DRC Comments.1stPLAT19-03-000319Plan Case ID
CITY OF COPPELL
DRC REPORT
Project Name , Lot , BkCOMMENTS
Address
Case Manager
03/20/2019Application Complete Date
Subdivision Plat - ReplatsPlan Type/Workclass
Addition of buildings and expansion of cemeteryProject Description
Agency Reviewed By Review Date Plan Review Details
Building Suzanne Arnold
Engineering Kumar Gali
Fire Tim Oates 03/28/2019 1. Not the entire MAUE is fire lane, show the fire lane easement
by shading.
Parks John Elias 03/25/2019
Planning Mary Paron-Boswell General - - may need to rezone from 2F-9 to LI (along MHP)
- show setbacks
- 30' front on Ruby and Freeport
- 50' along MHP
- 10' sides (areas not adjacent to MHP)
- label fire lane easement and width
- label/differentiate between existing and proposed easements
- screening adjacent to mobile homes on the east? Prior SUP
said metal fence.
- acreage in description does not match title block, nor the
SUP application
- fix title bck to read "Minor Plat/Replat"
- Add north arrow to vicintiy map and scale at 1"= 1000'
- Show the 100 yr floodplain
- extend MAE out to drives
- Engineering comments:
1. We own the property and maintain the utilities but we are
noting easements to make sure we don’t build anything on top
of the utilities?
2. There are existing sewer and storm sewer utilities that do
not have dedicated easements
3. No comments on the proposed utility easements -
UNRESOLVED
1 of 1