CC letter of approval 9/10/96 ISABELLEMORO
7
Coppell, Texas 75019
September 11, 1996
Church of the Apostles, Episcopal
700 East Sandy Lake Road, Suite 120
Coppell, TX 75019
RE: S-1113. Church of the Apostles. Episcopal
Dear Father Smith:
This letter is to inform you that Case No. S-1113, Church of the Apostles, Episcopal, zoning
change from SF-7 (Single Family-7) to SF-7-S.U.P. (Single Family-7, Special Use PermiO to
allow the construction of a church on 7 acres of property located on the east side of MacArthur
Boulevard, across from Starleaf Street was approved by the Copper City Council on Tuesday,
September 10, 1996, subject to the Site Plan and the following conditions:
1) A median break and left turn lane will be constructed on MacArthur Boulevard
at the church entrance at the time that a building permit for Phase H is pulled;
2) the applicant must seek a 24-27' easement accessing the northern property to
Starleaf Street.
3) revise building elevations to refiect the type and color of building materials to be
used, as follows:
Exterior Building Walls: Austin Hill Country Limestone, "block and
chop", ashlar pattern, standard color mortar
Building Roof: Metal standing rib roof, painted Berridge
patina green
Fascia, eves, soffit, Glidden Forest Black, 30YY 10/038, factory
windows, doors, door finish or field applied
frames, sun shades and
trellis, and all misc. trim
(gutters and down-spouts,
if used)
4) a revision be made on the Master Site Plan indicating that the playing fields will
be built during the construction of Phase I or H;
5) the Hike/Bike trail will not be required to be built on church property; and
6) compliance with Engineering comments (see attachment).
In order to prepare an Ordinance, we need to assemble appropriate documentation. When this
has been completed and the Ordinance has been approved by Council, a copy will be sent to
you.
If you have any questions, please contact me at (214) 304-3675.
Sincerely,
I~irector Of Planning & Community Services
~: Michael Choucalas
Isabell¢ Moro, AICP, P&Z Coordinator
Building Inspection
ITEM: Clmrek Of tltt ~s. ~ A_ ~_~ rnt 1. Block ~
DA : 2s,
CO,ACT: ~ ~ KI.T., ~ ~ ~~
COMME~ ~TA~S: P~LIMINARY /~N~ ~~ED
1) Show fi~shed floor elevation of ~e building.
2) Show ~1 ~men~. ~ ~clud~ ~e ex~fing ~ ~wer wi~ vol~e ~ page
~ ~y o&er ~men~ m~ for ~e wamr me~ ~d vault.
M~ter S~e P~
1)., A le~ m~ l~e and medi~ o~ng is mc~s~ for sou~ ~ffic m enter ~e site.
2) ~.A no~und d~ele~tion l~e may ~ ne~ off of Mac.ur Blvd.
3) ~co~ m~em co~r of site pl~ ~ p~vide a ~co~ ~t of a~ess to S~I~ St.
~s w~l ~equ~ ~e co~ction of a p~ of S~l~f
4)'To ~ ~ CiF c~ ac~s our ~wer I~ ~ ~e ~, ~ ~pmveme~ should
co~c~ ~ ~e ~wer ~ment. ~s ~ludes m~ining w~s ~ mon~e~ si~.
SUe P~
1) 6" ~ck 3~ psi rei~orced concrete on a l~e s~bil~ed b~ is ~qu~ed ~ ~e f~e l~e
~" 3~ psi on a l~e s~bil~ed base in ~e park~g ~as. Remove refe~nce to 4~ conc~te.
2) Brick paver band should ~ 8' wide and one f~t ~ide ~e pro~ 1~.
3) Remove mon~em sign from exist~g ~wer e~mem.