Admin Approval Setback Encroachment 9-1-2021GjI
-'G
NEW
PROJECT LOCATION:
V
V
N
N
wo
()
O
a
HWY 121
kixc�l
4 1114
H RAMr
{�14 p 114 F i C 14 I 11i 4 i9
6S FRONT RD SETBACK - - - -PROP.THTTYp)
- — PROP. FH (TYP)
SIGNAGE
P
SIGNAGE
fi �s ti Ii li JALIG�HT `LXTUR ; TYP
13 6 8
TOP OF PARAPET -48'8• J+
�'t •`''S"•' TOP OF MECHANICAL
! SCREENWALL 6384
TOP OF ENTRY 63'.6"
450 N. FREEPORT
TOP OF MECHANICAL 3 LEVEL OFFICE
scREENWALL 63'-60 ARCH 1ST FLR - 100'-0"
ENG, IST FLR - 497.50' AMSL
Loi\DlplG CbCK
I / I,01
GARBAGE SCREEN WALL
TOP OF PARAPET -488•
-... .. -
.6 66Lgm ' 7
7 ��� � E
§ PROP. REMOTE FOC PROP. FH (TYP)
PROP. FH (TYP) a SIGNAGE
21OZOMLAf
13
'v
(14
.
TOP OF PARAPET -48'8• J+
�'t •`''S"•' TOP OF MECHANICAL
! SCREENWALL 6384
TOP OF ENTRY 63'.6"
450 N. FREEPORT
TOP OF MECHANICAL 3 LEVEL OFFICE
scREENWALL 63'-60 ARCH 1ST FLR - 100'-0"
ENG, IST FLR - 497.50' AMSL
Loi\DlplG CbCK
I / I,01
GARBAGE SCREEN WALL
TOP OF PARAPET -488•
-... .. -
.6 66Lgm ' 7
7 ��� � E
§ PROP. REMOTE FOC PROP. FH (TYP)
PROP. FH (TYP) a SIGNAGE
21OZOMLAf
_ 30'SIDE CK-
YARDSETRA_ ' 1
_ _ _ - _ _ - _ _ _ _-
6� 91 14
U2 -DI
ADJACENT PR
PD -272 -LI
450 N FREEPORT- PROJECT LOCATION
NORTHWESTERN DRQ EXISTING SIDEWALK
TRUE
NORTH
91
5
i
§ 9
, P
JL 11 GARAGE -1
ENTRANCeI—�
I I
11
FH
I c 13 V
465657UNCOVERED SURFACE P.S.
15
mj
26
4 23
9
n 21 21 a II 24 p 21 a
pp
pp
pp
`s pp
I pp
I pp
Dp
2 LEVEL GARAGE I I
ARCH 1ST FLR - 99'-0" d p
ENG. 1 ST FLR - 496.25' $VISL
no
99
pp �
Ip o
pl
9
LOP
LOLL
g �
EXISTING SIDEWALK
2
6
6
4.
HWY 121 FRONTAGE
NEW
. APL
9�
oz
LF
Administrative
Approva)
9/l/2021
01 SITE PLAN
SCALE: 1•=30'-0•
NEW
W FRONT YARD SETBACK
BUILDING EXTENTS
02SETBACK ENCROACHMENT
SCALE: 3116"= lt-O%
TRUE
NORTH
PLANNED DEVELOPMENT CONDITIONS TABLE SITE DATA VARISPACE COPPELL
EXISTING ZONING 'HC'HIGHWAY COMAtERCW. DISTRICT
NADDITION, LOT 1, BLOCK A
SIGA SHOW ONSGNAGEEXHIBITT SIGNAGE ALLOWED FOR ENANFMONUMENiSIGNANDENTRYMONUMENT PROPOSEDUSES OFFICE, PARKING GARAGE 450 N FREEPORT
• VEHICULAR DIRECTIONAL SIGNAGE AS SHOWN ON SIGNAGE EXHIBIT
• 18•XSPARKINGALLOWED ATHEADTOHEAD PARKING STALLS ONSURFACE LOT SQUARE FOOTAGE 185,700SF OFFICE BUILDING/ 82,70 SF PARKING PREPARED BY:
• 18' X SPARKING ALLOWED AT HEAD TO HEAD PARKING STALLS IN PARKING GARAGE BUILDING AREA 63,8005E FOOTPRINT 186,637 TOTAL SF
• ONE LOADING DOCK ZONE PER EVERY 70,000 GSF OF OFFICE BOKA POWELL
• CONCRETE PANELS, CEMENT PLASTERING AND METAL PANEL FINISHES AS NOTED ON BUILDING HEIGHT 48'-9'TOP OF PARAPET 167,,7• TOP OF SCREEN WALL 8070 PARK LANE #300
ELEVATIONS AND SAMPLE BOARD
REQUIREDPARKING 619 REQUIRED/ 728 PROVIDED DALLAS, TX 76231
LITCOVERAGE 428560 LOT TOTAL SF/111,600 SF BUILDING + GARAGE =.26 LOT COVERAGE 972-701-9000
FLOOR AREA RATIO .42 PockefY&Okaprn 11mm
PLANNED DEVELOPMENT SITE PLAN VARISPACE 09.01.2021 PD1.01
13
'v
(14
�.
