2x6
10"X2" HOLLOW STEEL TUBE NON-
STRUCTURALLOUVERS
NOTE:
PROJ. DATE:
_
0
fV
N
-
SIGN NOT TO EXCEED 3 SQ. FT.
0MOUNSITE SIGNAGE
4 1 /4" = 1'-0"
SIGN TO BE LIT BY GROUND
TED FLOOD LIGHTS.
CHECKED BY:
H
DRAWN BY:
HOLLOW STEEL TUBE BEAM
ROUND STEEL COLUMNS
STEEL COLUMN
ST2
STONE VENEER BENCH W/
PRECAST STONE COPING AT TOP
-' - CONCRETE CURB
CANOPY SECTION
SCALE: 1/4 = l' -O" SIGNS N TO HAVE A
MASONRY BASE TO
MATCH BUILDING
Message Options
NOT TO SCALE
METAL SIGN OPTIONS TO BE
SURFACE MOUNTED
"FAIRFIELD INN & SUITES" INDIVIDUAL
CHANNEL LETTERS
- WHITE INR
coLo
"MARRIOTT" INDIVIDUAL
CHANNEL LETTERS
- RED IN COLOR
BRICK TO MATCH BUILDING
BENJAMIN MOORS "LOG CABIN
2163-10"
MOVEMENT CONTROL SIGN
MONUMENT SIGN
NOTE: . r�
MONUMENT SIGN NOT TO
EXCEED 60 SQ. FT.
SIGN TO BE LIT BY GROUND
MOUNTED FLOOD LIGHTS.
._j 1 ._ 2014
y w8 -
C4 r .v§,.-., 2<: �.
Gil
'�°°� i ski v8Z53$ G t 0 6S.h I �°ah 1 s. ffa+r N
V
etbYhN,+Vx-. x'.G%%'Y,�.w^'.s9...✓.a.u<tTR'v».C-.+*'.'SN�+•"`C.: s<,. �a..--.......✓
NOTE:
PROJ. DATE:
EACH MOVEMENT CONTROL
FILE NAME:
SIGN NOT TO EXCEED 3 SQ. FT.
0MOUNSITE SIGNAGE
4 1 /4" = 1'-0"
SIGN TO BE LIT BY GROUND
TED FLOOD LIGHTS.
MONUMENT SIGN
NOTE: . r�
MONUMENT SIGN NOT TO
EXCEED 60 SQ. FT.
SIGN TO BE LIT BY GROUND
MOUNTED FLOOD LIGHTS.
._j 1 ._ 2014
y w8 -
C4 r .v§,.-., 2<: �.
Gil
'�°°� i ski v8Z53$ G t 0 6S.h I �°ah 1 s. ffa+r N
V
etbYhN,+Vx-. x'.G%%'Y,�.w^'.s9...✓.a.u<tTR'v».C-.+*'.'SN�+•"`C.: s<,. �a..--.......✓
PLEASE BE ADVISED THAT THIS SET
OF PLANS HAS BEEN PREPARED
FOR BUILDING CODE AND PLAN
REVIEW ONLY. THIS SET OF PLANS
SHOULD BE CONSIDERED
PRELIMINARY AND NOT FOR ANY
BIDDING, FINAL ESTIMATE OR
CONSTRUCTION. THIS SET OF
PLANS SHALL NOT BE DEEMED
FINAL UNTIL ALL APPROVALS HAVE
BEEN OBTAINED FROM ALL CODE
AUTHORITIES HAVING
JURISDICTION. ANY BID
SUBMITTED, BASED ON THIS SET OF
PRELIMINARY PL I SUBJECT
ANS, S SU J GT
TO CHANGE AND IS INCOMPLETE.
LJA JOB #
REVISIONS
PROJ. DATE:
12-30-2008
FILE NAME:
14155A200 -A201
W
1:1
CHECKED BY:
H
DRAWN BY:
KFZ
�
a
pz�
�
O
�
�
PLEASE BE ADVISED THAT THIS SET
OF PLANS HAS BEEN PREPARED
FOR BUILDING CODE AND PLAN
REVIEW ONLY. THIS SET OF PLANS
SHOULD BE CONSIDERED
PRELIMINARY AND NOT FOR ANY
BIDDING, FINAL ESTIMATE OR
CONSTRUCTION. THIS SET OF
PLANS SHALL NOT BE DEEMED
FINAL UNTIL ALL APPROVALS HAVE
BEEN OBTAINED FROM ALL CODE
AUTHORITIES HAVING
JURISDICTION. ANY BID
SUBMITTED, BASED ON THIS SET OF
PRELIMINARY PL I SUBJECT
ANS, S SU J GT
TO CHANGE AND IS INCOMPLETE.
LJA JOB #
08###
PROJ. DATE:
12-30-2008
FILE NAME:
14155A200 -A201
DWG. SCALE:
1:1
CHECKED BY:
--
DRAWN BY:
KFZ
SHEET DESCRIPTION
DESCRIPTION
EXTERIOR ELEVATIONS
ml