DRC Report 1SITE18-03-000230Plan Case ID
CITY OF COPPELL
DRC REPORT
Project Name , Lot 2R, BkBCOMMENTS
505 AIRLINE DRAddress
Case Manager
03/22/2018Application Complete Date
Site Plan - Site Plan (Minor & Administrative)Plan Type/Workclass
to add OH door, ramp, driveway, paving and fenceProject Description
Agency Reviewed By Review Date Plan Review Details
Building Suzanne Arnold 03/26/2018 Fence permit required
Engineering George Marshall 03/23/2018 1) The minimum driveway radius is 30' in the subdivision
ordinance.
2) Need to address pavement transition on the south end near
the entrance.
3) Will the unusable parking space be hatched/striped?
4) Install 5' sidewalk along Enterprise.
Fire Tim Oates
Parks John Elias No comments
Planning Mary Paron-Boswell General - - Stripe an additional parking spot to meet the
ordinance requirements
- provide a fence detail
- provide a sidewalk along Enterprise Dr. Connecting sidewalk
to be constructed by the City with Airline Dr. project. -
UNRESOLVED
General - - update letter to include "exit only" for new overhead
door and drive onto enterprise. - UNRESOLVED
1 of 1