Ordinance 91500-A-737.Samaritans PurseExhibit “A”
LOCATION MAPNTS'PROJECTLOCATION¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬SITE PLAN¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬SAMARITAN'S PURSELOT 1, BLOCK ASAMARITANS PURSE FELLOWSHIP ADDITION10.683 ACRESJ. GIBSON SURVEY, ABSTRACT NO. 1716CITY OF COPPELL, DALLAS COUNTY, TEXASZONING: PD-296-LIOWNER / APPLICANTSamaritan's PursePO BOX 3000Boone, North Carolina 28607Telephone (828) 278-1204Contact: Ernest CompitelloENGINEER / SURVEYORSpiars Engineering, Inc.765 Custer Road, Suite 100Plano, TX 75075Telephone: (972) 422-0077TBPE No. F-2121 / TBPLS No. F-10043100Contact: David BondExhibit "B" Page 1 of 1
60' R.O.W. - Vol. 2000102, Pg. 4826& Vol. 2000090, Pg. 8353 DRDCTCOPPELL, TEXASSAMARITANS PURSEpross design group, incorporated5310 Harvest Hill Road, Suite 180, Dallas, Texas 75230. 972/759-1400PROGRESS SET - FOR REVIEW ONLYISSUEDThese documents areNOT FOR REGULATORY APPROVAL,PERMITTING OR CONSTRUCTION.They were prepared by,or under the supervision of:Kori Ann Haug TX Registered Landscape Architect#224608.29.18STATEOFTEXASTCETHIRCAEPACSDNALDEEGEISRRT4226KORINHAUGAN11/06/18SAMARITANS PURSEFELLOWSHIP ADDITIONLOT 1, BLOCK A10.683 ACRES in theJ. GIBSON SURVEY, ABSTRACT NO. 1716CITY OF COPPELL, DALLAS COUNTY, TEXASZONING: PD-296-LIOWNER / APPLICANTSamaritan's PursePO BOX 3000Boone, North Carolina 28607Telephone (828) 278-1204Contact: Ernest CompitelloENGINEER / SURVEYORSpiars Engineering, Inc.765 Custer Road, Suite 100Plano, TX 75075Telephone: (972) 422-0077TBPE No. F-2121 / TBPLS No. F-10043100Contact: David BondL1.00OVERALL LANDSCAPE PLANNKAHAPL0 25 50100SCALE: 1" = 50'-0"09/11/2018Exhibit "C" Page 1 of 9
60' R.O.W. - Vol. 2000102, Pg. 4826& Vol. 2000090, Pg. 8353 DRDCTVol. 2000102, Pg. 4826 DRDCTVol. 2000102, Pg. 4826 DRDCTVol. 94091, Pg. 1680 DRDCTVol. 94091, Pg. 1680 DRDCT583580326590579397325593324592613618622623617619601398399323322321320319612611608609610607606605318597600313312599314598596311310309317316315393392388394395396391390389387386385581384377305304308307306301302303595380379378381382383374375300594376373372371368370369366367364365363807879333400401405357360361898590868887362591EXISTING TREETO REMAIN, TYP.EXISTING TREETO REMAIN, TYP.EXISTING TREETO REMAIN, TYP.EXISTING TREETO REMAIN, TYP.EXISTING TREE TOBE REMOVED, TYP.EXISTING TREE TOBE REMOVED, TYP.EXISTING TREE TOBE REMOVED, TYP.EXISTING TREE TOBE REMOVED, TYP.X
XXX
X
X
XXX
X X
XXXXXXX X TREE PROTECTIONFENCING TO REMAINDURING CONSTRUCTION,TYP. REFER TO 01/L1.01TREE PROTECTIONFENCING TOREMAIN DURINGCONSTRUCTION,TYP. REFER TO01/L1.01COPPELL, TEXASSAMARITANS PURSEpross design group, incorporated5310 Harvest Hill Road, Suite 180, Dallas, Texas 75230. 972/759-1400PROGRESS SET - FOR REVIEW ONLYISSUEDThese documents areNOT FOR REGULATORY APPROVAL,PERMITTING OR CONSTRUCTION.They were prepared by,or under the supervision of:Kori Ann Haug TX Registered Landscape Architect#224608.29.18STATEOFTEXASTCETHIRCAEPACSDNALDEEGEISRRT4226KORINHAUGAN11/06/18SAMARITANS PURSEFELLOWSHIP ADDITIONLOT 1, BLOCK A10.683 ACRES in theJ. GIBSON SURVEY, ABSTRACT NO. 1716CITY OF COPPELL, DALLAS COUNTY, TEXASZONING: PD-296-LIOWNER / APPLICANTSamaritan's PursePO BOX 3000Boone, North Carolina 28607Telephone (828) 278-1204Contact: Ernest CompitelloENGINEER / SURVEYORSpiars Engineering, Inc.765 Custer Road, Suite 100Plano, TX 75075Telephone: (972) 422-0077TBPE No. F-2121 / TBPLS No. F-10043100Contact: David BondL1.0101530 60SCALE: 1" = 30'-0"NMATCHLINE - REFER TO L1.02TREE PRESERVATION NOTES1. EXISTING TREES TO REMAIN SHALL BE PROTECTEDDURING CONSTRUCTION FROM TREE STRUCTUREDAMAGE AND COMPACTION OF SOIL UNDER ANDAROUND DRIP LINE (CANOPY) OF TREE.2. IF ANY ROOT STRUCTURE IS DAMAGED DURINGADJACENT EXCAVATION / CONSTRUCTION, NOTIFYOWNER'S AUTHORIZED REPRESENTATIVEIMMEDIATELY. IT IS RECOMMENDED THAT A LICENSEDARBORIST BE SECURED FOR THE TREATMENT OF ANYPOSSIBLE TREE WOUNDS.3. NO DISTURBANCE OF THE SOIL GREATER THAN 4"SHALL BE LOCATED CLOSER TO THE TREE TRUNKTHAN 1/2 THE DISTANCE OF THE DRIP LINE TO THETREE TRUNK. A MINIMUM OF 75% OF THE DRIP LINEAND ROOT ZONE SHALL BE PRESERVED AT NATURALGRADE.4. ANY FINE GRADING DONE WITHIN THE CRITICAL ROOTZONES OF THE PROTECTED TREES MUST BE DONEWITH LIGHT MACHINERY SUCH AS A BOBCAT ORLIGHT TRACTOR. NO EARTH MOVING EQUIPMENTWITH TRACKS IS ALLOWED WITHIN THE CRITICALROOT ZONE OF THE TREES.5. NO MATERIALS INTENDED FOR USE IN CONSTRUCTIONOR WASTE MATERIALS ACCUMULATED DUE TOEXCAVATION OR DEMOLITION SHALL BE PLACEDWITHIN THE LIMITS OF THE DRIP LINE OF ANY TREE.6. NO EQUIPMENT MAY BE CLEANED OR TOXICSOLUTIONS, OR OTHER LIQUID CHEMICALS, SHALL BEDEPOSITED WITHIN THE LIMITS OF THE DRIP LINE OF ATREE, INCLUDING BUT NOT LIMITED TO: PAINT, OIL,SOLVENTS, ASPHALT, CONCRETE, MORTAR, PRIMERS,ETC.7. NO SIGNS, WIRES OR OTHER ATTACHMENTS, OTHERTHAN THOSE OF A PROTECTIVE NATURE, SHALL BEATTACHED TO ANY TREE.8. NO VEHICULAR / CONSTRUCTION EQUIPMENT TRAFFICOR PARKING IS ALLOWED WITHIN THE LIMITS OF THEDRIP LINE OF TREES.9. BORING OF UTILITIES MAY BE PERMITTED UNDERPROTECTED TREES IN CERTAIN CIRCUMSTANCES. THEMINIMUM LENGTH OF THE BORE SHALL BE THE WIDTHOF THE TREE'S CANOPY AND SHALL BE A MINIMUMDEPTH OF FORTY-EIGHT (48") INCHES.10. IRRIGATION TRENCHING WHICH MUST BE DONE WITHINTHE CRITICAL ROOT ZONE OF A TREE SHALL BE DUGBY HAND AND ENTER THE AREA IN A RADIAL MANNER.11. ALL TREES TO BE REMOVED FROM THE SITE SHALL BEFLAGGED BY THE CONTRACTOR WITH BRIGHT REDVINYL TAPE (3" WIDTH) WRAPPED AROUND THE MAINTRUNK AT A HEIGHT OF FOUR (4') FEET ABOVE GRADE.FLAGGING SHALL BE APPROVED BY OWNER'SAUTHORIZED REPRESENTATIVE PRIOR TO ANY TREEREMOVAL. CONTRACTOR SHALL CONTACT OWNER'SAUTHORIZED REPRESENTATIVE WITH 72 HOURSNOTICE TO SCHEDULE ON-SITE MEETING.12. ALL TREES TO REMAIN, AS NOTED ON DRAWINGS,SHALL HAVE PROTECTIVE FENCING LOCATED AT THETREE'S DRIP LINE. THE PROTECTIVE FENCING MAY BECOMPRISED OF SNOW FENCING, ORANGE VINYLCONSTRUCTION FENCING, CHAIN LINK FENCE OROTHER SIMILAR FENCING WITH A FOUR (4') FOOTAPPROXIMATE HEIGHT. THE PROTECTIVE FENCINGSHALL BE LOCATED AS INDICATED ON THE TREEPROTECTION DETAIL.13. WHEN A LOW HANGING LIMB IS BROKEN DURING THECOURSE OF CONSTRUCTION, THE CONTRACTOR SHALLNOTIFY THE OWNER'S AUTHORIZED REPRESENTATIVEIMMEDIATELY. UNDER NO CIRCUMSTANCE SHALL THECONTRACTOR PRUNE ANY PORTION OF THE DAMAGEDTREE WITHOUT THE PRIOR APPROVAL BY THEOWNER'S AUTHORIZED REPRESENTATIVE.XEXISTING TREETO BE REMOVEDTREE PROTECTION FENCINGTO REMAIN DURINGCONSTRUCTION,REFER TO 01/L1.01EXISTING TREETO REMAINEXISTING TREE LEGEND4'-0" MIN.3'-0"LIMITS OF DRIPLINE01TREE PROTECTIVE FENCINGNOT TO SCALEREFER TO PLAN FOREXISTING TREE TO REMAINEXISTING GRADE TOREMAIN UNDISTURBEDMETAL T-POST PLACED NOFURTHER THAN 15' APARTSNOW FENCE, ORANGE VINYLCONSTRUCTION FENCE, ORCHAINLINK FENCEKAHAPL09/11/2018TREE SURVEY ANDMITIGATION PLANExhibit "C" Page 2 of 9
