Loading...
Eng.Dept. letter re projectJuly 28, 1989 Mr. James E. Nelson Project Engineer II Mobil Oil Corporation P. O. Box 660259 Dallas, Texas 75266-0258 RE: MOBIL OIL STATION AT MACARTHUR BOULEVARD AND BELTLINE ROAD COPPELL, TX Dear Mr. Nelson: The purpose of this letter is to respond to matters brought to your attention on July 14, 1989, at the above mentioned job site, concerning compliance with the City of Coppell codes and ordinances, as well as project modification to comply with the Dallas County Drainage project currently under construction on Beltline Road, adjacent to your project. A copy of this letter will be sent to each City of Coppell Department Head for the purpose of comments, review and approval of each item in which you have requested a variance, per your letter dated July 18, 1989. It is my understanding that the items you have listed to be considered, will be completed after Dallas County has completed its current drainage project adjacent to your Mobil station site on Beltline Road. If special consideration is granted to complete the pavestone handicap ramp, sidewalk, drive approach and landscaping along the north property line of Mobil Oil Station at a later date than your request for a Certificate of occupancy. It is my recommendation that all work be completed and acceptable to the City of Coppell no later that forty-five (45) days after Dallas County has completed its project, adjacent to your north property line. I would also like to list the following line items which must be complete before a temporary Certificate of occupancy approval can be granted by the City of Coppell. 2. 3. 4. 5. Replace cover on water meter box. Completion of traffic sensor loop and relocation of pull box on MacArthur Boulevard. Expose ring and covers on two sanitary sewer manholes on Beltline Road. Uncover and adjust to grade two existing water valve stacks on Beltline Road. Adjust and set to grade meter box over blow off at the east end of 12" water main on Beltline Road. 7. 8. 9. 10. ll. Complete and accepted permit including inspection of sanitary sewer manhole by Trinity River Authority. Approved stamped Engineering plans for the entire project. Complete compaction of excavation around sanitary sewer manhole and sewer tap on Beltline Road. Compliance with Dallas County construction request along your north property line at Beltline Road. Compliance with other City of Coppell Departments which are involved in final inspection and consideration for Certificate of occupancy. Compliance with all Valley Ranch requirements. If you have any questions regarding this matter, please advise. Sincerely, Larry Davis Construction Inspector LD/lsg xc: Russell R. Doyle, P.E., City Engineer Shohre Daneshmand, Civil Engineer Taryon Bowman, P&Z Coordinator Benjamin dela Cruz, Engineering Technician Dale Jackson, Building Official Steve Goram, Public Works Director Howard Pafford, Water Foreman Mostafa Setayesh, Dimension Group MOBILOIL