CC approval on 9/10/96 AGENDA REQUEST FORM
CITY CO~CIL MEETING: September 10, 1996 ITEM # /~
ITEM CAPTION=
PUBLIC HEARING: Consider approval of Case No. S-1113. Church of the
Apostles. Episcopal, to change the zoning from SF-7 (Single Family-7) to
SF-7, S.U.P. (Single Family-7, Special Use Permit), to allow the
construction of a church on 7 acres of property located on the east side of
MacArthur Boulevard, across from Starleaf Street.
SUBMITTED BY%/ Gary L. Sieb
TITLE: \~ Director of Planning and Community Services. ~
STAFF RECOMMENDS~. ...... Approval ~ ................ Denxal
STAFF COMMENTS:
Date of P&Z Meeting: August 15, 1996
Decision of P&Z Commission: Approval (6-1) with Commissioners Lowry,
Wheeler, McCaffrey, Cruse, Redford and Reyher in favor. Commissioner
Stewart opposed.
Please see attached for conditions of approval.
APPROVED
DATE
BUDGET AMT. $ AMT. EST. $ +/- BUD:
L
FINANCIAL COMMENTS:
DIR. INITIALS: FIN. REVIEW CITY MANAGER REVIEW:
Agenda Request Form - Revise~l 6/96 Document Name S-I 113.pz
Sj~llClx~ & Saw~ docummnt -- Put "r,o]dem,od'imlXW m jnm~' '
AGENDA REQUEST NARRATIVE
8-1113, Church of the ~Dostles, Episcopal
Conditions for approval:
Subject to the Site Plan and the following conditions:
(1) A median break and left turn lane will be constructed on MacArthur
Boulevard at the church entrance at the time that a building permit
for Phase II is pulled;
(2) the applicant must seek a 24-27' easement accessing the northern
property to Starleaf Street.
(3) revise building elevations to reflect the type and color of building
materials to be used, as follows:
Exterior Building Walls: Austin Hill Country Limestone,
"block and chop", ashlar
pattern, standard color mortar
Building Roof: Metal standing rib roof,
painted Berridge patina green
Fascia, eves, soffit,
windows, doors, door
frames, sun shades and
trellis, and all misc. trim
(gutters and down-spouts,
if used): Glidden Forrest Black, 30YY
10/038 factory finish or field
applied
(4) a revision be made on the Master site Plan indicating that the playing
fields will be built during the construction of Phase I or II;
(5) the Hike/Bike trail will not be required to be built on church
property; and
(6) compliance with Engineering comments as follows:
Master $ff~ Plan
1) A left mm lane and median opening should be constructed along with the Phase H
development.
2) The Carrollton-Farmers Branch School District should be approached about obtaining a
private access easement from the north property line of the church to the south right-of-way
line of future Starleaf Street for a second point of access in the future.
3) To ensure the City can access our sewer line in the future, no' improvements should be
constructed in the sewer easement. This includes re)zinirlg walls and monument signs.
Site Plan
1) 6" thick 3000 psi reinforced concrete on a lime stabilized base is required in the f'u'e lane and
5" 3000 psi on a lime stabilized base in the parking areas. Remove reference to 4" concrete.
2) Br/ck paver band should be 8' wide and one foot inside the property line.
3) Remove monument sign from existing sewer easement.
/~]/~8/~.cjc]E 14' 15 8177~7220~ ~EIf.~$4AH ARCHITEOTS
~ ~ c ~ ~ T ~ C T
August ~, ~gg~
Mr. M~k ~ Churc~ of t~e Apogees,
C~rroll(on- Fgrmers Brach I.~.D. M~cA~ur, ~. Condor ~nd ~rle~f
1~5 NO~ Ter~ Ro~ Cop~il, Tex~s
Ca~ollton, Texas 7~ New Church Building
D~ Mr. Hya~,
We have been r~uest~ by ~e Planning ~ Zoning B~ of ~e Ci~ of Cop~II, in ~ir
review and recommenda~on of approval of our site ~d building desi~ at ~eir mee~ng
August 15, 19~, to commence n~ofia~on8 ~ your o~ce at ~e C~ollton - F=mers
Branch I,S.D. to o~n an access e~ement to the fu~re S~eaf S~eet. This easement
would e~nd from our ~o~ line to ~e ~opo~ ~tension of S~leaf Str~ ~ ~ wide
ROW to ~ Io~ on ~e ~ollton - Farmers Branch I.S.D. ~o~.
We have aUach~ a drawing s~ng ~e e~t of t~is e~ement, 7.74 ~. by 28 ~., ~d
I~on, 1~ ~. e~t s~ east of Ma~ur at our ~int pro~ line. T~e access easment
is r~uir~ by our joint ~o~ line o~t ~om ~e e~ng ~eaf S~eet ROW W 7.74 ~.,
and ~e ~gi~ring ~~ of ~l~ing ~e ~w s~eet e~ension wi~ the e~ing
We r~ize ~t ~e ~rollton * F~mers Brach I.S.D. may ~ave a numar of questions
r~rdlng ~me ~ie a~ your development intentions for y~r pro~. But we ~lteve we
c~ ~s~ ~e CtW of Cop~li's r~uirements ~ moving forew~d in our n~o~a~ons
wl~in t~ limits of your con~aints.
