Application' I
;.
Revised: 6-17 $7
**MUST RETURN ALL SIX
PAGES OF THIS APPLICATION
CITY OF COPPELL
ZONING APPLICATION
214-462-0022
A: Requesting:
Description & Location of Property:
Survey & Abstract: John E. Holland Sur. A-614
Specific Use Permit [X]
1.
2. Addition Name (if applicable):
3. Lot & Block (if applicable):
4. Total Number of Acres:
5. Location further described:
Coppell Road
Coppell Switching Station
3.4070
Northwest corner of Thweatt Road and
C. Zoning Requested:
Present Zonin8 Proposed Zonin~
Dwelling Floor Area
Classifi- Gross Net* Classifi- Gross Net* Units/Acre (Non-Resid.
cation Area Area cation Acres Acres (Resid. Only) Uses Only)
L.I. L.I~SUP~
*Excludes major & secondary thoroughfares.
D. Reason(s) for Zoning Change (please be specific):
switching station
to construat a m]m~r~n
E. Fee:
I (We) hereby certify that the application fee, $ 217.03 , to cover the cost
of this zoning application, has been paid to the City of Coppell on Feb. ~4 ,
19 89. Further, I (We) hereby authorize the City of Coppell and its employees, to
enter upon the premises herein above described at all reasonable times for the
purpose of erecting, maintaining, or removing signs to notify the public of the
pending zoning application and/or public hearing concerning said application. I
(We) release the City of Coppell and its employees from liability for any damages
which may be incurred to my (our) property in the erecting, maintaing, or removal
of said signs.
oace: 02/14/89
Representative: Roy S. Turner
Telephone ~l: 954-5570
Owners Name: TU E%ectric
Address: 1511 Bryan
Dallas, TX 75201
"~ELECTRIC
February 13, 1989
Ms. Shohre Daneshmand
Civil Engineer
City of Coppell
P. O. Box 473
Coppell, Texas 75092
Dear Ms. Daneshmand:
I am submitting a preliminary application and Special Use Permit (SUP)
for the building permit for our proposed 138 kV electric substation to be
constructed on the northwest corner of the intersection of Thweatt Road and
Coppell Road in Coppell, Texas. I am also including fifteen (15) copies of
our preliminary plat, site, and landscape plans for your review. In addition,
I am attaching TUElectric checks in the amounts of $104.00 and $217.03 to
cover the preliminary plat and Special Use Permit (SUP), respectively.
Your assistance with this important project to provide a continued
reliable and adequate supply of electric energy to our customers in Coppell is
appreciated.
Very truly yours,
Mark Carpenter, Supervisor
Substation Engineering
WMC/RST:jas
Attachments
cc: Mr. Ricky Fads - TU, Farmers Branch
! 511 Bryan Street P.O. Box 660268 Dallas, Texas 75266-0268