Loading...
DRC CommentsPD17-12-000210 Plan Case ID CITY OF COPPELL DRC REPORT Project Name Sherrill Acres, Lot 2B, Bk1COMMENTS 1703 E BELT LINE RD Address Case Manager 01/23/2018 Application Complete Date Planned Development - Conceptual PD Plan Type / Workclass PD - retain existing office on Lot 2B1 and future office on Lot 2B2 Project Description Agency Review Date Plan Review Details Building Reviewed By Suzanne Arnold 01/17/2018 Engineering George Marshall 01/23/2018 No comments Fire Tim Oates 01/17/2018 1. Additional comments will be generated at Detail Site Plan Review Parks 01/17/2018 No comments at this time Planning John Elias Marcie Diamond NOTE - ALL PLANS This request is for Planned Development District-293-LI with a Detail Plan for the existing medical office building on Lot 2B1 and a Concept Plan for Lot 2B2 for future office building. – Correct all lot and zoning references accordingly on all sheets and replat. Site Plan 1. Add a note that Detail Building Elevations will be submitted with the Detail Site Plan for Lot 2B2. 2. Verify parking, I count 41 spaces not 40. for lot 2B1 3. There was discussion at the last meeting about the property onwer constructing the H&B Trail, and it appears to be indicated as such on the plans. Please provide clairty as how and when this trail will be constructed. 4. Variance Request - #1 - Lot 2D? 5. Correct the setbacks to those indicated to those requested as part of this PD. Landscape Plan - NOTE - ALL PLANS This request is for Planned Development District-293-LI with a Detail Plan for the existing medical office building on Lot 2B1 and a Concept Plan for Lot 2B2 for future office building. – Correct all lot and zoning references accordingly on all sheets 1 of 1 The address on the second building will be 1707 E. Belt Line Most of the landscape calculations are incorrect. Given these lots are less than 2 acres in size, a maximum of 30 % of the lot is required to be landscaped. However, which requirements (perimeter, interior lot and non-vehicular) are being met and are requesting variances must be more clearly identified, as well as existing vs. proposed trees, etc. Marcie met with Tom Pritchett, and reviewed the requirements on 1/24/18