Loading...
Staff ReportITEM # 6 Page 1 of 8 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT PD-297-HC, Whitestone P&Z HEARING DATE: December 20, 2018 C.C. HEARING DATE: January 8, 2019 STAFF REP.: Marcie Diamond, Assistant Director of Community Development/Planning LOCATION: S.H. 121 and Sandy Lake Road, N.E.C. SIZE OF AREA: 16.57 acres of property CURRENT ZONING: HC (Highway Commercial) REQUEST: A zoning change request from HC (Highway Commercial) to PD-297-HC (Planned Development 297-Highway Commercial) to establish a Concept Site Plan for hotel, retail, restaurants and office uses on 16.57 acres of property and a Detail Site Plan for two Hotels, one being a Residence Hotel on approximately 6 acres. APPLICANT: Owner: Engineer: Victor Munson Alek Strimple Ferguson Reality Co. Jones Carter 6060 N Central Expressway 6509 Windcrest Drive Suite 560 Suite 600 Dallas, Texas 75206 Plano, Texas 75024 214-237-2920 972-265-7174 Email: vmunson@flash.net astrimple@jonescarter.com HISTORY: In 2003, the Planning and Zoning Commission called a series of public hearings to determine the appropriate zoning along the limited frontages the city of Coppell has along freeways. The intent of this initiative, which was adopted by City Council, was to revise the 1996 Future Land Use Plan and to rezone these properties from Light Industrial to Highway Commercial to “allow the land owners significant flexibly in development options to take advantage of the highway access while assuring compliance with the vision for the City’s most visible corridors”. The 2030 Comprehensive Plan reinforced this vision by designating this property as Freeway Special District. HISTORIC COMMENT: This property does not have any historic significance. ITEM # 6 Page 2 of 8 TRANSPORTATION: SH 121 is a state highway, recently built to standard. Sandy Lake Road is a six-lane divided thoroughfare. SURROUNDING LAND USE & ZONING: North: vacant land & office/warehouse – HC and LI South: DCCC – PD- 224R- HC East: office/warehouse – LI West: SH 121 and vacant land COMPREHENSIVE PLAN: The Coppell 2030 Comprehensive Master Plan shows this property as suitable Freeway Special District. DISCUSSION: This is a two-part request. Part one is to establish a Concept Site Plan for hotel, retail, restaurants and office uses on 16.57 acres of property; and part two is a Detail Site Plan for two hotels, one being a Residence Hotel on approximately 6 acres. As mentioned in the history section of this report, this property was a part of a city- initiated effort, 15 years ago, to establish Highway Commercial (HC) zoning along the freeway frontages to enhance development standards, ensuring that the limited freeway frontage and entry portals into the City of Coppell are of the high-quality developments envisioned. Specifically, the stated purpose of the Highway Commercial District includes: To create “….an impressive gateway into the community. Because these areas are designated as major thoroughfare entry points, emphasis has been placed on building arrangement, setbacks, parking, and landscape treatment, which are intended to be elements influencing the character of entrance into the city” The 2030 Master Plan adopted in 2011, echoed that intent by designating this area as Freeway Special District, which also speaks to site elements including: “Focal Points - Corners of major intersections should include a “focal point” near major intersections and around “gateway” areas. Focal points should include vertical architectural features, fountains, public art, and/or public plazas. “Setbacks - A minimum of 50-ft of privately owned land along the freeway/highway right-of-way should be free of buildings and parking, with a total of 80-ft in width landscaped, including privately owned land and available public highway right-of-way, and “Building Form and Character - Buildings within a development should have a coherent architectural theme in terms of mass, height, rooflines, and materials”. ITEM # 6 Page 3 of 8 Concept Plan This property is located at the prominent corner of Sandy Lake Road and S.H. 121. The purpose of the Concept Plan is to establish the preliminary layout of uses and circulation patterns to support the first phase of development, which are two hotels at the eastern portion of the property, closest to the existing office/warehouse developments. To the south of this property directly across Sandy Lake Road is Dallas County Community College. They are contemplating an expansion to their facilities in the near future. Therefore, a combination of retail, office and hotel uses are will complement the college and is in accordance with the types of uses envisioned in the Comprehensive Plan. The two hotels will occupy almost 6 acres, however, there are no specific retail and office users currently identified for the remaining 11 acres of this property. Detail Site Plan approvals