CTVol. 2003055, Pg. 6363 DRDCTVol. 94091, Pg. 1680 DRDCT60' R.O.W. - Vol. 2000102, Pg. 4826& Vol. 2000090, Pg. 8353 DRDCT0981777668747573727169701121111131181221231171141151161211201193312692999893959496971001021011101091081071061051271041031821281291331341301311323157057114413513613713813914114014314256756956814514614714815215315114915016116215415515615715816015956656456522212019181711701716151413111264656266676345444612412539373835302928272623255635625595575565555345361801631781791771811761751691671641661651731235172416817450050850550350451251351152051951851651752255055355255167891052754954254854754554654454354154053953853753353553291554EXISTING TREETO REMAIN, TYP.EXISTING TREETO REMAIN, TYP.EXISTING TREETO REMAIN, TYP.EXISTING TREETO REMAIN, TYP.EXISTING TREETO REMAIN,TYP.EXISTING TREETO REMAIN, TYP.EXISTING TREETO REMAIN, TYP.EXISTING TREE TOBE REMOVED, TYP.EXISTING TREE TOBE REMOVED, TYP.EXISTING TREE TOBE REMOVED, TYP.EXISTING TREE TOBE REMOVED, TYP.EXISTING TREE TOBE REMOVED, TYP.EXISTING TREE TOBE REMOVED, TYP.XXXXXX XX XX X XXX XXX XX XXXXXXX
XXXXXX XX
TREE PROTECTIONFENCING TO REMAINDURING CONSTRUCTION,TYP. REFER TO 01/L1.01TREE PROTECTIONFENCING TO REMAINDURING CONSTRUCTION,TYP. REFER TO 01/L1.01TREE PROTECTIONFENCING TO REMAINDURING CONSTRUCTION,TYP. REFER TO 01/L1.01TREE PROTECTIONFENCING TOREMAIN DURINGCONSTRUCTION,TYP. REFER TO01/L1.01COPPELL, TEXASSAMARITANS PURSEpross design group, incorporated5310 Harvest Hill Road, Suite 180, Dallas, Texas 75230. 972/759-1400PROGRESS SET - FOR REVIEW ONLYISSUEDThese documents areNOT FOR REGULATORY APPROVAL,PERMITTING OR CONSTRUCTION.They were prepared by,or under the supervision of:Kori Ann Haug TX Registered Landscape Architect#224608.29.18STATEOFTEXASTCETHIRCAEPACSDNALDEEGEISRRT4226KORINHAUGAN11/06/18SAMARITANS PURSEFELLOWSHIP ADDITIONLOT 1, BLOCK A10.683 ACRES in theJ. GIBSON SURVEY, ABSTRACT NO. 1716CITY OF COPPELL, DALLAS COUNTY, TEXASZONING: PD-296-LIOWNER / APPLICANTSamaritan's PursePO BOX 3000Boone, North Carolina 28607Telephone (828) 278-1204Contact: Ernest CompitelloENGINEER / SURVEYORSpiars Engineering, Inc.765 Custer Road, Suite 100Plano, TX 75075Telephone: (972) 422-0077TBPE No. F-2121 / TBPLS No. F-10043100Contact: David BondL1.0201530 60SCALE: 1" = 30'-0"NXEXISTING TREETO BE REMOVEDTREE PROTECTION FENCINGTO REMAIN DURINGCONSTRUCTION,REFER TO 01/L1.01EXISTING TREETO REMAINEXISTING TREE LEGENDKAHAPL09/11/2018TREE SURVEY ANDMITIGATION PLANMATCHLINE - REFER TO L1.01Exhibit "C" Page 3 of 9
COPPELL, TEXASSAMARITANS PURSEpross design group, incorporated5310 Harvest Hill Road, Suite 180, Dallas, Texas 75230. 972/759-1400PROGRESS SET - FOR REVIEW ONLYISSUEDThese documents areNOT FOR REGULATORY APPROVAL,PERMITTING OR CONSTRUCTION.They were prepared by,or under the supervision of:Kori Ann Haug TX Registered Landscape Architect#224608.29.18STATEOFTEXASTCETHIRCAEPACSDNALDEEGEISRRT4226KORINHAUGAN11/06/18SAMARITANS PURSEFELLOWSHIP ADDITIONLOT 1, BLOCK A10.683 ACRES in theJ. GIBSON SURVEY, ABSTRACT NO. 1716CITY OF COPPELL, DALLAS COUNTY, TEXASZONING: PD-296-LIOWNER / APPLICANTSamaritan's PursePO BOX 3000Boone, North Carolina 28607Telephone (828) 278-1204Contact: Ernest CompitelloENGINEER / SURVEYORSpiars Engineering, Inc.765 Custer Road, Suite 100Plano, TX 75075Telephone: (972) 422-0077TBPE No. F-2121 / TBPLS No. F-10043100Contact: David BondL1.03TREE MITIGATION TABULATIONSCITY OF COPPELL, TEXASLESS THAN 12"GROSS RETRIBUTION 685.8 cal. in.minus (-)PRESERVATION CREDIT:Trees Preserved on Site 956.1 cal. in.divided by (÷)Total Trees on Site 2,424.7 cal. in.equals (=)Preservation Percentage 39%times (x)Gross Retribution 685.8 cal. in.equals (=)PRESERVATION CREDIT 267.5 cal. in.minus (-)LANDSCAPE CREDIT -177.5 cal. in.equals (=)71 trees, 4" cal.71*2.5 = 147.5NET RETRIBUTION90times (x) $100.00x $100.00equals (=)CONTRIBUTION TO CITY OF$9,000.00COPPELL REFORESTATIONAND NATURAL AREAS FUNDKAHAPLTREE MITIGATION TABULATIONSCITY OF COPPELL, TEXAS12" OR GREATERGROSS RETRIBUTION 782.8 cal. in.minus (-)PRESERVATION CREDIT:Trees Preserved on Site 956.1 cal. in.divided by (÷)Total Trees on Site 2,424.7 cal. in.equals (=)Preservation Percentage 39%times (x)Gross Retribution 782.8 cal. in.equals (=)PRESERVATION CREDIT 305.3 cal. in.minus (-)NET RETRIBUTION 305.3times (x) $200.00x $200.00equals (=)CONTRIBUTION TO CITY OF $61,060.00COPPELL REFORESTATIONAND NATURAL AREAS FUND09/11/2018TOTAL COMBINEDCONTRIBUTION TO CITY OF $70,060.00COPPELL REFORESTATIONAND NATURAL AREAS FUNDTREE SURVEY ANDMITIGATION PLANVARIANCE REQUESTWE ARE REQUESTING 100% OF THE MITIGATION FEES TO BEWAIVED, IN THE TOTAL AMOUNT NOTED ABOVE.Exhibit "C" Page 4 of 9
60' R.O.W. - Vol. 2000102, Pg. 4826& Vol. 2000090, Pg. 8353 DRDCTCOPPELL, TEXASSAMARITANS PURSEpross design group, incorporated5310 Harvest Hill Road, Suite 180, Dallas, Texas 75230. 972/759-1400PROGRESS SET - FOR REVIEW ONLYISSUEDThese documents areNOT FOR REGULATORY APPROVAL,PERMITTING OR CONSTRUCTION.They were prepared by,or under the supervision of:Kori Ann Haug TX Registered Landscape Architect#224608.29.18STATEOFTEXASTCETHIRCAEPACSDNALDEEGEISRRT4226KORINHAUGAN11/06/18SAMARITANS PURSEFELLOWSHIP ADDITIONLOT 1, BLOCK A10.683 ACRES in theJ. GIBSON SURVEY, ABSTRACT NO. 1716CITY OF COPPELL, DALLAS COUNTY, TEXASZONING: PD-296-LIOWNER / APPLICANTSamaritan's PursePO BOX 3000Boone, North Carolina 28607Telephone (828) 278-1204Contact: Ernest CompitelloENGINEER / SURVEYORSpiars Engineering, Inc.765 Custer Road, Suite 100Plano, TX 75075Telephone: (972) 422-0077TBPE No. F-2121 / TBPLS No. F-10043100Contact: David BondL2.00LANDSCAPE AREA PLANKAHAPL09/11/2018INTERIOR LANDSCAPENON-VEHICULAROPEN SPACELANDSCAPE AREA LEGENDPERIMETER LANDSCAPE12,134 s.f.57,048 s.f.39,910 s.f.12,766 s.f.116,739 s.f.39,910 s.f.Required ProvidedN0 25 50100SCALE: 1" = 50'-0"Exhibit "C" Page 5 of 9
