Engineering commentsGINN, INC.
CONSULTING
DATE:
TO:
ATTN:
FROM:
SUBJECT:
June 23, 1987
Planning and Zoning Department
Taryon Bowman, P&Z Coordinator
Ginn, Inc.
Chevron/Gulf Station S-1021
ENGINEERS
We have reviewed the above referenced subject for conformance to
city of Coppell subdivision ordinance, zoning ordinance,
streetscape plan and standards, and the following sets forth our
comments:
We have no objections for a specific use permit for the service
station, convenience store, or the car wash. Our comments are
from an engineering viewpoint only.
1. Subdivision ordinance does not allow "open ditches." The
ditch on the north side of the property should be enclosed.
2. Maximum drive widths should be 30', not 35' as shown, unless
variance requested and approved.
3. Provide distance to nearest drive, to south of property.
4. No sand cushion under pavement, unless fully supported by
soils investigation and analysis. Provide city with copy of
recommendation.
5. Monument sign appears to be in violation of sign ordinance.
Variance should be requested and approved prior ~o beginning
construction of sign.
6. Is canopy of building considered part of building and should
it be located within the building set-back line?
7. Provide owner's name, address.
8. Provide engineer's name, address.
9. Provide plat, with description, etc.
10. Provide signature blocks for P&Z and Council.
11. Water and sewer line in city right-of-way shall be by other
than open cut.
12. Minimum size drain in city right-of-way shall be 18" diameter
(8" is shown along east property line).
Gabe Favre
/jc
CC:
Wayne Ginn
Alan Ratliff
TB609305
17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900
PRO~ECTED FEES
CHEVRON/GULF ST&TION
THE FOLLOWXNG FEES ARE ASSESSABLE TO THE PROJ'ECT~
Zoning ............................................
Preliminary Plat ..................................
Final Plat ........................................
Other ............ . .................................
Water/Sewer Availability ..........................
Water Tap Fee .....................................
Sewer Connection Fee ..............................
Construction Permit Fee
1. Initial Deposit ..........................
2. 1.5% of Construction .....................
3. Actual Cost of Review/Inspection .........
Park Fund .........................................
Water Load Test ...................................
Street Lights .....................................
Street Signs ......................................
Street Assessment .................................
Pro-Rata Assessment ...............................
Special Assessments ...............................
Utility Inspections Fee ...........................
2o3.8o~L
lO4. oo
124.57 Fl..
2.04.04
100.00
100.00
432.00
NA
35,693.00
75.00
NA = NOT APPLICABLE OR NOT ASSESSABLE
* = UNKNOWN AT THIS TIME...TO BE DETERMINED AT A LATER DATE
Ginn, Inc.
P&ZFORM 0687/305