will be required for subsequent developments and must adhere to the HC District regulations as amended and/or augmented in the conditions incorporated in this Planned Development. Conditions such as future development will have a coherent architectural theme and consistent sign package, will ensure that this property is a well-planned development. One of the key features of this overall development will be the trees preservation amenity consisting of over 40 oak and elm trees located in the midsection of the property. This preserve will be adjacent to the future retail development and will have pedestrian connection to the main driveway and the hotel development. This preserve will be established either as an easement or a common area lot during the platting process. Another amenity will be the main north/south driveway, the main access to the hotels and the retail, it is proposed to contain an 8’-wide landscaped median. An enhanced paving design is proposed in the main “intersection” of this driveway and the hotels. The northbound lane will be a full 24 feet in width and will serve as a fire lane and mutual access easement for this property. There will be a POA (Property Owners Association) established to maintain the common areas and provide architectural controls. A Traffic Impact Analysis has been submitted for this property and the specific conditions of approval are listed in the Recommendation section of this report. Monument Pylon Signs Included in this Concept Plan is a request for three- 40-foot tall, 1,040 square foot multi-tenant pylon signs. They are proposed to be illuminated from an internally lit cornice and contain five signage panels. The uppermost, 80-square foot panel, is proposed to contain a digital marquee, and the four remaining 50-square foot panels are noted to be externally illuminated. Two of these signs are proposed to be located along Sandy Lake and S.H. 121 within Phase 1, and the third sign at the intersection of S.H.121 and Sandy Lake Road in Phase 2. The maximum retail signage permitted by the Sign Ordinance is one 60 square feet per two-acre lot, with a maximum height of 6 feet. The applicant has stated that these signs are being proposed to “collectively organize current and future tenant signage”, however there is no commitment to not request additional monument signs as the retail lots develop in the future. Staff cannot support these signs which substantially exceed the standards of the Sign Ordinance, including the proposed digital marquee is specifically prohibited in the ordinance. ITEM # 6 Page 4 of 8 PD Conditions As mentioned above, this application includes PD conditions to address architectural compatibly in design and attached signs for the future retail developments. An additional request is to allow additional colors than currently permitted in the HC District: Exterior wall surfaces should consist of no more than three colors; a base color, and/or a trim color, and/or an accent color, the second color up to only five percent, and an accent color on up to only one percent of any one façade. Variances to this provision of the Ordinance may be recommended but must be reviewed on a case by case basis. The particular variances are discussed below specific to the branding of these particular hotels. Future variances will be reviewed at the time of Detail Site Plan approval. The final variance being requested as a PD condition is not to provide the 30-50- foot setbacks as encouraged by the 2030 Master Plan along the freeway frontages. Although the 20-foot wide landscape buffer, as required by the HC District, is being provided along SH 121, it is recommended at the time of Detail Site Plan approval for the remaining 11 +/- acres consideration be given to providing additional buffers along the freeway as well as a focal point feature at the intersection of SH 121 and Sandy Lake Road, other than a 40’ tall non-compliant multi-tenant sign. Detail Site Plan – Home2 Suites This proposed 126 room hotel meets the minimum requirements of the Hotel Ordinance, except for: Sec. 12-30-18. (2) c. Not more than 22 room units per acre, and additional amenity as required for a Residence Hotel, and the HC District masonry requirements. There is some question whether this would be classified or function as a Residence Hotel as defined in the Ordinance. It must be noted that none of the 126 rooms in this hotel will have separate bedrooms, and they will have limited kitchen facilities (microwave, full size refrigerator and dishwasher) which does not include a stove top. These two factors detract from the suitability for long term-occupancy which can occur in residence hotels. Data provided by the prospective owner/operator on the Home2 Suites he owns at DFW Airport South, indicate that over 90% of the guests stayed 1-4 nights from July-December 2018. It is reasonable to assume similar lengths