60' R.O.W. - Vol. 2000102, Pg. 4826& Vol. 2000090, Pg. 8353 DRDCTVol. 2000102, Pg. 4826 DRDCTVol. 2000102, Pg. 4826 DRDCTVol. 94091, Pg. 1680 DRDCTVol. 94091, Pg. 1680 DRDCT58358032659057939732559332459261361862262361761958133340040140535736036189859086888759189DBH5CP140DBH13CE1LE2LE1LE2LE1LE2LE3CE34DBHLAWN HYDROMULCH NATIVEGRASS MIX WITH TEMPORARYIRRIGATION UNTIL 100%ESTABLISHMENT, TYP.LAWN SOLID SODBERMUDAGRASS, TYP.LAWN SOLID SODBERMUDAGRASS, TYP.NATIVE AREA TO REMAIN, REPAIRAND REPLACE AS NECESSARY DUETO CONSTRUCTION, TYP.NATIVE AREA TO REMAIN,REPAIR AND REPLACE ASNECESSARY DUE TOCONSTRUCTION, TYP.LAWN SOLID SODBERMUDAGRASS,TYP.UTILITY GRAVEL, 4"DEPTH WITH WEEDBARRIER FABRIC, TYP.UTILITY GRAVEL, 4"DEPTH WITH WEEDBARRIER FABRIC, TYP.UTILITY GRAVEL, 4"DEPTH WITH WEEDBARRIER FABRIC, TYP.SIDEWALKSIDEWALKEXISTING TREE TO REMAIN,TYP. REFER TO PRUNING ANDTRIMMING NOTES, L2.03EXISTING TREE TO REMAIN,TYP. REFER TO PRUNING ANDTRIMMING NOTES, L2.03EXISTING TREE TO REMAIN,TYP. REFER TO PRUNING ANDTRIMMING NOTES, L2.03COPPELL, TEXASSAMARITANS PURSEpross design group, incorporated5310 Harvest Hill Road, Suite 180, Dallas, Texas 75230. 972/759-1400PROGRESS SET - FOR REVIEW ONLYISSUEDThese documents areNOT FOR REGULATORY APPROVAL,PERMITTING OR CONSTRUCTION.They were prepared by,or under the supervision of:Kori Ann Haug TX Registered Landscape Architect#224608.29.18STATEOFTEXASTCETHIRCAEPACSDNALDEEGEISRRT4226KORINHAUGAN11/06/18SAMARITANS PURSEFELLOWSHIP ADDITIONLOT 1, BLOCK A10.683 ACRES in theJ. GIBSON SURVEY, ABSTRACT NO. 1716CITY OF COPPELL, DALLAS COUNTY, TEXASZONING: PD-296-LIOWNER / APPLICANTSamaritan's PursePO BOX 3000Boone, North Carolina 28607Telephone (828) 278-1204Contact: Ernest CompitelloENGINEER / SURVEYORSpiars Engineering, Inc.765 Custer Road, Suite 100Plano, TX 75075Telephone: (972) 422-0077TBPE No. F-2121 / TBPLS No. F-10043100Contact: David BondL2.01LANDSCAPE PLAN01530 60SCALE: 1" = 30'-0"NMATCHLINE - REFER TO L2.02KAHAPL09/11/2018Exhibit "C" Page 6 of 9
60' R.O.W. - Vol. 2000102, Pg. 4826& Vol. 2000090, Pg. 8353 DRDCT31646562666763454446124125393738353029282726232556356255955755655553453617312354168174500508505503504512513511520519518516517522550553552551678910527549542548547545546544543541540539538537533535532554EXISTING TREETO REMAIN, TYP.XXXXXX XX XX X XXX XXX XX XXXXXXX
XXXXXX XX
34DBH3CE1LE1LO2SO1LO2SO2SO2SO2SO2SO2SO2SO2SO2SO1SO1SO1LO141DBH1LO1LO1LO1LO1LO1LO1LO1LONATIVE AREA TO REMAIN, REPAIRAND REPLACE AS NECESSARY DUETO CONSTRUCTION, TYP.LAWN SOLID SODBERMUDAGRASS, TYP.LAWN SOLID SODBERMUDAGRASS, TYP.24" MULCH BED,TYP. AT B.O.C.UTILITY GRAVEL, 4"DEPTH WITH WEEDBARRIER FABRIC, TYP.UTILITY GRAVEL, 4"DEPTH WITH WEEDBARRIER FABRIC, TYP.24" MULCH BED,TYP. AT B.O.C.LAWN SOLID SODBERMUDAGRASS, TYP.NATIVE AREA TO REMAIN,REPAIR AND REPLACE ASNECESSARY DUE TOCONSTRUCTION, TYP.UTILITY GRAVEL, 4"DEPTH WITH WEEDBARRIER FABRIC, TYP.UTILITY GRAVEL, 4"DEPTH WITH WEEDBARRIER FABRIC, TYP.UTILITY GRAVEL,4" DEPTH WITHWEED BARRIERFABRIC, TYP.UTILITY GRAVEL, 4"DEPTH WITH WEEDBARRIER FABRIC, TYP.UTILITY GRAVEL,4" DEPTH WITHWEED BARRIERFABRIC, TYP.2SO2SOSIDEWALKEXISTING TREE TO REMAIN,TYP. REFER TO PRUNING ANDTRIMMING NOTES, L2.03EXISTING TREE TO REMAIN,TYP. REFER TO PRUNING ANDTRIMMING NOTES, L2.03EXISTING TREE TOREMAIN, TYP. REFERTO PRUNING ANDTRIMMING NOTES,L2.03EXISTING TREE TO REMAIN,TYP. REFER TO PRUNING ANDTRIMMING NOTES, L2.03EXISTING TREE TO REMAIN,TYP. REFER TO PRUNING ANDTRIMMING NOTES, L2.03EXISTING TREE TO REMAIN,TYP. REFER TO PRUNING ANDTRIMMING NOTES, L2.03COPPELL, TEXASSAMARITANS PURSEpross design group, incorporated5310 Harvest Hill Road, Suite 180, Dallas, Texas 75230. 972/759-1400PROGRESS SET - FOR REVIEW ONLYISSUEDThese documents areNOT FOR REGULATORY APPROVAL,PERMITTING OR CONSTRUCTION.They were prepared by,or under the supervision of:Kori Ann Haug TX Registered Landscape Architect#224608.29.18STATEOFTEXASTCETHIRCAEPACSDNALDEEGEISRRT4226KORINHAUGAN11/06/18SAMARITANS PURSEFELLOWSHIP ADDITIONLOT 1, BLOCK A10.683 ACRES in theJ. GIBSON SURVEY, ABSTRACT NO. 1716CITY OF COPPELL, DALLAS COUNTY, TEXASZONING: PD-296-LIOWNER / APPLICANTSamaritan's PursePO BOX 3000Boone, North Carolina 28607Telephone (828) 278-1204Contact: Ernest CompitelloENGINEER / SURVEYORSpiars Engineering, Inc.765 Custer Road, Suite 100Plano, TX 75075Telephone: (972) 422-0077TBPE No. F-2121 / TBPLS No. F-10043100Contact: David BondL2.02LANDSCAPE PLAN01530 60SCALE: 1" = 30'-0"NKAHAPL09/11/2018MATCHLINE - REFER TO L2.01Exhibit "C" Page 7 of 9
COPPELL, TEXASSAMARITANS PURSEpross design group, incorporated5310 Harvest Hill Road, Suite 180, Dallas, Texas 75230. 972/759-1400PROGRESS SET - FOR REVIEW ONLYISSUEDThese documents areNOT FOR REGULATORY APPROVAL,PERMITTING OR CONSTRUCTION.They were prepared by,or under the supervision of:Kori Ann Haug TX Registered Landscape Architect#224608.29.18STATEOFTEXASTCETHIRCAEPACSDNALDEEGEISRRT4226KORINHAUGAN11/06/18SAMARITANS PURSEFELLOWSHIP ADDITIONLOT 1, BLOCK A10.683 ACRES in theJ. GIBSON SURVEY, ABSTRACT NO. 1716CITY OF COPPELL, DALLAS COUNTY, TEXASZONING: PD-296-LIOWNER / APPLICANTSamaritan's PursePO BOX 3000Boone, North Carolina 28607Telephone (828) 278-1204Contact: Ernest CompitelloENGINEER / SURVEYORSpiars Engineering, Inc.765 Custer Road, Suite 100Plano, TX 75075Telephone: (972) 422-0077TBPE No. F-2121 / TBPLS No. F-10043100Contact: David BondL2.03LANDSCAPE NOTESLANDSCAPE NOTES1. CONTRACTOR SHALL VERIFY ALL EXISTING ANDPROPOSED SITE ELEMENTS AND NOTIFY LANDSCAPEARCHITECT OF ANY DISCREPANCIES. SURVEY DATAOF EXISTING CONDITIONS WAS SUPPLIED BY OTHERS.2. CONTRACTOR SHALL LOCATE ALL EXISTINGUNDERGROUND UTILITIES AND NOTIFY LANDSCAPEARCHITECT OF ANY CONFLICTS. CONTRACTOR SHALLEXERCISE CAUTION WHEN WORKING IN THE VICINITYOF UNDERGROUND UTILITIES.3. CONTRACTOR SHALL PROVIDE A MINIMUM 2% SLOPEAWAY FROM ALL STRUCTURES.4. CONTRACTOR SHALL FINE GRADE AREAS TO ACHIEVEFINAL CONTOURS AS INDICATED. LEAVE AREAS TORECEIVE TOPSOIL 3" BELOW FINAL FINISHED GRADE INPLANTING AREAS AND 1" BELOW FINAL FINISHEDGRADE IN LAWN AREAS.5. ALL PLANTING BEDS AND LAWN AREAS SHALL BESEPARATED BY STEEL EDGING. NO STEEL EDGINGSHALL BE INSTALLED ADJACENT TO BUILDINGS,WALKS, OR CURBS. CUT STEEL EDGING AT 45 DEGREEANGLE WHERE IT INTERSECTS WALKS AND CURBS.6. TOP OF MULCH SHALL BE 1/2" MINIMUM BELOW THETOP OF WALKS AND CURBS.7. ALL LAWN AREAS SHALL BE SOLID SODBERMUDAGRASS, UNLESS OTHERWISE NOTED ON THEDRAWINGS.8. ALL REQUIRED LANDSCAPE AREAS SHALL BEPROVIDED WITH AN AUTOMATIC UNDERGROUNDIRRIGATION SYSTEM WITH RAIN AND FREEZE SENSORSAND EVAPOTRANSPIRATION (ET) WEATHER-BASEDCONTROLLERS AND SAID IRRIGATION SYSTEM SHALLBE DESIGNED BY A QUALIFIED PROFESSIONAL ANDINSTALLED BY A LICENSED IRRIGATOR.9. CONTRACTOR SHALL PROVIDE BID PROPOSAL LISTINGUNIT PRICES FOR ALL MATERIAL PROVIDED.10. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAININGALL REQUIRED LANDSCAPE AND IRRIGATION PERMITS.MAINTENANCE NOTES1. THE OWNER, TENANT AND THEIR AGENT, IF ANY,SHALL BE JOINTLY AND SEVERALLY RESPONSIBLE FORTHE MAINTENANCE OF ALL LANDSCAPE.2. ALL LANDSCAPE SHALL BE MAINTAINED IN A NEATAND ORDERLY MANNER AT ALL TIMES. THIS SHALLINCLUDE MOWING, EDGING, PRUNING, FERTILIZING,WATERING, WEEDING AND OTHER SUCH ACTIVITIESCOMMON TO LANDSCAPE MAINTENANCE.3. ALL LANDSCAPE AREAS SHALL BE KEPT FREE OFTRASH, LITTER, WEEDS AND OTHER SUCH MATERIALOR PLANTS NOT PART OF THIS PLAN.4. ALL PLANT MATERIAL SHALL BE MAINTAINED IN AHEALTHY AND GROWING CONDITION AS ISAPPROPRIATE FOR THE SEASON OF THE YEAR.5. ALL PLANT MATERIAL WHICH DIES SHALL BEREPLACED WITH PLANT MATERIAL OF EQUAL ORBETTER VALUE.6. CONTRACTOR SHALL PROVIDE SEPARATE BIDPROPOSAL FOR ONE YEAR'S MAINTENANCE TO BEGINAFTER FINAL ACCEPTANCE.GENERAL LAWN NOTES1. CONTRACTOR SHALL COORDINATE OPERATIONS ANDAVAILABILITY OF EXISTING TOPSOIL WITH ON-SITECONSTRUCTION MANAGER.2. CONTRACTOR SHALL LEAVE LAWN AREAS 1" BELOWFINAL FINISHED GRADE PRIOR TO TOPSOILINSTALLATION.3. CONTRACTOR SHALL FINE GRADE AREAS TO ACHIEVEFINAL CONTOURS AS INDICATED ON CIVIL PLANS.ADJUST CONTOURS TO ACHIEVE POSITIVE DRAINAGEAWAY FROM BUILDINGS. PROVIDE UNIFORMROUNDING AT TOP AND BOTTOM OF SLOPES ANDOTHER BREAKS IN GRADE. CORRECT IRREGULARITIESAND AREAS WHERE WATER MAY STAND.4. ALL LAWN AREAS SHALL BE FINE GRADED, IRRIGATIONTRENCHES COMPLETELY SETTLED AND FINISH GRADEAPPROVED BY THE OWNER'S CONSTRUCTIONMANAGER OR LANDSCAPE ARCHITECT PRIOR TO LAWNINSTALLATION.5. CONTRACTOR SHALL REMOVE ALL ROCKS 3/4"DIAMETER AND LARGER, DIRT CLODS, STICKS,CONCRETE SPOILS, ETC. PRIOR TO PLACING TOPSOILAND LAWN INSTALLATION.6. CONTRACTOR SHALL MAINTAIN ALL LAWN AREASUNTIL FINAL ACCEPTANCE. THIS SHALL INCLUDE, BUTNOT BE LIMITED TO: MOWING, WATERING, WEEDING,CULTIVATING, CLEANING AND REPLACING DEAD ORBARE AREAS TO KEEP PLANTS IN A VIGOROUS,HEALTHY CONDITION.7. CONTRACTOR SHALL GUARANTEE ESTABLISHMENT OFACCEPTABLE TURF AREA AND SHALL PROVIDEREPLACEMENT FROM LOCAL SUPPLY IF NECESSARY.SOLID SOD NOTES1. PLANT SOD BY HAND TO COVER INDICATED AREASCOMPLETELY. ENSURE EDGES OF SOD ARE TOUCHING.TOP DRESS JOINTS BY HAND WITH TOPSOIL TO FILLVOIDS.2. ROLL GRASS AREAS TO ACHIEVE A SMOOTH, EVENSURFACE, FREE FROM UNNATURAL UNDULATIONS.3. WATER SOD THOROUGHLY AS SOD OPERATIONPROGRESSES.4. IF INSTALLATION OCCURS BETWEEN SEPTEMBER 1AND MARCH 1, OVER-SEED BERMUDAGRASS SODWITH WINTER RYEGRASS, AT A RATE OF FOUR (4)POUNDS PER ONE THOUSAND (1000) SQUARE FEET.HYDROMULCH NOTES1. CONTRACTOR SHALL SCARIFY, RIP AND LOOSEN ALLAREAS TO BE HYDROMULCHED TO A MINIMUM DEPTHOF 4" PRIOR TO TOPSOIL AND HYDROMULCHINSTALLATION.2. BERMUDAGRASS SEED SHALL BE EXTRA HULLED ANDTREATED LAWN TYPE, SHALL BE DELIVERED TO THESITE IN ITS ORIGINAL UNOPENED CONTAINER ANDSHALL MEET STATE LAW REQUIREMENTS.3. FIBER SHALL BE ONE HUNDRED PERCENT (100%)WOOD CELLULOSE FIBER, DELIVERED TO THE SITE INITS ORIGINAL UNOPENED CONTAINER ASMANUFACTURED BY 'CONWEB' OR EQUAL.4. FIBER TACK SHALL BE DELIVERED TO THE SITE IN ITSORIGINAL UNOPENED CONTAINER AND SHALL BE'TERRO-TACK ONE', AS MANUFACTURED BYGROWERS, INC. OR EQUAL.5. HYDROMULCH WITH BERMUDAGRASS SEED AT A RATEOF TWO (2) POUNDS PER ONE THOUSAND (1000)SQUARE FEET.6. USE A 4'X8' BATTER BOARD AGAINST ALL BED AREAS.7. IF INSTALLATION OCCURS BETWEEN SEPTEMBER 1AND MAY 1, ALL HYDROMULCH AREAS TO BE WINTERRYEGRASS, AT A RATE OF FOUR (4) POUNDS PER ONETHOUSAND (1000) SQUARE FEET. CONTRACTORSHALL BE REQUIRED TO RE-HYDROMULCH WITHBERMUDAGRASS THE FOLLOWING GROWING SEASONAS PART OF THIS CONTRACT.8. ALL LAWN AREAS TO BE HYDROMULCHED SHALLHAVE ONE HUNDRED PERCENT (100%) COVERAGEPRIOR TO FINAL ACCEPTANCE.LANDSCAPE TABULATIONSCITY OF COPPELL, TEXASPERIMETER LANDSCAPE1. Street Frontage: 15' landscape buffer with one (1) tree, 3"cal., per 50 l.f.2. Perimeter Landscape: 10' landscape buffer along propertylines with one (1) tree, 3" cal., per 50 l.f.3. 30" ht. parking lot screen: hedge or berm.CREEKVIEW DRIVE - 891 l.f.RequiredProvided15' landscape buffer 15' landscape buffer(18) trees, 3" cal.(19) trees, 4" cal.*30" ht. screen30" ht. evergreen hedge*REFER TO #1 OF THE VARIANCE REQUEST BELOWEAST PROPERTY LINE - 624 l.f.RequiredProvided10' landscape buffer 10' landscape buffer(13) trees, 3" cal.(27) existing trees, 3"+ cal.30" ht. parking screen 30" ht. evergreen hedgeSOUTH PROPERTY LINE - 558 l.f.RequiredProvided10' landscape buffer 10' landscape buffer(11) trees, 3" cal.(6) existing trees, 3"+ cal.(5) trees, 4" cal.30" ht. screen30" ht. evergreen screenWEST PROPERTY LINE - 1,781 l.f.RequiredProvided10' landscape buffer 10' landscape buffer(36) trees, 3" cal.(36) existing trees, 3"+ cal.**REFER TO #2 AND #3 OF THE VARIANCE REQUEST BELOWINTERIOR LANDSCAPE1. 10% of gross parking area to be landscape.2. One (1) tree per 400 s.f. of required landscape area.3. 12% of total number parking spaces shall be planting islandswith trees.Parking Lot: 121,201 s.f.Parking Spaces: 288RequiredProvided12,120 s.f. (10%)12,766 s.f. (10%)(31) trees, 3" cal.(47) trees, 4" cal.(35) parking islands (35) parking islandsOPEN SPACERequirements: 15% of lot not covered by buildings to belandscape open space. 