Loading...
DRC Comments.1stPLAT19-03-000319Plan Case ID CITY OF COPPELL DRC REPORT Project Name , Lot , BkCOMMENTS Address Case Manager 03/20/2019Application Complete Date Subdivision Plat - ReplatsPlan Type/Workclass Addition of buildings and expansion of cemeteryProject Description Agency Reviewed By Review Date Plan Review Details Building Suzanne Arnold Engineering Kumar Gali Fire Tim Oates 03/28/2019 1. Not the entire MAUE is fire lane, show the fire lane easement by shading. Parks John Elias 03/25/2019 Planning Mary Paron-Boswell General - - may need to rezone from 2F-9 to LI (along MHP) - show setbacks - 30' front on Ruby and Freeport - 50' along MHP - 10' sides (areas not adjacent to MHP) - label fire lane easement and width - label/differentiate between existing and proposed easements - screening adjacent to mobile homes on the east? Prior SUP said metal fence. - acreage in description does not match title block, nor the SUP application - fix title bck to read "Minor Plat/Replat" - Add north arrow to vicintiy map and scale at 1"= 1000' - Show the 100 yr floodplain - extend MAE out to drives - Engineering comments: 1. We own the property and maintain the utilities but we are noting easements to make sure we don’t build anything on top of the utilities? 2. There are existing sewer and storm sewer utilities that do not have dedicated easements 3. No comments on the proposed utility easements - UNRESOLVED 1 of 1