Loading...
Concept ElevationsT/HIGH PARAPET EL: 35'-5" A.F.F. T/PARAPET EL: 24'-0" A.F.F. T/FINISH FLOOR EL: 0'-0" T/PARAPET EL. 24'-0" A.F.F. T/FINISH FLOOR EL 0'-0" T/PARAPET EL: 24'-0" A.F.F. T/FINISH FLOOR EL 0'-0" T/PARAPET @ BOX EL: 35'-5" T/PARAPET EL: 24'-0" T/FINISH FLOOR EL: 0'-0" West Elevation U) 0 �-- � zc�Q� zc�QO U)� 3: F_ �z�h- �O -w �O -w Ur z 0_{WJ �_!W_1 w � U) CO �� ry 0= rr0= GENERAL NOTES: North Elevation Eo. „o a East Elevation �o JW =Qac) .,-�P,ZrY South Elevation T/ENTRY CANOPY EL: 25'-1" A.F.F. 1. Information provided for design intent only. Design professional of record is responsible for verification of all applicable code requirements. Wall types illustrated are for preliminary space planning only; the design professional shall be responsible for code conformance and floor plan development per LAF's programming criteria. These plans are specifically not for use as layers to be imported into documents /files or to be used as tracing underlayment(s) for construction documents /files by the professional of record for this or any other project. West Elevation: S.F % Mason 4,570 93.6% -Masonry__41365 Stone (3.8%) Brick 89.8% EIFS 455 EIFS 301 6.4% Glass f }. 0% T/HIGH PARAPET EL: 35'-5" A.F.F. T/PARAPET EL: 24'-0" A.F.F. T/FINISH FLOOR EL: 0'-0" T/PARAPET EL. 24'-0" A.F.F. T/FINISH FLOOR EL 0'-0" T/PARAPET EL: 24'-0" A.F.F. T/FINISH FLOOR EL 0'-0" T/PARAPET @ BOX EL: 35'-5" T/PARAPET EL: 24'-0" T/FINISH FLOOR EL: 0'-0" West Elevation U) 0 �-- � zc�Q� zc�QO U)� 3: F_ �z�h- �O -w �O -w Ur z 0_{WJ �_!W_1 w � U) CO �� ry 0= rr0= GENERAL NOTES: North Elevation Eo. „o a East Elevation �o JW =Qac) .,-�P,ZrY South Elevation T/ENTRY CANOPY EL: 25'-1" A.F.F. 1. Information provided for design intent only. Design professional of record is responsible for verification of all applicable code requirements. Wall types illustrated are for preliminary space planning only; the design professional shall be responsible for code conformance and floor plan development per LAF's programming criteria. These plans are specifically not for use as layers to be imported into documents /files or to be used as tracing underlayment(s) for construction documents /files by the professional of record for this or any other project. West Elevation: S.F % Mason 4,570 93.6% -Masonry__41365 Stone (3.8%) Brick 89.8% EIFS 455 EIFS 301 6.4% Glass 0 0% Precast TOTAL 5,449 TOTAL 4,666 100% Overall Masonry% = 80.4% B=Z�� F =THIF=22 North Elevation: S.F % Mason 4,570 83.8% Stone (0%) Brick 83.8% Brick 89.8% EIFS 455 8.4% Glass 424 7.8% 0% 23.8% Precast TOTAL 5,449 100% East Elevation: SY % Masonry1 4,365 93.6% Stone (3.8%) Brick 89.8% EIFS 301 6.4% Glass 0 0% 23.8% Precast 352 TOTAL 41666 100% South Elevation: S.F Masonry 33291 56.4% Stone (35.2%). Brick 21.2% EIFS 544 9.3% Glass 1386 23.8% Precast 352 6% Metal Panel 264 4.5% TOTAL 5,837 100% Concept Elevations - Coppell, TX 08.03. 17