City Council Memo1
MEMORANDUM
To: Mayor and City Council
From: Mindi Hurley, Director of Community Development
Date: May 12, 2020
Reference: Consider approval of PD-221R3R4-HC, (Hilton Garden Inn), a zoning change request
from PD-221R3R3-HC to PD-221R3R4-HC, to approve a Detail Site Plan for a five story,
approximately 77,500 square-foot hotel on 2.657 acre of land located between Point West
Boulevard and S. Belt Line Road, north of I-635, at the request of Jones Carter.
2030: Business Prosperity
Executive Summary:
This is part of the third phase of development that was approved in 2018 for a hotel. This proposal is to
approve a Detail Site Plan for the construction of a 77,507-square foot, five-story Hilton Garden Inn hotel
and associated parking.
Introduction:
This proposal is to construct an approximately 77,507 square foot, 5-story Hilton Garden Inn hotel,
containing 134 rooms. The building exterior is to be finished with a combination of EIFS accented with
a charcoal color stone. The EIFS finish is proposed to be painted in their prototype colors with various
finishes. This is an interior lot with access from Belt Line Road, Point West Blvd and I-635 via multiple
access easements. In addition to the standard hotel requirements, the hotel amenities proposed include:
a pool (600-sf); an equipped weight-room/fitness center (900-sf); and an outdoor plaza area (1,400-sf).
The site will have 141 parking spaces and one loading zone for deliveries. The property will need to be
replatted and delineate the mutual access, fire lane and other easements. They are asking for several
exceptions which are listed in the PD Conditions recommended for approval by the Planning and Zoning
Commission.
Analysis:
On April 16, 2020, the Planning and Zoning Commission recommended APPROVAL of PD-221R3R4-
HC, subject to the following conditions:
1. There may be additional comments at the time of Building Permit and Detail Engineering
Review.
2. The property shall be platted to provide required mutual access, fire lanes and easements prior
to development. A mutual access easement should be shown on the northwest corner of the site.
3. To allow a 5-foot landscape buffer along the southern property line.
4. To allow four colors and greater coverage of secondary colors to match the hotel prototype
colors.
5. To allow for one loading zone.
2
Legal Review:
This did not require city attorney review
Fiscal Impact:
None
Recommendation:
The Planning and Zoning Commission recommended APPROVAL of the PD request subject to staff
conditions listed above.
Attachments:
1. PZ Staff Report
2. Approved Concept Plan
3. Site Plan