DRC ReportPLAT18-08-000265Plan Case ID
CITY OF COPPELL
DRC REPORT
Project Name Sandy Lake Crossing, Lot 3, Bk1COMMENTS
105 S DENTON TAP RDAddress
Case Manager
08/22/2018Application Complete Date
Subdivision Plat - ReplatsPlan Type/Workclass
SWC Sandy Lake and Denton Tap - Capital One. Lot 3, Blk 1, Sandy Lake CrossingProject Description
Agency Reviewed By Review Date Plan Review Details
Building Suzanne Arnold 08/30/2018 No comments on plat
Engineering Kent Collins 08/31/2018 1.Install manhole at connection to existing sanitary sewer
2.The existing access easement to the west is in poor
condition and is not appropriate for construction traffic.
Consider relocating the construction entrance to the main drive
on Denton Tap or the existing (to be removed) driveway onto
Sandy Lake.
3.Please consider addressing the condition of the shared
drive to the west with the owner of the drive given the additional
impact that your proposed development will have.
4.Additional comments will be provided upon receipt of
detailed engineering plans.
Fire Tim Oates 08/29/2018 Hatched area of fire lane is required to be a dedicated fire
lane/mutual access easement
Parks John Elias 08/29/2018 No comments
Planning Mary Paron-Boswell 08/31/2018 General - Plat
- Add zoning to title block
- Vicinity Map: scale at 1”-1000’, add north arrow, shade in site
- Show building setback lines
- Please clarify the fire lane extension out to Denton Tap, what
is new and what is already there
- PZ Chairman signature block should read “approved and
accepted”, not “recommended for approval”
- Remove Mayor’s signature block
- Move signature line for RLC Justin 18 LLC beside Jenna
- Correct PZ secretary signature block area: should read “Block
1, Sandy Lake Crossing, an addition to…” - UNRESOLVED
1 of 1