Sincerely,
Arthur W. Weinman, A.I.A. -
AWW:es
Enclosure
cc: Gary Sled John Nelson Doug Reinhardt
Jim Witt MicMael Choucalas Carol Green
~)777 Como BOwie
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
CASE NO: S-1113, CHURCH OF THE APOSTLES,
EPISCOPAL
P & Z HEARING DATE: August 15, 1996
C.C. HEARING DATE: September 10, 1996
LOCATION: East of MacArthur Boulevard, across from Starleaf Street
SIZE OF AREA: 7 acres; Building(s) Phase I - 9,500 sq. ft.
Phase H & Ill- 12,000 sq. ft.
Phase IV- 14,000 sq. ft.
TOTAL- 35,500 sq. ft.
CURRENT ZONING: SF-7 (Single Family-'/)
REQUEST: SF-7-S.U.P. (Single Family-7, Special Use Permit)
APPLICANT: Owner: Architect:
Church of the Apostles, Episcopal Arthur Weinman
700 East Sandy Lake Rd., Suite 120 6777 Camp Bowie Blvd.
Coppell, TX 75019 Fort Worth, TX 76116
(214) 462-0234 (817) 737-0977
HISTORY: No platting history.
TRANSPORTATION: MacArthur Boulevard is a 4-lane divided major thoroughfare shown
on the thoroughfare plan as a P6D 6-lane divided major
thoroughfare within the existing 110' wide fight-of-way. Starleaf
Street is a residential street in a 60' wide fight-of-way
SURROUNDING LAND USE & ZONING:
North - vacant; "TH-l" Townhouse zoning
South - vacant; "SF-7" Single Family-7 zoning
East vacant; "SF-7" Single Family-7 zoning
West - Single family residential; uSF-7" Single Family-7 zoning
Item # 5
COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for
park and open space.
DISCUSSION:
Although churches are recognized as allowable uses in all zoning districts, the Special Use
Permit better guarantees how church properties will develop. As depicted on the submitted
master plan, this church site will be developed in four phases. The first phase of construction
will consist of a parish hall, offices and classrooms measuring close to 9,500 square feet.
During this phase of construction the church will also develop its playing fields on the rear
portion of its property.
During Phases II and nI the church will erect an additional 12,000 square feet of building which
will consist of a school, supplementary classrooms and meeting rooms. The fourth and last phase
of development will involve the construction of the Church which will seat approximately 500
people and additional offices and meeting rooms all totaling to approximately 14,000 sq. ft.
In addition, on the front portion of the property in the 90 foot wide landscape area construction
of a bridal pavilion, amphitheater and water feature are being proposed for this last phase. The
bridal pavilion observes the 25 feet front yard setback. The applicant might consider visually
and audibly screening it from passing traffic on MacArthur Boulevard or consider relocating to
another site on the property.
The building elevations which were submitted do not specify the type and color of the stone to
be used. It is staff's understanding, that the applicant intends to use an off- white stone similar
to the Austin stone used on the orthodontics clinic on Denton Tap Road. That being the case,
staff does not object to the building material.
Although generally in conformance with staff comments, it needs to be made clear that at some
future date, the Church will need to participate in the cost of construction of a median break in
MacArthur Boulevard. At this time a letter of financial commitment is satisfactory. Also, there
is some question regarding the extension of Starleaf Street with the architect of this project
expressing an opinion that the church property does not abut the extended street. That statement
warrants additional dialogue at the public hearing. Finally, there is some question regarding the
location and the cost of constructing the hike/bike trail on church property when the city owns
the property immediately south of the church. The added construction burden on the church is
at issue here, with the church feeling the hike/bike trail would better serve the park land if the
trail were located on city property.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff recommends approval of the Special Use Permit subject to the following conditions being
meet:
1) Revise building elevations to reflect the type and color of building materials to
be used.
2) List the construction of the playing fields under Phase I on the Master Site Plan.
Item # 5
3) Consideration of the location of the Hike/Bike trail.
4) Clarification regarding the median cut financial obligation and Starleaf improvement
responsibilities.
5) Compliance with Engineering comments.
ALTERNATWNS: 1) Recommend approval of a Special Use Permit
2) Recommend disapproval of a Special Use Permit
3) Recommend modification of a Special Use Permit
ATTACHMENTS: 1) Master Site Plan
2) Floor Plan
3) Title Survey
4) Boundary and Topography Survey
5) Building Elevations
6) Exhibit of Starleaf Street at MacArthur Boulevard
7) Departmental Comments
Item # 5
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: S-IllS. Church of the Apostles. Episcopal. zoning change from $F-
7 (Single Family-7) to $F-7-$. U.P. (Single Family-7, Special Use
Permit) to allow the construction of a cburck on 7 acres of
property, located at the southeast comer of MacArthur Blvd. and
Stadeaf Street, at the request of Arthur Weinman Arckitects.
DRC DATE: July 25, 1996 and August 1, 1996
CONTACT: ~W~e Martin, E. L T., Assistant City Engineer (304-3679)
PRELIMINARY ~REVISED
AFTER P&Z
Master Site Plan
1) A left turn lane and median opening should be constructed along with the Phase II
development.
2) The Carrollton-Farmers Branch School District should be approached about obtaining a
private access easement from the north property line of the church to the south right-of-way
line of future Starleaf Street for a second point of access in the future.
3) To ensure the City can access our sewer line in the future, no improvements should be
constructed in the sewer easement. This includes retaining walls and monument signs.
Site Plan
1) 6" thick 3000 psi reinforced concrete on a lime stabilized base is required in the fire lane and
5" 3000 psi on a lime stabilized base in the parking areas. Remove reference to 4" concrete.
2) Brick paver band should be 8' wide and one foot inside the property line.
3) Remove monument sign from existing sewer easement.