Loading...
Admin Approval 10-18-22 Approval Correspondence1 Matt Steer To:Chris Delgado; Mahadin, Tariq; Jack Basil Foster Cc:Steve Pendleton; STEPHEN SCHUBERT Subject:RE: Pathgroup - Wintergreen - additional details Sorry for all the back and forth! This will suffice. I will print this email and save it with the approved Site Plan Amendment. @Jack Basil Foster please note the following for the permit: Both RTU-LAB-C Unit & Refrigeration units will be screened with the screening as depicted below. They will meet or exceed the height of the objects which they are proposed to screen on the south side of the building. Thanks, Matt Matthew Steer AICP, LEED® Green Associate Development Services Administrator City of Coppell, TX 972-304-3559 (office) 469-460-1807 (cell) www.coppelltx.gov From: Chris Delgado <Chris.Delgado@brandt.us> Sent: Tuesday, October 18, 2022 1:54 PM To: Matt Steer <MSteer@coppelltx.gov>; Mahadin, Tariq <Tariq.Mahadin@kimley-horn.com> Cc: Steve Pendleton <Steve.Pendleton@brandt.us>; STEPHEN SCHUBERT <Stephen.Schubert@coppelltx.gov> Subject: RE: Pathgroup - Wintergreen - additional details Matt, per our phone call, and the site plan and permit set of drawings submitted, both RTU-LAB-C Unit & Refrigeration units will be screened with the same material. See snip below from AS1.21 SCREEN WALL DETAIL (it shows the screen wall detail). The screen wall is a manufactured product, and is not “designed” by our architect or engineers. There are no additional isometrics or renderings. The structural steel and concrete dimensions designed by the structural engineer are shown on the drawings we have already submitted. See snip below from S.1.10 (it shows dimensions requested). Does this suffice? 2 RTU PLATFORM/SCREEN WALL DIMENSIONS 3 REFRIGERATION UNIT/SCREEN WALL DIMENSIONS 4 Thank you, CHRIS DELGADO, P.E. | SENIOR DESIGN BUILD PM THE BRANDT COMPANIES, LLC M 210.441.9185 Chris.Delgado@brandt.us | www.brandt.us From: Matt Steer <MSteer@coppelltx.gov> Sent: Tuesday, October 18, 2022 11:41 AM To: Mahadin, Tariq <Tariq.Mahadin@kimley-horn.com> 5 Cc: Chris Delgado <Chris.Delgado@brandt.us>; Steve Pendleton <Steve.Pendleton@brandt.us> Subject: RE: Pathgroup - Wintergreen - additional details Tariq, The isometric view shows this: This too should be screened. We discussed it needing to be screened with the same material. I am looking for a similar isometric view of the screening for the refrigeration units as well with dimensions. Please upload those, so I can sign off on the Site Plan Amendment. From: Mahadin, Tariq <Tariq.Mahadin@kimley-horn.com> Sent: Tuesday, October 18, 2022 10:49 AM To: Matt Steer <MSteer@coppelltx.gov> Cc: Chris Delgado <Chris.Delgado@brandt.us>; Steve Pendleton <Steve.Pendleton@brandt.us> Subject: Pathgroup - Wintergreen - additional details Matt, we have uploaded on the city website additional details per your request. The two sheets we uploaded now are: M-301. Pod A RTU ISOMETRIC (it show an isometric view of the equipment) AS1.21 SCREEN WALL DETAIL (it shows the screen wall detail) The full set of MEP and Arch plans have been submitted to the city (permitting department). Please let us know if you need anything else. Thank you 6 Tariq Mahadin, MLA, ASLA Kimley-Horn | 2201 W Royal Ln #275, Irving, TX 75063 Direct: 469 965 4908 | Mobile: 214 918 8842 Connect with us: Twitter | LinkedIn | Facebook | Instagram | Kimley-Horn.com Celebrating 15 years as one of FORTUNE’s 100 Best Companies to Work For CAUTION: This email originated from outside of the organization. Do not click links, open attachments, or take any action in response to this email unless you recognize the sender and know the content is safe.