PL Conf Center Exterior Elevationsc,
T
0
c
c
C
c
c
c
T.O. PARAPET
T.O. PARAPET
126-10"±
1ST FLOOR
T.O, CONC. SLAB
100'-0"
CONFERENCE CENTER FRONT (WEST) ELEVATION
T.O. PARAPET
131'-8"±
T.O. PARAPET
126'-10"±
T.O. PARAPET
116'-0"±
1ST FLOOR
T.O. CONC. SLAB
100'-0"
rIRmico, i ►r.
T.O. PARAPET
131'-8"+
T.O. PARAPET
126'-10"±
'.0. PARAPET T.O. PARAPET
IST FLOOR
T.O. CONC. SLAB
NIP 100'-0"
CONFERENCE CENTER REAR (EASTD ELEVATION
SCALE: 3132" =1'-0"
CONFERENCE CENTER RIGHT (SOUTH) ELEVATION
SCALE: 3/32" =1'-0"
tih T.O. PARAPET
131'-8"1
i Ah T.O. PARAPET
126'-10"±
T.O. PARAPET
116-0"±
a�
'o
a ST T.O. CONC. SLAB
ti. .. —
�
N
N
co
CD CONFERENCE CENTER LEFT NORTH ELEVATION
SCALE: 3/32" =1'-0"
M
CONF. CENTER FRONT (WEST) ELEVATION MATERIALS
TOTAL SURFACE AREA
3,421 SQ. FT.
PERCENTAGE
DOORS / WINDOWS
527 SQ. FT,
EFFECTIVE SURFACE AREA
2,894 SQ. FT.
19%
STONE
547 SQ. FT.
BRICK
2,108 SQ. FT.
73%
EIFS (20% MAX.)
239 SQ. FT.
8%
CONF. CENTER REAR (EAST) ELEVATION MATERIALS
TOTAL SURFACE AREA
3,490 SQ. FT.
PERCENTAGE
DOORS / WINDOWS
203 SQ. FT.
EFFECTIVE SURFACE AREA
3,287 SQ. FT,
STONE
620 SQ. FT.
19%
BRICK
2,424 SQ. FT.
74%
EIFS (20% MAX.)
243 SQ. FT.
7%
CONF. CENTER RIGHT (SOUTH) ELEVATIO9MATERIALS
TOTAL SURFACE AREA
4,645 SQ. FT.
DOORS / WINDOWS
120 SQ. FT.
EFFECTIVE SURFACE AREA
4,525 SQ. FT.
STONE
697 SQ. FT.
15%
BRICK
3,402 SQ. FT.
75%
EIFS (20% MAX.)
426 SQ. FT.
10%
CONF. CENTER LEFT (NORTH) ELEVATION MATERIALS
TOTAL SURFACE AREA
5,318 SQ, FT,
PERCENTAGE
DOORS / WINDOWS
69 SQ. FT.
EFFECTIVE SURFACE AREA
5,249 SQ. FT.
STONE
160 SQ. FT.
3%
BRICK
4,626 SQ. FT.
88%
EIFS (20% MAX.)
463 SQ. FT.
9%
EXTERIOR MATERIALS LEGEND
EF1 EIFS COLOR 1:
DRYVIT - SANDPEBBLE FINISH
COLOR TO MATCH SHERWIN WILLIAMS
SW 7028 "INCREDIBLE WHITE" (WHITE)
EF2 EIFS COLOR 2:
DRYVIT - SANDPEBBLE FINISH
COLOR TO MATCH SHERWIN WILLIAMS
SW 7602 "INDIGO BATIK" (BLUE)
CBD
BRICK COLOR 1:
ACME BRICK - KING SIZE BRICK (10"x3")
COLOR: ONYX FLASH (BROWN)
CK) BRICK COLOR 2:
ACME BRICK - KING SIZE BRICK (10"x3')
COLOR: DRIFTWOOD (TAN)
i I Ell 1 9
—Cff STONE VENEER COLOR 1:
ELDORADO STONE - EUROPEAN LEDGE
COLOR: GLACIER (WHITE)
FINISH NOTES:
1. FINISH OF ALL ALUMINUM WINDOWS & DOORS TO BE CLEAR
ANODIZED. FINISH OF ALL HOLLOW METAL DOORS & FRAMES TO BE
PAINTED TO MATCH MATERIAL ON WHICH IT OCCURS.
