Loading...
P&Z Action Final Plat EXTENSION.2020 April 23, 2020 Blackberry Farms, LLC Terry Holmes Holmes Builders 225 State Highway 121, Suite 120 Coppell, Texas 75019 Terry@holmesbuilders.com RE: Plat Extension for Blackberry Farm, Phase 1, Final Plat Dear Mr. Holmes, This letter is to inform you that on Thursday, April 16, 2020, the Coppell Planning & Zoning Commission approved a 6-month extension for the Final Plat approval for Phase 1 of Blackberry Farm, to permit the development of 54 single-family lots and eight (8) common area lots, on 36.5 acres of property located at the north side of Sandy Lake Road, 750 feet northeast of Starleaf Road. As a reminder, the following conditions need to be added to the Final Plat prior to filing: 11. No alley will be provided for any Lots. 12. There will be a minimum side yard setback of 5 feet on Lots 1 through 20, Block D. 13. The Homeowners Association shall be responsible to maintain the stabilization along the creek bank of Denton Creek from erosion. Each Lot Owner shall be notified and provide a hold harmless agreement by separate instrument that the City and Developer are not liable for future erosion of the creek bank. 14. The Homeowners Association shall be responsible to maintain the storage basins/ponds being constructed with the development. Additionally: A. A drainage flood study, approved by the City Engineer, will be required prior to the filing of a Final Plat for Phase 1 of this development. B. Stream bank erosion protection will require approval by the US Army Corps of Engineers. No Final Plats may be filed or work shall commence prior to that approval C. Additional language being added addressing the preservation/conservation of the open space lots (Common Areas Lots 6X, 7X and 9X) D. The property owner will coordinate with city staff to ensure that there is a sidewalk connection from this property to Kimbel Court to provide pedestrian access to Lakeside Elementary school. E. Correct note #6 to delete Lot 16, as this lot has been incorporated into Lot 6X. This Final Plat must be submitted for signatures by City Officials within six months (on or before December 20, 2020), or it shall be deemed null and void and resubmittal shall be required. After city signatures have been procured, it is the applicant's responsibility to file the document with the Dallas County Plat Records Department. Please see the enclosed instructions for recording plats. If you have any questions, please contact the Planning Department at (972) 304-3678. Sincerely, Mary Paron-Boswell, AICP Sr. Planner