Loading...
PZ Staff ReportITEM # 6 Page 1 of 4 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE No.: PD-301R-HC, Dave and Buster’s Headquarters P&Z HEARING DATE: March 19, 2020 C.C. HEARING DATE: April 14, 2020 STAFF REP.: Mary Paron-Boswell, Senior Planner LOCATION: Southeast corner of Dividend Drive and S. Belt Line Road SIZE OF AREA: 16.72 acres CURRENT ZONING: A (Agricultural) REQUEST: A (Agricultural) to PD-301R-HC (Planned Development-301Revised-Highway Commercial), to approve a Conceptual Site Plan for four office buildings and a Detail Site Plan for an approximate 78,400-square-foot office building on 16.72 acres of land located at the southeast corner of Dividend Drive and S. Belt Line Road, at the request of Beltline Properties, LLC, being represented by WGI Inc. APPLICANT: CONSULTANT PROPERTY OWNER WGI Inc Beltline Properties, LLC 8144 Walnut Hill Lane, Suite 903 306 W 7th St., Suite 500 Dallas, TX Fort Worth, TX 76102 Megan Silva J. Walker Holland (214) 307-4767 (817) 355-1050 Megan.Silva@wginc.com HISTORY: Over the last decade or so, this property has been intermingled with other surrounding sites conceptually but has not had any plans or change in zoning approved. For example, this property was part of the original conceptual plan for QuikTrip but was never approved or materialized. The QuikTrip plans went through several iterations, withdrawals, and denials before being approved by City Council. This property was also part of a zone change request to provide multi- family, as part of a “mixed-use” product. This request was not approved. A Springhill Suites hotel was approved at the southern end of this site along Hackberry Road. HISTORIC COMMENT: This property has no noted historical significance. TRANSPORTATION: Adjacent to S. Belt Line Road (P6D – six-lane divided thoroughfare) and Dividend Drive. ITEM # 6 Page 2 of 4 SURROUNDING LAND USE & ZONING: North: QuickTrip (PD-237R4-HC); Vacant Land (A - Agricultural) South: Springhill Suites Hotel (PD-237R8-HC); City of Dallas (Cypress Waters) East: City of Dallas (Cypress Waters) West: Caliber Home Loans Office & Point West Development (PD-221-HC) COMPREHENSIVE PLAN: Coppell 2030, A Comprehensive Master Plan, shows this property as appropriate for Freeway Special District. DISCUSSION: This is one of the few properties located on the east side of S. Belt Line Road and just north of I-635, that is in Coppell. The eastern perimeter of the site is the City limit line between the City of Coppell and City of Dallas (Cypress Waters Development.) To the west is Caliber Home Loan Office Building and the new Point West development which is under construction and contains retail, restaurants, and hotels. This 16.722-acre tract stretches along the east side of Belt Line Road from Dividend Drive to Hackberry Road. The proposed concept plan identifies four office buildings, ranging in size from approximately 19,000 square feet, up to approximately 78,400 square feet. The smaller of the buildings would be located at the southern portion of the site adjacent to the Springhill Suites Hotel which is under construction. The largest of the buildings is located on the northern portion of the site and is the building with a Detail Site Plan proposed for it. There is a plat also on the agenda as companion item. The plat will create two lots, one of which is proposed to be six acres in size and will house the 78,400 sf two-story office headquarters for Dave and Busters; and the other will contain the remaining 10.722 acres, which can be subdivided as development occurs. Building Dave and Busters is planning to move their headquarter operations from Dallas to Coppell and are proposing to construct a 78,400 square foot two-story office building. The building will serve to house their existing work force as well as future growth. Part of the building will also house their test kitchen. A large outdoor open space area is proposed behind the building. This area is planned to be programmed, and plans are being worked on but have not been finalized. Initial thoughts for this area are to provide a space for employees to sit, eat, take a break and possibly have some games set up for recreation. One of the PD conditions will be that staff review and approve the programmed open space. The proposed Dave and Buster’s building will be a painted tilt wall building accented with running bond reveals. Tall vertical windows will allow more light into the building and help frame the building on all facades, with vertical spandrel glass accenting the entrance and corners of the building. The front façade will have a two-tiered metal canopy feature with perforated panels and louvered metal sides with metal support columns. The canopy will provide both shade from the sunlight as well as providing architectural detail. One of the PD conditions they are ITEM # 6 Page 3 of 4 requesting is to allow for more than 50% glass on three elevations. As currently depicted, the north elevation has 51% glazing, 59% on the east and 53% on the west. The premise of the concept plan is that the remaining buildings share a consistent theme and style with this development. Another PD condition is that the development of all future lots require a detail site plan. Sign The developer is proposing to have a monument sign, 60 square feet in size, which compliments the building’s design. It will consist of a concrete base and will have a metal panel and sign cabinet. The Dave and Buster’s logo will be on the sign along with the address. The sign will not be illuminated. Although no specific wall signs were presented with this submittal, they will most likely be adding a wall sign and the applicant understands that all signs will need to comply with ordinance requirements. Landscaping This property is designated as Freeway Special District on the future Land Use Map. The proposed multi-story office use is compatible with the Freeway Special District. The corner of S. Belt Line Road and Dividend Drive will feature a focal point area where they are proposing to put a statue. One of the PD conditions will require that the details of the focal point area require staff approval and shall be in place prior to the CO of the building. The landscape buffer along Belt Line Road will be enhanced and will range from 40-50 feet in width. The landscape buffer is proposed to be 30 feet in width along Dividend Drive. The Concept Plan identifies that the landscaping will be extended down S. Belt Line as future lots develop. Due to the driveway, waterline, sanitary sewer line, sidewalk and other utility easements along the front of the property, nine overstory trees will be placed in this landscape buffer along with a variety plants, shrubs and ground cover placed in a meandering landscape bedded area. The same design is proposed to extend along the Dividend Drive frontage. Additional overstory trees are proposed along the remaining perimeter and parking areas. The programmed open space at the rear of the property will add additional usable green space to the site. This site exceeds the amount of landscaping required by ordinance. In total they are planting 91 trees and approximately 31% of the site will be landscaped. Access Two driveway entrances are proposed for this site. One is proposed along Dividend Drive, mid-block by the median opening. The second drive will be on S. Belt Line Road. Staff required a Traffic Impact Analysis (TIA) for this site. The study concluded that a deceleration lane would be required at the S. Belt Line entrance, to be constructed with this development. A right turn lane at the corner of Belt line Road and Dividend Drive will also be constructed by the City with the reconstruction of S. Belt Line Road. Overall this site is well suited for this development, with good access to the highway and frontage roads. ITEM # 6 Page 4 of 4 RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff is recommending APPROVAL of the request subject to: 1. There may be additional comments during the Detail Engineering review. 2. A plat will be required. 3. A deceleration lane right turn lane be constructed on S. Belt Line Road with this project. 4. PD Conditions: a. To allow more than 50% glass on three facades b. All signage shall comply with City regulations c. Plans for the Open Space shall require staff approval d. The focal point statue shall require staff approval and shall be in place prior to the issuance of a CO for the building. e. A Detailed Site Plan shall be required for the development of future lots. ALTERNATIVES: 1. Approval of the request 2. Denial of the request 3. Modification of the request 4. Take the case under advisement to a future date ATTACHMENTS: 1. Concept Site Plan 2. Detail Site Plan 3. Landscape Plan & Mitigation 4. Elevations 5. Dumpster & Signage