50% of open space shall be in the frontyard. One (1) tree per 2500 s.f. of open space.Site Area: 465,512 s.f. (10.686 ac)Building Area: 85,193 s.f.Total Lot Area (Exclusive of Building): 380,319 s.f.RequiredProvided57,048 s.f. (15%)116,739 (30%)28,524 s.f. (50%)54,597 s.f.(23) trees, 3" cal.(23) existing trees, 3"+ cal.SUMMARYRequiredProvided(131) trees, 3" cal. (71) trees, 3" cal.(110) existing trees, 3"+ cal.KAHAPL09/11/2018PRUNING AND TRIMMING NOTES1. CONTRACTOR SHALL PRUNE ALL EXISTING TREESON-SITE USING THE FOLLOWING GUIDELINES.2. ALL TREES SHALL BE TRIMMED SO THAT NATURALSHAPES OF THE PLANTS ARE RETAINED.3. DO NOT 'TOP' OR 'HEAD' TREES.4. IF BALLING OR SHEARING OF TREES HAS OCCURRED INTHE PAST, DISCONTINUE THIS PRACTICE AND ALLOWPLANTS TO GROW INTO NATURAL SHAPE.5. REMOVE SUCKERS, DEAD, DYING, DISEASED, BROKENAND / OR WEAK BRANCHES FROM ALL TREES ALONGTHE MAIN TRUNK STRUCTURE AND WITHIN THEBRANCHING AREA.6. CONTRACTOR SHALL PRUNE EXISTING DECIDUOUSHARDWOOD BY REMOVING LOWER LIMBS TO RAISETHE CANOPY. THE BOTTOM OF THE CANOPY SHALLBE RAISED TO 12'-0" ABOVE GRADE FOR DECIDUOUSHARDWOOD TREES, WHEN POSSIBLE. THE INTEGRITYOF THE CANOPY AND STRUCTURE OF THE TREE SHALLBE MAINTAINED. DO NOT CUT OR PRUNE CENTRALLEADERS.7. CONTRACTOR SHALL THIN THE CANOPY BYONE-FOURTH. PRUNE TREE TO EVENLY SPACEBRANCHES WITHIN THE CANOPY WHENEVER POSSIBLE.REMOVE THOSE LIMBS THAT CROSS OTHERS, DOUBLELEADERS AND THOSE THAT EXCESSIVELY EXTENDBEYOND THE NATURAL CROWN OF THE TREE.8. CONTRACTOR SHALL PROVIDE DEEP ROOT FEEDINGAND INVIGORATION OF EXISTING TREES. THIS SHALLBE ORGANIC BASED NUTRIENTS BASED FOR ROOTGROWTH AND LEAF GROWTH STIMULATION.9. CONTRACTOR SHALL BE REQUIRED TO CHIP ALLREMOVED BRANCHES, LEAFS, ETC.VARIANCE REQUEST1. DUE TO THE 30' GAS EASEMENT ALONG CREEKVIEWDRIVE, THE PERIMETER LANDSCAPE TREES ARE PLANTEDRIGHT OUTSIDE OF THE EASEMENT, INSTEAD OF THE 15'SETBACK.2. SCREENING SHRUBS ARE NOT PROVIDED ALONG THEWEST PROPERTY LINE BECAUSE THE PROPERTY BACKSUP TO A HEAVILY FORESTED AREA.3. 36 TREES ARE REQUIRED ALONG THE WEST PROPERTYLINE. WE ARE PRESERVING 27 EXISTING TREES WITHINTHE 10' SETBACK, AND 9 TREES JUST OUTSIDE OF THESETBACK.Exhibit "C" Page 8 of 9
COPPELL, TEXASSAMARITANS PURSEpross design group, incorporated5310 Harvest Hill Road, Suite 180, Dallas, Texas 75230. 972/759-1400PROGRESS SET - FOR REVIEW ONLYISSUEDThese documents areNOT FOR REGULATORY APPROVAL,PERMITTING OR CONSTRUCTION.They were prepared by,or under the supervision of:Kori Ann Haug TX Registered Landscape Architect#224608.29.18STATEOFTEXASTCETHIRCAEPACSDNALDEEGEISRRT4226KORINHAUGAN11/06/18SAMARITANS PURSEFELLOWSHIP ADDITIONLOT 1, BLOCK A10.683 ACRES in theJ. GIBSON SURVEY, ABSTRACT NO. 1716CITY OF COPPELL, DALLAS COUNTY, TEXASZONING: PD-296-LIOWNER / APPLICANTSamaritan's PursePO BOX 3000Boone, North Carolina 28607Telephone (828) 278-1204Contact: Ernest CompitelloENGINEER / SURVEYORSpiars Engineering, Inc.765 Custer Road, Suite 100Plano, TX 75075Telephone: (972) 422-0077TBPE No. F-2121 / TBPLS No. F-10043100Contact: David BondL2.04LANDSCAPE SPECIFICATIONSAND DETAILSKAHAPL09/11/2018PREPARED SOIL MIX PERSPECIFICATIONS; TILL 6" MINIMUMOF PREPARED SOIL MIX INTO6" DEPTH OF EXISTING SOIL3/16" X 4" BLACK EDGING,STAKES ON INSIDE; EDGING SHALLBE 1/2" MAXIMUM HEIGHTABOVE FINISH GRADETOP OF MULCH 1/2"MINIMUM BELOW TOP OFCONCRETE WALK / CURBCONCRETE WALKLAWN / FINISH GRADENOTE:NO STEEL EDGING SHALLBE INSTALLED ALONGSIDEWALKS OR CURBSROOTBALL,DO NOT DISTURBNATIVE SOILPOCKET PLANTINGNOT ALLOWEDSHRUBS / GROUNDCOVER;REFER TO LANDSCAPE PLANTOPDRESS MULCH PERSPECIFICATIONS; 2" MINIMUMSETTLED THICKNESSSCARIFY SIDESREFER TO LANDSCAPE PLANFOR SPACING6"A.E.C.B.I.H.F.G.D.TREE PLANTING DETAIL LEGENDAND NOTESA. TREE: TREES SHALL CONFORM WITHLATEST AMERICAN STANDARD FORNURSERY STOCK. www.anla.orgB. TREE PIT: WIDTH TO BE AT LEAST TWO(2) TIMES THE DIAMETER OF THE ROOTBALL CENTER TREE IN HOLE & RESTROOT BALL ON UNDISTURBED NATIVESOIL.C. ROOT BALL: REMOVE TOP 13BURLAPAND ANY OTHER FOREIGN OBJECT;CONTAINER GROWN STOCK TO BEINSPECTED FOR GIRDLING ROOTS.D. ROOT FLARE: ENSURE THAT ROOTFLARE IS EXPOSED, FREE FROM MULCH,AND AT LEAST TWO INCHES ABOVEGRADE. TREES SHALL BE REJECTEDWHEN GIRDLING ROOTS ARE PRESENT &ROOT FLARE IS NOT APPARENT.E. ROOTBALL ANCHOR RING: REFER TOMANUFACTURER'S GUIDELINES FORSIZING. PLACE ROOTBALL ANCHORRING ON BASE OF ROOTBALL, TRUNKSHOULD BE IN THE CENTER OF THERING.F. 'U' BRACKET.G. NAIL STAKE: REFER TOMANUFACTURER'S GUIDELINES FORSIZING. INSTALL NAIL STAKES WITHHAMMER OR MALLET FIRMLY INTOUNDISTURBED GROUND. DRIVE NAILSTAKES FLUSH WITH "U" BRACKETADJACENT TO ROOTBALL (DO NOTDISTURB ROOTBALL).H. BACKFILL: USE EXISTING NATIVE SOIL(no amendments) WATER THOROUGHLYTO ELIMINATE AIR POCKETS.I. MULCH: DOUBLE SHREDDEDHARDWOOD MULCH 2 INCH SETTLEDTHICKNESS, WITH 2" HT. WATERINGRING; ENSURE THAT ROOT FLARE ISEXPOSED. BELOW GROUND STAKESHOULD NOT BE VISIBLE.J. TREE STAKES:TREE STAKE SOLUTIONS 'SAFETYSTAKE' BELOW GROUND MODELAVAILABLE FROM:Tree Stake SolutionsATTN: Jeff Tuley(903) 676-6143jeff@treestakesolutions.comwww.treestakesolutions.comOR APPROVED EQUAL. TREES SHALL BESTAKED BELOW GROUND WHERE NECESSARY; ABOVE GROUND STAKINGIS EXPRESSLY PROHIBITED.K. IT SHALL BE THE RESPONSIBILITY OFTHE CONTRACTOR TO OBTAIN A COPYOF THE MANUFACTURER'SSPECIFICATIONS PRIOR TOINSTALLATION OF TREE STAKES.CONTRACTOR SHALL ADHERE TOMANUFACTURER'S INSTALLATIONGUIDELINES, SPECIFICATIONS, ANDOTHER REQUIREMENTS FOR TREE STAKEINSTALLATION.01TREE PLANTING DETAILNOT TO SCALE02SHRUB / GROUNDCOVER DETAILNOT TO SCALESECTION 32 9300 - LANDSCAPEPART 1 - GENERAL1.1 REFERENCED DOCUMENTSA. Refer to Landscape Plans, notes, details, bidding requirements,special provisions, and schedules for additional requirements.1.2 DESCRIPTION OF WORKA. Work included: Furnish all supervision, labor, materials, services,equipment and appliances required to complete the work coveredin conjunction with the landscaping covered in thesespecifications and landscaping plans, including:1. Planting (trees, shrubs and grasses)2. Bed preparation and fertilization3. Notification of sources4. Water and maintenance until final acceptance5. Guarantee1.3 REFERENCE STANDARDSA. American Standard for Nursery Stock published by AmericanAssociation of Nurserymen: 27 October 1980, Edition; byAmerican National Standards