Loading...
DRC ReportPD18-04-000235 Plan Case ID CITY OF COPPELL DRC REPORT Project Name Duke Lesley Addn, Lot 1R and 8R, BkCCOMMENTS Address Marcie Diamond Case Manager 04/18/2018 Application Complete Date Planned Development - Detail PD - New/Not In Conformance Plan Type / Workclass PD-221R3R3 Sun Holdings - Park West Project Description Agency Reviewed By Review Date Plan Review Details Building Suzanne Arnold No Comments at this time Engineering George Marshall Site Plan: -Add Impervious and pervious site calculation for each lot to the site data table. -Show the accurate ROW as filed to Date. -The sidwalk apears to just end in the NW corner. -FDC to be located adjacent to FH Utility Plan: -Fix ROW line label on the utility plan. -Provide preliminary DAM, SD & GR -The utility crossings need to be added to the Infrastructure package. I would expect to see a plan revision submitted for approval and issued to the contractor. Fire Tim Oates 1. Fire riser room shall be a minimum of 64sf (8'x8') 2. FDC shall be located adjacent to a fire hydrant, 3' - 6' from fire lane easement. 3. Show proposed fire hydrants along Private Drives "B" and "C" 4. Fire hydrant on east side of development is shown to be a public hydrant. Parks John Elias 04/23/2018 No comments Planning Marcie Diamond Zoning Case # PD-221R3R3-HC Concept Plan (CP-2) 1. Revise the Concept Plan to better designate which lots have been approved, are under consideration, and still in concept plan stage. Similar to Sheet A-2 dated 1/28/16, include an updated data table and PD Conditions and proposed building footprints 2. Designate which (all remaining?) infrastructure that will be built with these two lots and/or if they are being built with Phase 1. 3. The Phase 3 Concept Plan indicates the extension on the M.A.E. from Lot 1 to Lot 8 to the property to the north – include that connection on this Concept Plan. 5. Fix the over-lapping labels 6. Correct the vicinity map – the Map on the landscape plan is more accurate. 7. Include the deceleration lane required for Private Drive "C" as included in original PD Concept Plan – Phase 3 - Do not need this sheet, as the Site Plan (C-2.0) provides the information needed Site Plan (C-2.0) Lot 1 1. Include the deceleration lane required for Private Drive "C" as included in original PD 1 of 2 PD18-04-000235 Plan Case ID CITY OF COPPELL DRC REPORT Project Name Duke Lesley Addn, Lot 1R and 8R, BkCCOMMENTS 2. Add dimensions for the extension of the mutual access easement 3. Indicate the infrastructure to be constructed in this phase 4. Revise the data table to include Proposed Use: Retail and Restaurant 5. Add dimensions of landscape buffer areas Lot 8 1. Lot 8R-1, should be platted as a separate lot to be designated as an “X” common area lot to be maintained by the P.O.A. similar to Lot 1X. 2. Add number of parking spaces 3. Provide a 10’ wide landscape buffer between the parking and the property lines and private drives 4. Landscape islands need to be a minimum of a 150 square feet. Landscape Plans Add Plant List and Landscape Calculations to Sheet L1.01 and eliminate sheets L1.02 and L1.03 Sheet L1.01 1. Reflect site plan revisions as required above on the landscape Plan. 2. Hedgerows are required adjacent to all parking abutting property lines. 3. Minimum 10’ wide landscape buffer required adjacent to property lines. 4. Trees are required at the end of each parking row, and the island needs to be a minimum of 150 square feet. 5. Minimum caliper of overstory trees is 3” at the time of planting. 6. Landscape Calculations – Lot 1 a. Verify perimeter calculations - my calculations = 12,400 sq. ft. required b. Non-vehicular = 11,623 sq. ft. required. c. # of trees appears to be correct, however all required trees need to be overstory w/3” caliper or 3 ornamental = 1 overstory 7. Landscape Calculations – Lot 8 a. Public patio? 2 of 2