of stay at this location. Although it generally meets the definition of Residence Hotels per the Hotel Ordinance, as written, it appears to function and be designed as a typical short term stay hotel and it would not reasonably convert to an apartment complex where density is an issue. It must also be noted that if classified as a Residence Hotel, four amenities are required, instead of three. This plan is providing three amenities, a pool, weight room and the plaza. The variance to the density requirement (Sec. 12-30-18. (2) c) and the additional amenity area are being requested. ITEM # 6 Page 5 of 8 Given the location, surrounding zoning and development patterns, augmented by the operational functions of this flag, it is improbable that this conversion to apartments would occur. However, staff cannot support the variance to this provision of the Hotel Ordinance. If deemed appropriate, the granting of this variance would ultimately be the purview of the City Council. Building Elevations and Signage As discussed under the Concept Plan, the Home2 Suites is requesting a variance to the HC District regulations to allow three brick colors plus two accent colors. The main brick color is same as the main brick color as the LaQuinta. However, an additional variance request is to allow for a reduction in the masonry requirement in the front (west elevation). The elevations indicate almost 40% stucco. Staff cannot support the use of stucco for more than the 20% of the façade as it is classified as a non-masonry product. A light grey brick could be substituted, while still allowing for the limited green stucco stripe as a true accent/architectural feature along the north façade. The attached signage appears to be in compliance with the provision of the sign ordinances, final determination will be made at the time of sign permit. Detail Site Plan – LaQuinta This proposed 125 room hotel meets all the requirements of the Hotel Ordinance, however the applicant is seeking an exception to the masonry requirements. Required - Home2 Suites – Residence Hotel Provided minimum of 125 rooms 126 minimum room size of 285 square feet 323 interior climate-controlled corridor √ lobby/waiting/atrium areas – min 750 sq. ft. or 5 sq. ft. per guest room 750 Restaurant - limited service √ porte-cochere or other covered area √ Meeting space 1,200 sq. ft. 1,245 minimum of 2 acres 2.275 Min. separation of 1,500 other residence hotel √ Contain Kitchen Facilities √ Maximum 22 dwelling units per acre X (55 du/ac) Optional Amenities – include min. of 4 Indoor/outdoor pool (min 600 sq. ft. water surface area) 600 sq. ft. Equipped Weight room/fitness center (min. 600 sq. ft.) 600 sq. ft. Play ground Sports court Jogging trail (min ¼ mile) Gift/pantry Snack Shop (min. 300 sq. ft.) Outdoor Plaza Area, minimum 1,000 square feet, exclusive of pool. 3,400 sq. ft. ITEM # 6 Page 6 of 8 Building Elevations and Signage This design of the LaQuinta is their most recent prototype. While staff can support the inclusion of a blend of three grey and two red/brown tones, staff cannot support the significant variance to the masonry requirements to allow the use of “Sintered Stone Compact Surface Panels” from both a building and fire code perspective. These surface panels do not meet the definition of masonry as defined in the Zoning Ordinance or Building Code. Given the nature of these materials, the Fire Marshal would require the fire lane to be located out of the ‘collapse zone’ (1.5 times the height of the building away from the building) due to the potential of these panels falling off the building if the building catches on on fire. In conversations with the applicant, it is staff’s understanding that in other municipalities, a standard brick has been used instead of these panels on LaQuinta hotels, and is recommended here. The attached signage appears to be in compliance with the provision of the sign ordinances, final determination will be made at the time of sign permit. Detail Landscape Plans The Detail Site Plans for the two hotels include Detail Landscape Plans. The two sites are consistent in design and use of materials. A 20-wide buffer with 19 overstory trees (preserving two existing trees) will provide a visual buffer between this development and the existing office warehouse, at least for the lower floors of the hotel. Adjacent to the west elevations of the hotels is an 8-foot wide median in the divided driveway which will be planted with evergreen shrubs and accent perennial plants (Overstory trees were not permitted due to this being a fire lane). This will address the requirement for a10-foot front yard buffer. The overstory trees that would normally be along the perimeter of the property have been placed along the front façade of the building. Given the slight deficits in overall landscaped areas all trees have been upsized to 4” caliper to address the