Institute, Inc. (Z60.1) – plantmaterialB. American Joint Committee on Horticultural Nomenclature: 1942Edition of Standardized Plant Names.C. Texas Association of Nurserymen, Grades and StandardsD. Hortis Third, 1976 - Cornell University1.4 NOTIFICATION OF SOURCES AND SUBMITTALSA. Samples: Provide representative quantities of sandy loam soil,mulch, bed mix material, gravel, crushed stone, steel edging andtree stakes. Samples shall be approved by Owner's AuthorizedRepresentative before use on the project.1.5 JOB CONDITIONSA. General Contractor to complete the following punch list: Prior toLandscape Contractor initiating any portion of landscapeinstallation, General Contractor shall leave planting bed areasthree (3") inches below final finish grade of sidewalks, drives andcurbs as shown on the drawings. All lawn areas to receive solidsod shall be left one (1") inch below the final finish grade ofsidewalks, drives and curbs. All construction debris shall beremoved prior to Landscape Contractor beginning any work.B. Storage of materials and equipment at the job site will be at therisk of the Landscape Contractor. The Owner cannot be heldresponsible for theft or damage.1.6 MAINTENANCE AND GUARANTEEA. Maintenance:1. The Landscape Contractor shall be held responsible for themaintenance of all work from the time of planting until finalacceptance by the Owner. No trees, shrubs, groundcover orgrass will be accepted unless they show healthy growth andsatisfactory foliage conditions.2. Maintenance shall include watering of trees and plants,cultivation, weeding spraying, edging, pruning of trees,mowing of grass, cleaning up and all other work necessaryof maintenance.3. A written notice requesting final inspection and acceptanceshould be submitted to the Owner at least seven (7) daysprior to completion. An on-site inspection by the Owner'sAuthorized Representative will be completed prior to writtenacceptance.B. Guarantee:1. Trees, shrubs and groundcover shall be guaranteed for atwelve (12) month period after final acceptance. TheContractor shall replace all dead materials as soon asweather permits and upon notification of the Owner. Plants,including trees, which have partially died so that shape, size,or symmetry have been damaged, shall be consideredsubject to replacement. In such cases, the opinion of theOwner shall be final.a. Plants used for replacement shall be of the same sizeand kind as those originally planted and shall be plantedas originally specified. All work, including materials,labor and equipment used in replacements, shall carry atwelve (12) month guarantee. Any damage, includingruts in lawn or bed areas, incurred as a result of makingreplacements shall be immediately repaired.b. At the direction of the Owner, plants may be replacedat the start of the next year's planting season. In suchcases, dead plants shall be removed from the premisesimmediately.c. When plant replacements are made, plants, soil mix,fertilizer and mulch are to be utilized as originallyspecified and re-inspected for full compliance with thecontract requirements. All replacements are to beincluded under "Work" of this section.2. The Owner agrees that for the guarantee to be effective, hewill water plants at least twice a week during dry periodsand cultivate beds once a month after final acceptance.3. The above guarantee shall not apply where plants die afteracceptance because of injury from storms, hail, freeze,insects, diseases, injury by humans, machines or theft.4. Acceptance for all landscape work shall be given after finalinspection by the Owner provided the job is in a complete,undamaged condition and there is a stand of grass in alllawn areas. At that time, the Owner will assumemaintenance on the accepted work.C. Repairs: Any necessary repairs under the Guarantee must bemade within ten (10) days after receiving notice, weatherpermitting. In the event the Landscape Contractor does notmake repairs accordingly, the Owner, without further notice toContractor, may provide materials and men to make such repairsat the expense to the Landscape Contractor.1.7 QUALITY ASSURANCEA. General: Comply with applicable federal, state, county and localregulations governing landscape materials and work.B.Personnel: Employ only experienced personnel who are familiarwith the required work. Provide full time supervision by aqualified foreman acceptable to Landscape Architect.C. Selection of Plant Material:1. Make contact with suppliers immediately upon obtainingnotice of contract acceptance to select and book materials.Develop a program of maintenance (pruning and fertilization)which will ensure the purchased materials will meet and / orexceed project specifications.2. Substitutions: Do not make plant material substitutions. Ifthe specified landscape material is not obtainable, submitproof of non-availability to Landscape Architect, togetherwith proposal for use of equivalent material. At the timebids are submitted, the Contractor is assumed to havelocated the materials necessary to complete the job asspecified.3. Landscape Architect will provide a key identifying each treelocation on site. Written verification will be required todocument material selection, source and delivery schedulesto site.4. Measurements: Measure trees with branches and trunks orcanes in their normal position. Do not prune to obtainrequired sizes. Take caliper measurements six inches aboveground for trees up to and including 4" caliper size, andtwelve inches above ground for larger sizes. Measure mainbody of all plant material of height and spread dimensions,do not measure from branch or root tip-to-tip.5. Owner's Authorized Representative shall inspect all plantmaterial with requirements for genus, species, cultivar /variety size and quality.6. Owner's Authorized Representative retains the right tofurther inspect all plant material upon arrival to the site andduring installation for size and condition of root balls androot systems, limbs, branching habit, insects, injuries andlatent defects.7. Owner's Authorized Representative may rejectunsatisfactory or defective material at any time during theprocess work. Remove rejected materials immediately fromthe site and replace