Concept ElevationsT/HIGH PARAPET
EL: 35'-5" A.F.F.
T/PARAPET
EL: 24'-0" A.F.F.
T/FINISH FLOOR
EL: 0'-0"
T/PARAPET
EL. 24'-0" A.F.F.
T/FINISH FLOOR
EL 0'-0"
T/PARAPET
EL: 24'-0" A.F.F.
T/FINISH FLOOR
EL 0'-0"
T/PARAPET @ BOX
EL: 35'-5"
T/PARAPET
EL: 24'-0"
T/FINISH FLOOR
EL: 0'-0"
West Elevation
U)
0 �--
� zc�Q� zc�QO
U)� 3: F_ �z�h-
�O -w �O -w
Ur z 0_{WJ �_!W_1
w � U) CO
�� ry 0= rr0=
GENERAL NOTES:
North Elevation Eo. „o a
East Elevation
�o
JW
=Qac)
.,-�P,ZrY
South Elevation
T/ENTRY CANOPY
EL: 25'-1" A.F.F.
1. Information provided for design intent only. Design professional of record is responsible for verification of all applicable code requirements. Wall types illustrated are for preliminary space planning only; the
design professional shall be responsible for code conformance and floor plan development per LAF's programming criteria. These plans are specifically not for use as layers to be imported into
documents /files or to be used as tracing underlayment(s) for construction documents /files by the professional of record for this or any other project.
West Elevation:
S.F
%
Mason
4,570
93.6%
-Masonry__41365
Stone (3.8%)
Brick 89.8%
EIFS
455
EIFS
301
6.4%
Glass
f }.
0%
T/HIGH PARAPET
EL: 35'-5" A.F.F.
T/PARAPET
EL: 24'-0" A.F.F.
T/FINISH FLOOR
EL: 0'-0"
T/PARAPET
EL. 24'-0" A.F.F.
T/FINISH FLOOR
EL 0'-0"
T/PARAPET
EL: 24'-0" A.F.F.
T/FINISH FLOOR
EL 0'-0"
T/PARAPET @ BOX
EL: 35'-5"
T/PARAPET
EL: 24'-0"
T/FINISH FLOOR
EL: 0'-0"
West Elevation
U)
0 �--
� zc�Q� zc�QO
U)� 3: F_ �z�h-
�O -w �O -w
Ur z 0_{WJ �_!W_1
w � U) CO
�� ry 0= rr0=
GENERAL NOTES:
North Elevation Eo. „o a
East Elevation
�o
JW
=Qac)
.,-�P,ZrY
South Elevation
T/ENTRY CANOPY
EL: 25'-1" A.F.F.
1. Information provided for design intent only. Design professional of record is responsible for verification of all applicable code requirements. Wall types illustrated are for preliminary space planning only; the
design professional shall be responsible for code conformance and floor plan development per LAF's programming criteria. These plans are specifically not for use as layers to be imported into
documents /files or to be used as tracing underlayment(s) for construction documents /files by the professional of record for this or any other project.
West Elevation:
S.F
%
Mason
4,570
93.6%
-Masonry__41365
Stone (3.8%)
Brick 89.8%
EIFS
455
EIFS
301
6.4%
Glass
0
0%
Precast
TOTAL
5,449
TOTAL
4,666
100%
Overall Masonry% = 80.4%
B=Z�� F =THIF=22
North Elevation:
S.F
%
Mason
4,570
83.8%
Stone (0%)
Brick 83.8%
Brick 89.8%
EIFS
455
8.4%
Glass
424
7.8%
0%
23.8%
Precast
TOTAL
5,449
100%
East Elevation:
SY
%
Masonry1
4,365
93.6%
Stone (3.8%)
Brick 89.8%
EIFS
301
6.4%
Glass
0
0%
23.8%
Precast
352
TOTAL
41666
100%
South Elevation:
S.F
Masonry
33291
56.4%
Stone (35.2%).
Brick 21.2%
EIFS
544
9.3%
Glass
1386
23.8%
Precast
352
6%
Metal Panel
264
4.5%
TOTAL
5,837
100%
Concept Elevations - Coppell, TX
08.03. 17