DRC CommentsPLAT19-09-000379Plan Case ID
CITY OF COPPELL
DRC REPORT
Project Name , Lot 2R, BkBCOMMENTS
Address
Case Manager
09/16/2019Application Complete Date
Subdivision Plat - ReplatsPlan Type/Workclass
Prologis Park One Twenty One (QT) - 2 lotsProject Description
Agency Reviewed By Review Date Plan Review Details
Building Suzanne Arnold
Engineering Cole Baker 09/19/2019 General - N/A - UNRESOLVED
General - N/A - UNRESOLVED
Engineering Kumar Gali
Fire Tim Oates 1. Show width of fire lane on the site plan and plat.
2. Utility Plan shows sprinkler/FDC entering the west side of
the building but the riser room is on south side?
3. Building is less than 100,000sf so 4-inch FDC underground
is required.
Parks John Elias 1. Tree Removal Permit required prior to start of construction.
2. The tree survey only shows trees to be removed. Are there
any trees preserved, if so the need to be included on the tree
survey.
3. Tree mitigation calculations on sheet TM1 are incorrect.
Planning Mary Paron-Boswell General - Plat
- show fire lane radii
- label widths of easements and fire lanes
- label setbacks
correct title block
- correct plat name in PZ Secretary signature block
- Add zoning to lots (PD-295-HC)
- fill in ownership info in owners certificate area
- bold and box note 2 in General Notes
- Correct street name - should be Northwestern Drive
- label all easments and fire lanes, label widths -
UNRESOLVED
General - Tree Survey
- Tree survey must be done by arborist.
- Fees to be paid prior to plat filing.
- show lot in its entirety. - UNRESOLVED
1 of 1