adjustments in the landscaping. Required – LaQuinta Provided minimum of 125 rooms 125 minimum room size of 285 square feet 335 interior climate-controlled corridor √ lobby/waiting/atrium areas – min 750 sq. ft. or 5 sq. ft. per guest room 820 Restaurant - limited service √ porte-cochere or other covered area √ Meeting space 1,200 sq. ft. 1,200 minimum of 2 acres 2.4 Optional Amenities – include min. of 3 Indoor/outdoor pool (min 600 sq. ft. water surface area) 600 sq. ft. Equipped Weight room/fitness center (min. 600 sq. ft.) 600 sq. ft. Play ground Sports court Jogging trail (min ¼ mile) Gift/pantry Snack Shop ( min. 300 sq. ft.) Outdoor Plaza Area, minimum 1,000 square feet, exclusive of pool. 2,617 ITEM # 6 Page 7 of 8 Staff is recommending APPROVAL of PD-297-HC, Whitestone, subject to the following conditions: 1. Concept Plan Conditions: a. At the time of Detail Site Plan approval for the remaining 11 +/- acres, consideration be given to providing additional buffers along the freeway as well as a focal point feature at the intersection of SH 121 and Sandy Lake Road, other than a 40’ tall non-compliant multi-tenant sign. b. Detail Site Plans shall meet all development code requirements unless specifically varied at that time. c. There shall be a coherent architectural theme and Detail Site Plans shall include elevation facades to assure architectural compatibility. Variances to Sec. 12-22-5. Type of exterior construction relating to the color of wall surfaces will be reviewed at the time of Detail Site Plan approval. d. There shall be a consistent sign package for all attached signs and signs to be compliant with the provisions of the Sign Ordinance. e. This property shall to be replatted to provide building sites, necessary easements, tree preservation area and Property Owners Association. f. The following traffic improvements are required to support this development, based on the T.I.A. submitted and shall be at the time of the platting of the property: i. Provide an eastbound left turn lane with 150 feet of storage on Sandy Lake Road at Royal Lane. ii. Provide a northbound right turn lane with 425 feet of deceleration including 100-foot taper on SH 121 Northbound Frontage Road at Driveway 2. iii. Provide a northbound right turn lane with 300 feet of deceleration including 100-foot taper on SH 121 Northbound Frontage Road at Driveway 3. iv. Modify existing signal at the intersection of Sandy Lake Road and Royal Lane to accommodate for southbound leg and eastbound left turn lane including a new traffic signal pole for the southbound direction and pedestrian signals for all legs. In addition, v. To construct one additional northbound through lane to the development at the intersection of Sandy Lake and Royal Lane. vi. The addition of a deceleration lane for the right turn into the Royal Lane Driveway. g. At the time of platting Fire lane shall be stubbed-out at intersections to Phase 2 to allow connection of future buildings. h. Property Owners Association shall maintain all common areas, including the landscape medians, tree preservation area pedestrian areas, and all enhanced paving surfaces. Property Owners Association documents areas shall be submitted for staff review prior to the filing of the Final Plat. i. Additional comments will be generated at the time of Detail Engineering review. 2. Detail Plan – Home2-Suites, staff is recommending DENIAL of variance to Sec. 12-30-18.(2) c. Not more than 22 room units per acre, and the deficit in one amenities, however, in the event that City Council grants a variance to this section, then the following conditions would apply: a. Allowance to the variance in the number of colors of masonry and accent materials, subject revisions to the materials the reduction in the stucco areas to be compliant with the 80% masonry requirement. b. All signs shall be compliant with the Sign Ordinance. 3. Detail Plan – LaQuinta, staff is recommending Approval, subject to: a. Allowance to the variance in the number of colors of masonry and accent materials, subject revisions to the materials to replace the Sintered Stone Compact Surface Panels with brick. b. All signs shall be compliant with the Sign Ordinance. c. Allowing for a one parking space deficit, with 131 parking spaces being provided. ITEM # 6 Page 8 of 8 ALTERNATIVES: 1. Recommend approval of the request 2. Recommend disapproval of the request 3. Recommend modification of the request 4. Take under advisement for reconsideration at a later date ATTACHMENTS: 1. Hotel Narrative 2. Concept Plan 3. Detail Site Plan – Hotels 4. Landscape Plan 5. Tree Survey 6. LaQuinta Elevations 7. LaQuinta First Floor Plans 8. LaQuinta 2-5 Floor Plans 9. Home2Suites Elevations 10. Home2Suites First Floor Plans 11. Home2Suites 2-5 Floor Plans 12. Home2Suites – room layout 13. Street Cross Section 14. Intersection Design 15. 40-foot Multi-Tenant Sign