Loading...
Staff ReportITEM # 5 Page 1 of 4 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT PD-224R2-HC, Northlake College North Campus P&Z HEARING DATE: June 20, 2019 C.C. HEARING DATE: July 9, 2019 STAFF REP.: Mary Paron-Boswell, Sr. Planner LOCATION: S.W.C. of Sandy Lake Road and Royal Lane SIZE OF AREA: 34.8 acres of property CURRENT ZONING: PD-224R-HC REQUEST: A zoning change request from PD-224R-HC (Planned Development 224 Revised- Highway Commercial) to PD-224R2-HC (Planned Development 224 Revision 2- Highway Commercial), to revise the Concept Master Plan and attach a Detail Site Plan to permit a 146,655 square foot building expansion in conjunction with Construction Education Foundation (CEF) on approximately 34.8 acres. APPLICANT: Owner: Architect: Dallas County Community College Scott Wegener 1601 S Lamar Street Beck Architecture Dallas, TX 75215 1807 Ross , Suite 500 Attn: Dr. Christa Slejko Dallas, TX 75201 214-378-1500 214-303-6627 scottwegener@beckarchitecture.com HISTORY: This property was originally zoned Light Industrial in the 1980’s, but in 2003 the Planning and Zoning Commission recommended that both the Future Land Use Map and the zoning classification for this piece be changed to encourage the development of well-designed retail, commercial and/or office development. City Council approved the changes in 2003. In 2007, Dallas County Community College District requested a zone change from Commercial (C), Highway Commercial (HC) and Light Industrial (LI) to Planned Development (PD-224- HC) to allow for Phase One construction of a multi-purpose building, associated parking and easements on approximately 10 acres of the property for a new college campus. In 2011 the PD was amended to allow a gas valve site to support th e gas pipeline installed parallel to SH 121. ITEM # 5 Page 2 of 4 HISTORIC COMMENT: This property does not have any historic significance. TRANSPORTATION: State Highway 121, is a state highway, recently built to standard. Sandy Lake Road is a four-lane divided thoroughfare in a six-lane R.O.W. Royal Lane is a four-lane divided thoroughfare in a six-lane R.O.W. SURROUNDING LAND USE & ZONING: North: Vacant (Proposed Hotels/Office/Retail); PD-297-HC (Highway Commercial) South: Office Warehouse; LI (Light Industrial) East: Office Warehouse; LI (Light Industrial) & PD-194R5-LI West: SH 121& Self Storage; C (Commercial (S-1204)) COMPREHENSIVE PLAN: The Coppell 2030 Comprehensive Master Plan shows this property as suitable for Freeway Special District with a designation for other school facilities. DISCUSSION: This request is to revise the Concept Master Plan and attach a Detail Site Plan to permit a 65,500 square footprint (146,655 sf – includes exterior canopy) expansion in conjunction with the Construction Education Foundation (CEF) on approximately 34.8 acres. The Concept Master Plan identifies future phases which contain additional buildings and a parking garage. Construction of future phases will be subject to future plan review and compliance with the regulations in place at that time. This project is a joint venture with the Construction Education Foundation (CEF). The intent is to offer residential and commercial construction courses for students wanting a career in the construction industry. This facility will replace the West Campus facility located in Irving and will house classrooms and laboratories providing both management and skill-based education for the construction industry. The building will pursue LEED- Silver certification. The proposed new building will be home to the construction sciences and will also include four lab rooms including an outdoor lab and 27 indoor classrooms, and additional offices for staff. A wide range of courses will be offered including Construction Management, Construction Technology, Electrical Technology, Carpentry, and Plumbing and Pipefitting. Additionally, the facility is planned to have a large outdoor laboratory space shared by the trades for events, workshops and mockup projects and will be screened from TX-121. Currently all the existing parking is located along the Royal Lane frontage. These spaces will remain while an additional 117 spaces will be constructed just south of the existing, along Royal Lane. All of these spaces will utilize the existing driveways on Royal Lane. The school has indicated that based on the number of students and faculty, based on zoning regulations. This will meet their parking needs and exceeds the 410 parking spaces required. A technical variance is being requested to allow for more than 50% of parking in the front yard. Staff has no ITEM # 5 Page 3 of 4 objection to this variance request since this site has three frontages and the majority of the parking is existing. The Landscape Plan is generally compliant with the provisions of the Landscape Ordinance. Landscaping in some areas of Phase 1 will need to be replaced due to trees/plants dying over time. Additional modifications to the required landscaping is necessary where existing and proposed utility easements, and a gas pipeline exists. Perimeter landscape areas with street trees are provided along Sandy Lake Road, Royal Lane and the portions of SH 121 outside of the easements. A landscape berm with wildflowers and trees is being provided along a portion of the SH 121 frontage. This will also act as screening for this facility. Interior landscaping of the site is being exceeded both in area (50%) and the number of trees provided (21 provided vs 15 required). The non-vehicular open space area is five times greater that what is required by ordinance. They are providing 96 new trees to the site. The existing building is located to the north of the site, close to Sandy Lake Road. The proposed building will be located south of the existing building closer to the SH 121 frontage road. With this new construction, fire lanes will be extended and looped around the new building. The building will be a combination of two types of brick, in addition to glass and metal panels. The material for the building will generally match the existing North Campus color palette and include Brick B1 Cocoa Brown; B2 Whitestone; Aluminum Composite Panel ACP 1 Umbra Grey; ACP 2 Oyster White; Kawneer Curtain Wall System 1600 Anodized Aluminum. The building will have a flat roof with mechanical equipment being screened. Overall, the building is 82% masonry, with both the north (93%) and south (83%) elevations exceeding the 80% masonry requirement. The District is requesting some relief on the east and west elevations, which calculate slightly below the required 80% amount of masonry (75% and 68% respectively). Staff has no objection to this request. In terms of signage, the District is proposing to upgrade their existing monument sign in the near future and will comply with sign regulations to city requirements. All proposed signage for the building itself will also comply with sign regulations. Staff is recommending APPROVAL of PD-224R2-HC, Northlake College North Campus, subject to the following conditions: 1. Master Concept Plan Conditions: a. At the time of Detail Site Plan approval for the remaining acreage, the plans shall meet all development code requirements unless specifically varied at that time. b. There shall be a coherent architectural theme and Detail Site Plans shall include elevation facades to assure architectural compatibility. 2. Detail Plan – Construction Science Building: a. Additional comments will be generated at the time of Detail Engineering review. b. Approval of the of the variances to the masonry veneer requirements and the location of more than 50% of the parking in the front yard along Royal Lane. c. Label screening wall and enclosure materials. ITEM # 5 Page 4 of 4 d. All signs shall be compliant with the Sign Ordinance. e. Gas tank enclosure area shall be well ventilated, have a canopy over the top and shall have a temperature gauge. ALTERNATIVES: 1. Recommend approval of the request 2. Recommend disapproval of the request 3. Recommend modification of the request 4. Take under advisement for reconsideration at a later date ATTACHMENTS: 1. Narrative 2. Parking letter 3. Conceptual Master Plan 4. Detail Site Plan 5. Tree Survey 6. Landscape Plan 7. Elevations & Rendering 8. Material Board