CC Action
July 11, 2019
Michael Cole
Stacked Storage
1208 Twin Creek
Southlake, Texas 76092
RE: PD-299-C, Stacked Storage
Dear Mr. Cole,
This letter is to inform you that on Tuesday July 9, 2019, the zone change request for PD-299-C
(Planned Development-299-Commercial) to allow 5,100 square feet of office and 17,000 square feet
of storage area, with a maximum building height of 35’, and to amend the Land Use Map of Coppell
2030, A Comprehensive Master Plan from “Urban Residential Neighborhood” to “Freeway Special
District” on approximately 2.7 acres, located at the northeast corner of SH 121 and Coppell Road, was
approved by the Coppell City Council (6-1) subject to the following conditions:
1. The property shall be platted prior to the issuance of a building permit.
2. A tree removal permit shall be required prior to the removal of any trees on the site.
3. There will be additional comments at the time of detail engineering review and building
permit.
A. Hours of Operation will be:
Mon. - Fri.: 9 a.m. - 6 p.m.
Saturday: 8 a.m. - 4 p.m.
Closed Sundays (*Limited access may be available outside of normal
business hours by appointment only)
Access to storage pods will be controlled and limited to business hours only, 24hr
Access will not be permitted.
B. Prohibited materials - Any item or material that is considered illegal, hazardous or alive
will not be permitted, including Hazardous, combustible and toxic materials,
chemicals, food products, animals, plants, weapons, etc.
C. Absolutely NO outside storage will be permitted at any time
D. The property owner (Stacked Storage) will build and maintain a 6-foot tall, double-
thick masonry brick screening wall which will match the existing Willow Park entry
wall.
a. This screening wall shall replace the existing wood fences, in coordination with
the abutting property owners.
b. The wall shall be constructed in accordance with the City of Coppell Standards.
Page 2
PD-299-C
c. This wall shall be maintained by the PD-299-C property owners (Stacked Storage
and/or future property owners) in perpetuity.
E. The building materials shall be as indicated on the building elevations, including: Painted
Concrete Panels (Dark Tan, Dark Brown, Dark Gray, Light Tan), modular Brick –
Ebony, Limestone Block (Coronado Stone) – Cream, and Metal Trim (Dark Gray, White,
Black)
F. All site lighting provided will meet the City of Coppell Development Code article 36
standards for glare and lighting.
G. All attached signs and the monument sign shall be in accordance with the Sign
Regulations.
In order to prepare an ordinance, we need to assemble appropriate documentation. When the ordinance
has been completed and Council has approved it, a copy will be sent to you. As a reminder, the zoning
change sign can now be returned to the Planning Department for your deposit reimbursement.
If you have any questions, please contact me at (972) 304-3675.
Sincerely,
Mary Paron-Boswell, AICP
Sr. Planner
cc: File
Cc: Jimmy Fechter