Loading...
DRC ReportPLAT18-08-000265Plan Case ID CITY OF COPPELL DRC REPORT Project Name Sandy Lake Crossing, Lot 3, Bk1COMMENTS 105 S DENTON TAP RDAddress Case Manager 08/22/2018Application Complete Date Subdivision Plat - ReplatsPlan Type/Workclass SWC Sandy Lake and Denton Tap - Capital One. Lot 3, Blk 1, Sandy Lake CrossingProject Description Agency Reviewed By Review Date Plan Review Details Building Suzanne Arnold 08/30/2018 No comments on plat Engineering Kent Collins 08/31/2018 1.Install manhole at connection to existing sanitary sewer 2.The existing access easement to the west is in poor condition and is not appropriate for construction traffic. Consider relocating the construction entrance to the main drive on Denton Tap or the existing (to be removed) driveway onto Sandy Lake. 3.Please consider addressing the condition of the shared drive to the west with the owner of the drive given the additional impact that your proposed development will have. 4.Additional comments will be provided upon receipt of detailed engineering plans. Fire Tim Oates 08/29/2018 Hatched area of fire lane is required to be a dedicated fire lane/mutual access easement Parks John Elias 08/29/2018 No comments Planning Mary Paron-Boswell 08/31/2018 General - Plat - Add zoning to title block - Vicinity Map: scale at 1”-1000’, add north arrow, shade in site - Show building setback lines - Please clarify the fire lane extension out to Denton Tap, what is new and what is already there - PZ Chairman signature block should read “approved and accepted”, not “recommended for approval” - Remove Mayor’s signature block - Move signature line for RLC Justin 18 LLC beside Jenna - Correct PZ secretary signature block area: should read “Block 1, Sandy Lake Crossing, an addition to…” - UNRESOLVED 1 of 1