Loading...
DRC CommentsSITE19-10-000396Plan Case ID CITY OF COPPELL DRC REPORT Project Name , Lot , BkCOMMENTS 412 W SH 121Address Case Manager 10/28/2019Application Complete Date Site Plan - Site PlanPlan Type/Workclass RS DEnton Tap 121 Addition - Two buildings on 2.493 ac Lot 1 Blk AProject Description Agency Reviewed By Review Date Plan Review Details Building Suzanne Arnold 10/31/2019 No comment Engineering Cole Baker 11/01/2019 Detailed engineering review will be performed at a later date. Site Plan: - Make easements match plat - Add impervious/pervious area to site plan - See public sewer easement comment on plat Preliminary Utility Plan: - Water loop behind the buildings cannot be a public line. It will need to be a private fire loop with detector check valves, and there will need to be separate domestic and irrigation connections to the public line. - The overall cost of the water loops for Lot 1 and Lot 2 could be reduced by constructing one large loop around Lot 1 and Lot 2. - Fire hydrants on the fire loop will be private and will not require easements. Water meters will need to be moved to an easement along the public line. - Public water line in front of the buildings needs to be in a separate utility easement outside of pavement Preliminary Drainage Plan: - Coordinate with TxDOT for connection to their storm drain General - N/A - UNRESOLVED General - N/A - UNRESOLVED Engineering Kumar Gali Fire Tim Oates 11/01/2019 1. Fire Lane shall continue along the North side of the project from the 'existing building' to the new buildings. Needs to be shown on plat and site plan - add note 'this portion will be constructed prior to 412 or 424 SH 121 being built'. Parks John Elias 11/01/2019 1. Tree Removal Permit required prior to start of construction. 2. Tree Mitigation numbers are incorrect. 3. Please remove all unprotected trees and cedars form the Tree Disposition Plan. All tree are protected at 10" DBH and greater. Planning Mary Paron-Boswell 11/01/2019 General - You are short on landscaping. Please revise plans. numbers do not correspond to landscape plans - UNRESOLVED General - - no metal awnings, can use canvas - consider lightning grounding rods for tower elements - UNRESOLVED General - - show setbacks - numbers don't match the other exhibit 1 of 2 SITE19-10-000396Plan Case ID CITY OF COPPELL DRC REPORT Project Name , Lot , BkCOMMENTS The tree mitigation numbers are not correct. Please contact John Elias to confirm the tree mitigation numbers. - UNRESOLVED General - - show setbacks - Front 60 ft - Side 30 ft - Rear 20 ft - list height of proposed masonry wall - vicinity map 1"=1000' - Lot coverage is max 50% Title block on all sheets should include: - Project name - Plat name - Lot #, Block # - Acreage, zoning - address if available Show radii for fire lane on SP-2 - UNRESOLVED 2 of 2