P&Z letter of approval 8/15/96- ISAB~T.T.E MO~O
Coppell, Texas 75019
78With A Beautiful Future 214-462-0022
Coppell, Texas 75019
August 19, 1996
Church of the Apostles, Episcopal
700 East Sandy Lake Road, Suite 120
Coppell, TX 75019
RE: S-1113. Church of the Apostles. Episcopal
Dear Father Smith:
This letter is to inform you that Case No. S-1113, Church of the Apostles, Episcopal, zoning
change from SF-7 (Single Family-'/) to SF-7-S.U.P. (Single Family-7, Special Use Permit) to
allow the construction of a church on 7 acres of property located on the east side of MacArthur
Boulevard, across from Starleaf Street was recommended for approval by the Coppell Planning
and Zoning Commission on Thursday, August 15, 1996, subject to the Site Plan and the
following conditions:
1) A median break and left turn lane will be constructed on MacArthur Boulevard
at the church entrance at the time that a building permit for Phase II is pulled;
2) the applicant must seek a 24-27' easement accessing the northern property to
Starleaf Street.
3) revise building elevations to reflect the type and color of building materials to be
used, as follows:
F. xterior Building Walls: Austin Hill Country Limestone, 'block and
chop', ashlar pattern, standard color mortar
Building Roof: Metal standing rib roof, painted Berridge
patina green
Fascia, eves, soffit, Glidden Forest Black, 30YY 10/038, factory
windows, doors, door finish or field applied
frames, sun shades and
trellis, and all misc. trim
(gutters and down-spouts,
if used)
4) a revision be made on the Master Site Plan indicating that the playing fields will
be built during the construction of Phase I or II;
5) the Hike/Bike trail will not be required to be built on church property; and
6) compliance with Engineering comments (see attachmen0.
The date scheduled for consideration by the Coppell City Council is Tuesday, September 10,
1996, at 7:30 p.m. A representative for this case must be present at this meeting. Failure to
represent this item may result in the denial of this application.
If you have any questions, please contact me at (214) 304-3675.
Sincerely,
Pert Virtanen
Assistant Director of Planning & Community Services
cc: Arthur Weinman, Architect
Isabelle Moro, P&Z Coordinator
Building Inspection
U g~ - ~'
DEVELOPMENT REVIEW COMMI
ENGINEERING COMMENTS
ITEM: Church o! the Apostles. ~pal AddiSon. Lot 1. Block A.
Preliminary Plat. to allow the consgmcgio# o! a church on 7 acreg
o. f property, located at the southeast comer o~ MacAflhur BIpd. and
StarleaJ ~reet, at the request of Arthur Weinm~ Arvhitect~.
DRC DATE: July 25, 1996 and August 1, 1996
CONTACT: Mike Martin, E.I.T., Assistant City Engineer (304-3679)
PIIE LIMINA Il Y RE VISED
AIRIER P&Z
1) Show f'mished floor elevation of the building.
2) Show all easements. This includes the existing sanitary sewer with volume and page number
and any other easements necessary for the water meters and vaults.
Master Site Plan
1) A left turn lane and median opening is necessary for southbound traffic to enter the site.
2) A northbound deceleration lane may be needed off of MacArthur Blvd.
3) Reconfigure northern corner of site plan to provide a second point of access to Starleaf St.
This will 'require the construction of a part of Starleaf St.
4) To ensure the City can access our sewer line in the future, no improvements should be
constructed in the sewer easement. This includes retaining walls and monument signs.
Site Plan
1) 6" thick 3000 psi reinforced concrete on a lime stabilized base is required in the fire lane and
5" 3000 psi on a lime stabilized base in the parking areas. Remove reference to 4" concrete.
2) Brick paver band should be 8' wide and one foot inside the property line.
3) Remove monument sign from existing sewer easement.