Loading...
DRC CommentsPLAT19-09-000379Plan Case ID CITY OF COPPELL DRC REPORT Project Name , Lot 2R, BkBCOMMENTS Address Case Manager 09/16/2019Application Complete Date Subdivision Plat - ReplatsPlan Type/Workclass Prologis Park One Twenty One (QT) - 2 lotsProject Description Agency Reviewed By Review Date Plan Review Details Building Suzanne Arnold Engineering Cole Baker 09/19/2019 General - N/A - UNRESOLVED General - N/A - UNRESOLVED Engineering Kumar Gali Fire Tim Oates 1. Show width of fire lane on the site plan and plat. 2. Utility Plan shows sprinkler/FDC entering the west side of the building but the riser room is on south side? 3. Building is less than 100,000sf so 4-inch FDC underground is required. Parks John Elias 1. Tree Removal Permit required prior to start of construction. 2. The tree survey only shows trees to be removed. Are there any trees preserved, if so the need to be included on the tree survey. 3. Tree mitigation calculations on sheet TM1 are incorrect. Planning Mary Paron-Boswell General - Plat - show fire lane radii - label widths of easements and fire lanes - label setbacks correct title block - correct plat name in PZ Secretary signature block - Add zoning to lots (PD-295-HC) - fill in ownership info in owners certificate area - bold and box note 2 in General Notes - Correct street name - should be Northwestern Drive - label all easments and fire lanes, label widths - UNRESOLVED General - Tree Survey - Tree survey must be done by arborist. - Fees to be paid prior to plat filing. - show lot in its entirety. - UNRESOLVED 1 of 1