Loading...
DRC Comments SeptemberT H £ • C 1 T Y • 0 F COPPELL 9 g 1 Plan Case ID Address Plan TvpetWorkclass Application Complete Date Case Manager Project Description Agency Building Engineering Fire Parks Planning CITY OF COPPELL PD18-08-000269 455 N FREEPORT PKWY Planned Development - Conceptual PD 08/22/2018 Marcie Diamond PD -295 -HC Archway 121 Reviewed By Suzanne Arnold Kent Collins Tim Oates John Elias Marcie Diamond DRC REPORT COMMENTS T H £ • C i T Y • 0 F COPPELL T ', o E x it s t a g Project Name Prologis , Lot 3 , 2R, BkB Review Date Plan Review Details 08/30/2018 No building issues on site plan. 08/31/2018 1. A Traffic Impact Analysis will be required to determine if deceleration lane and/or other driveway/circulation improvements are required. 2. All utilities internal to the site will be private. 1. Provide a looped, private water line system to serve the site. 2. If maintenance is required on the water line, a portion of the fire lane could be disrupted. Consider locating WL in an area that 3. A TIA will be needed to evaluate if additional right -turn decal lanes will be needed 4. Additional comments will be provided upon receipt of detailed engineering plans. 08/30/2018 1. Fire lane radii should be a minimum of 30ft inside, 54ft outside. 2. Fire hydrants are required to be spaced at 300ft intervals 3. Private fire lines/hydrant system is required. 08/29/2018 1. Concept tree survey unacceptable, it needs to be done by a L.A. or Arborist familier with the City of Coppell Tree Preservation Ordinance. 08/30/2018 Opening Statement: The HC District (the zoning on this property) is intended primarily as a high intensity area permitting a mixed-use for office, commercial -retail, and highway oriented uses, such as hotels, restaurants, and low and mid -rise offices, and should be located generally along high-volume thoroughfares. The site characteristics for each area should be designed in a manner to create an attractive appearance from I.H. 635 and S.H. 121, and an impressive gateway into the community. Because these areas are designated as major thoroughfare entry points, emphasis has been placed on building arrangement, setbacks, parking, and landscape treatment, which are intended to be elements influencing the character of entrance into the city. It is the intention of the "highway commercial" zoning district to create an attractive and unique entrance into the city. The 2030 Master Plan echo's that intent, see attached description of the Freeway Special District. The exhibits submitted do not appear to address the purpose and intent of the Zoning or the Future Land Use designation on this property. 1 of 3 Technical Comments: Winkelmann Letter T H £ • C 1 T Y • 0 F COPPELL T k � 8 q 6 9 g 1 CITY OF COPPELL DRC REPORT T H £ • C i T Y • 0 F COPPELL T *�' o * E x it s t a g Plan Case ID PD18-08-000269 COMMENTS Project Name Prologis , Lot 3 , 2R, BkB 1. Requested variances to HC — The four variances (A -D) are requesting that the uses required to have SUP's should be permitted "by right" subject to staff review only. • staff will not support these variances as the specified purpose of requiring SUP's for gas stations, restaurants, and hotels is to allow City Council, after recommendation by the Planning and Zoning Commission to determine the appropriateness of the use, its character and impact on surrounding properties. • This Concept Plan, if approved will require Detail Site Plans to be approved through public hearing process for all uses that require SUP's in the Zoning Ordinance. 2. Development Code Variances: A. What is the rationale for requesting 10 -foot building setbacks and HC requires 20 feet? One area on the Concept Plan indicates a 5' setback. B. Minimum 15 Landscape setback is required along streets, why is there a request to violate that landscape setback with parking? HC District and Freeway Special District Land Use Designation encourages a greater setback (30-50 feet) along these major thoroughfares. C. In response to this request, there is an opportunity to adjust landscaping numbers if a significant landscape feature is provided (common/gathering area, fountain, public art, etc.) or similar compensation... not just a few trees in unusable corners of the property. D. Need to establish % of front yard parking per lot/site plan to be considered as a PD condition. Concept Site Plan 1. Relabel this sheet as Concept Plan for PD295-HC 2. Remove meets and bounds and extraneous Abbreviation Legend 3. Add a detail list of requested variances to the Zoning Ordinance, the HC District regulations and the Landscape Ordinance 4. Preliminary Site Data Table — revise to Concept Site Data Table a. Tract E — Hotel — parking 131*** and see breakout —what breakout? 5. Why does the fire lane not connect in front of the proposed hotel? 6. Needs to be fire lane and mutual access easements. 7. More clearly indicate the Hike and Bike trail along Freeport Parkway. Landscape Plan 1. Add tract numbers to track with Concept Plan 2. Apparently the landscape plan for the gas station site was "cut and pasted" into the overall plan and is very difficult to read. 3. There needs to be a consistent landscape design thorough out the project. As stated above, some variations to the amount of landscaping per lot could potentially be justified if compensated with overall design and amenity package. As presented, is not acceptable. 4. More clearly indicate the Hike and Bike trail along Freeport 2of3 T H £ • C 1 T Y • 0 F COPPELL 9 g 1 CITY OF COPPELL DRC REPORT T H £ • C i T Y • 0 F COPPELL E x it s t a g Plan Case ID PD18-08-000269 COMMENTS Project Name Prologis , Lot 3 , 2R, BkB Parkway. Tree survey 1. Detail tree survey, prepared by a registered Arborist or Landscape Architect and will be required at the time of Detail Plan approval. Concept Elevations callaway architecture letter - the theme as described is not apparent in the exhibits submitted. There is also a statement that the Landscaping will meet city requirements, which it clearly does not. QT elevations — While the building material may comply with the masonry requirements of the Zoning Ordinance, the red awning, accents and signage does not comply. Also, the building will essentially be hidden from the prominent intersection of SH 121 and Freeport Parkway by the 1,150 square foot gas canopy. There are no elevations of this included in the submittal, or a perspective indicating the view of this development from this intersection. Restaurant Elevations — 1 . The elevations indicate a patio, but none is shown on the Concept Site Plan. 2. Yellow awnings — violate the provision of the Zoning Ordinance, and again is contrary to the Theme as described by callaway. Hotel Elevations — FYI — 4 story hotel would most likely not meet the requirements of either the Zoning Ordinance or the Building Code. In Summary, the staff cannot support the approval of this Concept Plan. 3of3