2. FINISH OF ALL PTAC LOUVERS TO MATCH INTEGRAL WINDOW FRAME
FINISH, UNLESS NOTED OTHERWISE. FINISH OF ALL OTHER LOUVERS
TO MATCH THE WALL MATERIAL ON WHICH IT OCCURS.
3. FINISH OF ALL GUTTERS & DOWNSPOUTS TO MATCH WALL MATERIAL
ON WHICH IT OCCURS.
4. ALL METAL COPING TO BE PREFINISHED TO MATCH MATERIAL ON
WHICH IT OCCURS.
REVISIONS
r�
C�1
COO-)lyl vmll
� o
con
PLEASE BE ADVISED THAT THIS SET
OF PLANS HAS BEEN PREPARED
FOR BUILDING CODE AND PLAN
REVIEW ONLY. THIS SET OF PLANS
SHOULD BE CONSIDERED
PRELIMINARY AND NOT FOR ANY
BIDDING, FINAL ESTIMATE OR
CONSTRUCTION. THIS SET OF
PLANS SHALL NOT BE DEEMED
FINAL UNTIL ALL APPROVALS HAVE
BEEN OBTAINED FROM ALL CODE
AUTHORITIES HAVING
JURISDICTION. ANY BID
SUBMITTED, BASED ON THIS SET OF
PRELIMINARY PLANS, IS SUBJECT
TO CHANGE AND IS INCOMPLETE.
LJA JOB # 14018
PROJ. DATE: 3.11-2016
FILE NAME: 14018A200 -A202
DWG. SCALE: AS NOTED
CHECKED BY:
DRAWN BY: HNH
SHEET DESCRIPTION
EXTERIOR ELEVATIONS
y CONFERENCE CENTER
A202
)I
i
PARAPET CORNICE HEIGHT
CORNICE DETAIL OF PARAPET WALLS SHALL HAVE A VERTICAL DIMENSION AT
LEAST 3% OF THE HEIGHT OF THE BUILDING.
BUILDING 31/o MIN. ACTUAL
PARAPET HEIGHT CORNICE HEIGHT CORNICE HEIGHT
HOTEL (A) 68'-10" 2'-0 3/4" 2'-2"
HOTEL (B) 73'-8" 2'-2112" 2'-8"
e,
x
A� �kE.,3v
�C) 75'-8" 21-31/2" 2'-T
1-10
Est TR -,(D) 26-10" 9314" "
r COIF CTR'(E) 31'-8" 11318" 2'-8"
REVISIONS
r�
C�1
COO-)lyl vmll
� o
con
PLEASE BE ADVISED THAT THIS SET
OF PLANS HAS BEEN PREPARED
FOR BUILDING CODE AND PLAN
REVIEW ONLY. THIS SET OF PLANS
SHOULD BE CONSIDERED
PRELIMINARY AND NOT FOR ANY
BIDDING, FINAL ESTIMATE OR
CONSTRUCTION. THIS SET OF
PLANS SHALL NOT BE DEEMED
FINAL UNTIL ALL APPROVALS HAVE
BEEN OBTAINED FROM ALL CODE
AUTHORITIES HAVING
JURISDICTION. ANY BID
SUBMITTED, BASED ON THIS SET OF
PRELIMINARY PLANS, IS SUBJECT
TO CHANGE AND IS INCOMPLETE.
LJA JOB # 14018
PROJ. DATE: 3.11-2016
FILE NAME: 14018A200 -A202
DWG. SCALE: AS NOTED
CHECKED BY:
DRAWN BY: HNH
SHEET DESCRIPTION
EXTERIOR ELEVATIONS
y CONFERENCE CENTER
A202
)I
i