with acceptable material at no additionalcost to the Owner. Plants damaged in transit or at job siteshall be rejected.1.8 PRODUCT DELIVERY, STORAGE AND HANDLINGA. Preparation:1. Balled and Burlapped (B&B) Plants: Dig and prepareshipment in a manner that will not damage roots, branches,shape and future development.2. Container Grown Plants: Deliver plants in rigid container tohold ball shape and protect root mass.B. Delivery:1. Deliver packaged materials in sealed containers showingweight, analysis and name of manufacturer. Protectmaterials from deterioration during delivery and while storedon site.2. Deliver only plant materials that can be planted in one dayunless adequate storage and watering facilities are availableon job site.3. Protect root balls by heeling in with sawdust or otherapproved moisture retaining material if not planted within 24hours of delivery.4. Protect plants during delivery to prevent damage to rootballs or desiccation of leaves. Keep plants moist at alltimes. Cover all materials during transport.5. Notify Owner's Authorized Representative of deliveryschedule 72 hours in advance job site.6. Remove rejected plant material immediately from job site.7. To avoid damage or stress, do not lift, move, adjust toplumb, or otherwise manipulate plants by trunk or stems.PART 2 - PRODUCTS2.1 PLANTSA. General: Well-formed No. 1 grade or better nursery grown stock.Listed plant heights are from tops of root balls to nominal tops ofplants. Plant spread refers to nominal outer width of the plant,not to the outer leaf tips. Plants will be individually approved bythe Owner's Authorized Representative and his decision as totheir acceptability shall be final.B. Quantities: The drawings and specifications are complimentary.Anything called for on one and not the other is as binding as ifshown and called for on both. The plant schedule is an aid tobidders only. Confirm all quantities on plan.C. Quality and size: Plant materials shall conform to the size givenon the plan, and shall be healthy, symmetrical, well-shaped, fullbranched and well rooted. The plants shall be free from injuriousinsects, diseases, injuries to the bark or roots, broken branches,objectionable disfigurements, insect eggs and larvae, and are tobe of specimen quality.D. Approval: All plants which are found unsuitable in growth, or arein any unhealthy, badly shaped or undersized condition will berejected by the Owner's Authorized Representative either beforeor after planting and shall be removed at the expense of theLandscape Contractor and replaced with acceptable plant asspecified at no additional cost to the Owner.E. Trees shall be healthy, full-branched, well-shaped, and shall meetthe minimum trunk and diameter requirements of the plantschedule. Balls shall be firm, neat, slightly tapered and wellwrapped in burlap. Any tree loose in the ball or with a brokenroot ball at time of planting will be rejected. Balls shall be ten(10") inches in diameter for each one (1") inch of trunk diameter,measured six (6") inches above ball. (Nomenclature confirms tothe customary nursery usage. For clarification, the term"multi-trunk" defines a plant having three (3) or more trunks ofnearly equal diameter.)F. Pruning: All pruning of trees and shrubs, as directed by theLandscape Architect prior to finalacceptance, shall be executedby the Landscape Contractor at no additional cost to the Owner.2.2 SOIL PREPARATION MATERIALSA. Sandy Loam:1. Friable, fertile, dark, loamy soil, free of clay lumps, subsoil,stones and other extraneous material and reasonably free ofweeds and foreign grasses. Loam containing Dallasgrass orNutgrass shall be rejected.2. Physical properties as follows:a. Clay – between 7-27 percentb. Silt – between 15-25 percentc. Sand – less than 52 percent3. Organic matter shall be 3%-10% of total dry weight.4. If requested, Landscape Contractor shall provide a certifiedsoil analysis conducted by an approved soil testinglaboratory verifying that sandy loam meets the aboverequirements.B. Organic Material: Compost with a mixture of 80% vegetativematter and 20% animal waste. Ingredients should be a mix ofcourse and fine textured material.C. Premixed Bedding Soil as supplied by Vital Earth Resources,Gladewater, Texas; Professional Bedding Soil as supplied byLiving Earth Technology, Dallas, Texas or Acid Gro Municipal Mixas supplied by Soil Building Systems, Dallas, Texas or approvedequal.D. Sharp Sand: Sharp sand must be free of seeds, soil particles andweeds.E. Mulch: Double Shredded Hardwood Mulch, partially decomposed,dark brown. Living Earth Technologies or approved equal.F. Organic Fertilizer: Fertilaid, Sustane, or Green Sense or equal asrecommended for required applications. Fertilizer shall bedelivered to the site in original unopened containers, eachbearing the manufacturer's guaranteed statement of analysis.G. Commercial Fertilizer: 10-20-10 or similar analysis. Nitrogensource to be a minimum 50% slow release organic Nitrogen(SCU or UF) with a minimum 8% sulfur and 4% iron, plusmicronutrients.H. Peat: Commercial sphagnum peat moss or partially decomposedshredded pine bark or other approved organic material.2.3 MISCELLANEOUS MATERIALSA. Steel Edging: All steel edging shall be 3/16" thick x 4" deep x16' long with 6 stakes per section, painted black at the factoryas manufactured by The J.D. Russell Company and under itstrade name DURAEDGE Heavy Duty Steel.B. Staking Material for Shade Trees: refer to details.C. Gravel: Washed native pea gravel, graded 1 inch to 1-1/2 inch.D. Filter Fabric: 'Mirafi Mirascape' by Mirafi Construction Productsavailable at Lone Star Products, Inc., (469) 523-0444 orapproved equal.E. River Rock: 'Colorado' or native river rock, 2" - 4" dia.F. Decomposed Granite: Base material shall consist of a naturalmaterial mix of granite aggregate not to exceed 1/8" diameter insize and shall be composed of various stages of decomposedearth base.PART 3 - EXECUTION3.1 BED PREPARATION & FERTILIZATIONA. Landscape Contractor to inspect all existing conditions andreport any deficiencies to the Owner.B. All planting areas shall be conditioned as follows:1. Prepare new planting beds by scraping away existing grassand