�.....�
LIGHT
13
14
!
_ 30'SIDE CK-
YARDSETRA_ ' 1
_ _ _ - _ _ - _ _ _ _-
6� 91 14
U2 -DI
ADJACENT PR
PD -272 -LI
450 N FREEPORT- PROJECT LOCATION
NORTHWESTERN DRQ EXISTING SIDEWALK
TRUE
NORTH
91
5
i
§ 9
, P
JL 11 GARAGE -1
ENTRANCeI—�
I I
11
FH
I c 13 V
465657UNCOVERED SURFACE P.S.
15
mj
26
4 23
9
n 21 21 a II 24 p 21 a
pp
pp
pp
`s pp
I pp
I pp
Dp
2 LEVEL GARAGE I I
ARCH 1ST FLR - 99'-0" d p
ENG. 1 ST FLR - 496.25' $VISL
no
99
pp �
Ip o
pl
9
LOP
LOLL
g �
EXISTING SIDEWALK
2
6
6
4.
HWY 121 FRONTAGE
NEW
. APL
9�
oz
LF
Administrative
Approva)
9/l/2021
01 SITE PLAN
SCALE: 1•=30'-0•
NEW
W FRONT YARD SETBACK
BUILDING EXTENTS
02SETBACK ENCROACHMENT
SCALE: 3116"= lt-O%
TRUE
NORTH
PLANNED DEVELOPMENT CONDITIONS TABLE SITE DATA VARISPACE COPPELL
EXISTING ZONING 'HC'HIGHWAY COMAtERCW. DISTRICT
NADDITION, LOT 1, BLOCK A
SIGA SHOW ONSGNAGEEXHIBITT SIGNAGE ALLOWED FOR ENANFMONUMENiSIGNANDENTRYMONUMENT PROPOSEDUSES OFFICE, PARKING GARAGE 450 N FREEPORT
• VEHICULAR DIRECTIONAL SIGNAGE AS SHOWN ON SIGNAGE EXHIBIT
• 18•XSPARKINGALLOWED ATHEADTOHEAD PARKING STALLS ONSURFACE LOT SQUARE FOOTAGE 185,700SF OFFICE BUILDING/ 82,70 SF PARKING PREPARED BY:
• 18' X SPARKING ALLOWED AT HEAD TO HEAD PARKING STALLS IN PARKING GARAGE BUILDING AREA 63,8005E FOOTPRINT 186,637 TOTAL SF
• ONE LOADING DOCK ZONE PER EVERY 70,000 GSF OF OFFICE BOKA POWELL
• CONCRETE PANELS, CEMENT PLASTERING AND METAL PANEL FINISHES AS NOTED ON BUILDING HEIGHT 48'-9'TOP OF PARAPET 167,,7• TOP OF SCREEN WALL 8070 PARK LANE #300
ELEVATIONS AND SAMPLE BOARD
REQUIREDPARKING 619 REQUIRED/ 728 PROVIDED DALLAS, TX 76231
LITCOVERAGE 428560 LOT TOTAL SF/111,600 SF BUILDING + GARAGE =.26 LOT COVERAGE 972-701-9000
FLOOR AREA RATIO .42 PockefY&Okaprn 11mm
PLANNED DEVELOPMENT SITE PLAN VARISPACE 09.01.2021 PD1.01