weeds as necessary. Till existing soil to a depth of six(6") inches prior to placing compost and fertilizer. Applyfertilizer as per Manufacturer's recommendations. Add six(6") inches of compost and till into a depth of six (6") inchesof the topsoil. Apply organic fertilizer such as Sustane orGreen Sense at the rate of twenty (20) pounds per onethousand (1,000) square feet.2. All planting areas shall receive a two (2") inch layer ofspecified mulch.3. Backfill for tree pits shall be as follows: Use existing top soilon site (use imported topsoil as needed) free from largeclumps, rocks, debris, caliche, subsoils, etc., placed in nine(9") inch layers and watered in thoroughly.C. Grass Areas:1. Blocks of sod should be laid joint to joint (staggered joints)after fertilizing the ground first. Roll grass areas to achievea smooth, even surface. The joints between the blocks ofsod should be filled with topsoil where they are evidentlygaped open, then watered thoroughly.3.2 INSTALLATIONA. Maintenance of plant materials shall begin immediately after eachplant is delivered to the site and shall continue until allconstruction has been satisfactorily accomplished.B. Plant materials shall be delivered to the site only after the bedsare prepared and areas are ready for planting. All shipments ofnursery materials shall be thoroughly protected from the dryingwinds during transit. All plants which cannot be planted at once,after delivery to the site, shall be well protected against thepossibility of drying by wind and Balls of earth of B & B plantsshall be kept covered with soil or other acceptable material. Allplants remain the property of the Contractor until finalacceptance.C. Position the trees and shrubs in their intended location as perplan.D. Notify the Owner's Authorized Representative for inspection andapproval of all positioning of plant materials.E. Excavate pits with vertical sides and horizontal bottom. Treepits shall be large enough to permit handling and plantingwithout injury to balls of earth or roots and shall be of suchdepth that,when planted and settled, the crown of the plant shallbear the same relationship to the finish grade as it did to soilsurface in original place of growth.F. Shrub and tree pits shall be no less than twenty-four (24")inches wider than the lateral dimension of the earth ball and six(6") inches deeper than it's vertical dimension. Remove and haulfrom site all rocks and stones over three-quarter (34") inch indiameter. Plants should be thoroughly moist before removingcontainers.G. Dig a wide, rough sided hole exactly the same depth as theheight of the ball, especially at the surface of the ground. Thesides of the hole should be rough and jagged, never slick orglazed.H. Percolation Test: Fill the hole with water. If the water level doesnot percolate within 24 hours, the tree needs to move to anotherlocation or have drainage added. Install a PVC stand pipe pertree planting detail as approved by the Landscape Architect if thepercolation test fails.I. Backfill only with 5 parts existing soil or sandy loam and 1 partbed preparation. When the hole is dug in solid rock, topsoil fromthe same area should not be used. Carefully settle by wateringto prevent air pockets. Remove the burlap from the top 13 of theball, as well as all nylon, plastic string and wire. Container treeswill usually be root bound, if so follow standard nursery practiceof ‘root scoring’.J. Do not wrap trees.K. Do not over prune.L. Mulch the top of the ball. Do not plant grass all the way to thetrunk of the tree. Leave the area above the top of the ball andmulch with at least two (2") inches of specified mulch.M. All plant beds and trees to be mulched with a minimum settledthickness of two (2") inches over the entire bed or pit.N. Obstruction below ground: In the event that rock, orunderground construction work or obstructions are encounteredin any plant pit excavation work to be done under this section,alternate locations may be selected by the Owner. Wherelocations cannot be changed, the obstructions shall be removedto a depth of not less than three (3') feet below grade and noless than six (6") inches below the bottom of ball when plant isproperly set at the required grade. The work of this section shallinclude the removal from the site of such rock or undergroundobstructions encountered at the cost of the LandscapeContractor.O. Trees and large shrubs shall be staked as site conditions require.Position stakes to secure trees against seasonal prevailing winds.P. Pruning and Mulching: Pruning shall be directed by theLandscape Architect and shall be pruned in accordance withstandard horticultural practice following Fine Pruning, Class Ipruning standards provided by the National Arborist Association.1. Dead wood, suckers, broken and badly bruised branchesshall be removed. General tipping of the branches is notpermitted. Do not cut terminal branches.2. Pruning shall be done with clean, sharp tools.3. Immediately after planting operations are completed, all treepits shall be covered with a layer of organic material two(2") inches in depth. This limit of the organic material fortrees shall be the diameter of the plant pit.Q. Steel Curbing Installation:1. Curbing shall be aligned as indicated on plans. Stake outlimits of steel curbing and obtain Owners approval prior toinstallation.2. All steel curbing shall be free of kinks and abrupt bends.3. Top of curbing shall be 12" maximum height above finalfinished grade.4. Stakes are to be installed on the planting bed side of thecurbing, as opposed to the grass side.5. Do not install steel edging along sidewalks or curbs.6. Cut steel edging at 45 degree angle where edging meetssidewalks or curbs.3.3 CLEANUP AND ACCEPTANCEA. Cleanup: During the work, the premises shall be kept neat andorderly at all times. Storage areas for all materials shall be soorganized so that they, too, are neat and orderly. All trash anddebris shall be removed from the site as work progresses. Keeppaved areas clean by sweeping or hosing them at end of eachwork day.END OF SECTIONExhibit "C" Page 9 of 9
Exhibit "D" Page 1 of 3
Exhibit "D" Page 2 of 3
Exhibit "D" Page 3 of 3
Exhibit "E" Page 1 of 1